Abstract Research purposes : The bottom of railway tunnel is the bearing structure of train operation,quality defects easily induce operating tunnel floor heave,mud pumping,cracking and other diseases,thus seriously interfere with the transport,affect driving safety,economic loss is very large. So the evaluation of the hierarchy and treatment scheme of concrete quality defects at the bottom of railway tunnel is necessary.
Research conclusions : (1) The root cause of quality defects at the bottom of tunnel is the weak site management,
therefore,must strengthen management, and strengthen inspection and supervision, to avoid thequality defects at the bottom of the tunnel. (2) The defect area ratio and the defect thickness ratio are used to evaluate structure defects at the bottom of railway tunnel,the results of the evaluation can be divided into five levels : slight,more serious,serious,very serious and extremely serious. (3) According to different defect, the corresponding processing schemes such as grouting,grouting + anchor,dismantlement and redoing can be adopted. Taking the dismantlement and redoing,less than lining shutter length 3 m as a dismantled length unit, by the finite element numerical simulation and field application,has little influence on surrounding rock,initial support and secondary lining,and is safe. (4) The research results can be used for quality rating and processing of railway tunnel concrete.
|
Received: 24 April 2015
|
|
|
|
|
TB 10121—2007,Technical Code for Monitoring Measurement of Railway Tunnel [S].
|
|
Railway Construction [ 2010 ] No. 241,Technical Guide of Construction of High - speed Railway Tunnel Engineering[S].
|
[2] |
铁建设[010]241号,高速铁路隧道工程施工技术指南[S].
|
[3] |
张民庆,彭峰.地下工程注浆技术[M].北京:地质出版 社,2008.
|
|
Zhou Bin,Zhao Feng,Jiang Jian,etc. Application of Ground Penetrating Radar in Detecting Defect of Tunnel Lining [J]. Journal of Railway Engineering Society, 2012(5) :42-46.
|
[4] |
周斌,赵峰,江剑,等.探地雷达在隧道衬砌缺陷检测中的 应用[J] .铁道工程学报,012(5) :42-46.
|
|
Zhang Minqing,Peng Feng, Grouting Technology of Underground Engineerings [ M ], Beijing : Geological Publishing House,2008.
|
|
Nie Rusong,Leng Wuming, Yang Qi. Detection Test and Condition Assessment on Existing Heavy Huai Railway Subgrade [ J ]. Journal of Railway Engineering Society,2014(11):22-26.
|
[1] |
TB 10121 —2007,铁路隧道监控量测技术规程[S].
|
[5] |
聂如松,冷伍明,杨奇.既有重载铁路路基检测试验与状 态评估[J].铁道工程学报,014(11):22-26.
|
|
|
|