|
|
Exploration on the Issue Related to Operate Suburban Passenger Train by Using Railway Terminal Lines |
BAI Bao-ying,YANG Wei-sheng |
The Third Railway Survey and Design Institute Group Corporation,Tianjin 300142,China |
|
|
Abstract Research purposes: It is not only to make full use of railway resources for operating suburban passenger train by using large city railway terminal,but also plays a significant role in the aspects including improving and optimizing the urban rail transit system,reasonably using the rail transit resources,cooperating and guiding the construction and development of the city.
Research conclusions :(1)Urban rail transit system should be designed based on the connection intension of central city,suburban and exurban,with different levels of rail transit configuration. Developing the suburban railway can improve the rail transit system of large cities. ( 2)The railway which has spare capacity in Beijing railway terminal can be a part of the urban rail transit system,and undertakes the function of urban rail transit.(3)There are three patterns on developing the suburban railway:extending the urban rail transit,taking advantage of existing railway by appropriate transformation to have the function of operating suburban passenger train,newly building suburban railway. ( 4)This research has reference meaning for the construction of large urban rail transit system and carrying out research on undertaking urban rail transit function by taking advantage of lines in existing railway terminal.
|
Received: 22 October 2013
|
|
|
|
|
[1]铁道第三勘察设计院集团有限公司.北京现有铁路网资 源利用开行市郊铁路及部门协调机制研究[R].天津:铁 道第三勘察设计院集团有限公司,2012.
The Third Railway Survey and Design Institute. Study on Beijing Existing Railway Network Resource Utilization and Operating Suburban Railway and Sectoral Coordination Mechanisms[R].Tianjin; The Third Railway Survey and Design Institute,2012.
[2]铁道部工程设计鉴定中心.全国铁路主要枢纽规划图集 [Z].北京:铁道部工程设计鉴定中心,2012.
Engineering Design and Appraisal Centre , Ministry of Railway. The Planning Atlas of Main Terminal of National Railway [ Z ].Beijing; Engineering Design and Appraisal Centre , Ministry of Railway , 2012.
[3]北京市发展改革委.北京市城市轨道交通近期建设规划 调整(2007~2016年)[R].北京:北京市发展改革委, 2012.
Development and Reform Commission of Beijing. Beijing Rail Transit Construction's Planning Adjustment in the Near Future(2007~2016)[R].Beijing ; Development and Reform Commission of Beijing, 2012.
[ 4 ] GB 50091-2006,铁路车站及枢纽设计规范[S].
GB 50091-2006 , Code for Design of Railway Station and Terminal [ S ].
[5」GB 50090-2006,铁路线路设计规范[S].
GB 50090-2006 , Code for Design of Railway Line [ S ].
[ 6 ] GB 50157-2003,地铁设计规范[S].
GB 50157-2003 , Code for Design of Metro [ S ].
|
|
|
|