PRESTRESSING FORCE CONSTRUCTION FOR CANTILEVER CURVED GIRDER BRIDGE |
Chan Kawang |
The fif th Engineering Bureau of MO R |
|
|
Abstract The peper a naly zes the prest ressing fo rce co nst ructio n pro perties of the fi rst rai lw ay cantilever curved gi rder bridg e in china , and introduces tho se w ays to deal wi th i t , the cont rast experiment of the curved gi rder hole-f rictio n drag in field and indoo r, the steel-cable st retching amount calcula tion method and the comperion the field measured data to the ca lculation data, the effect the prestressing fo rce const ruction to the curv ed gi rder internal fo rce and displacement.
|