Abstract Research purposes: There are various underground barriers in subway tunnel construction,which need be emoved efficiently and in time. Based on the river - crossing subway tunnel section of Line No. 2 of Wuhan Metro,this paper systematically introduced the underground barriers clean - up technology for subway shield tunnelling by artificial ground freezing method. Then,it discussed the safety issues of cleaning - up barriers with pressure by artificial ground freezing method from the stability of frozen soil and the impact on the surrounding environment. As its complex geological conditions and surrounding environment,underground barriers clean - up easily lead a great impact on the surrounding environment due to its high risks,so it is important for us to choice correct method to clean up underground barriers.
Research conclusions: The key of the underground barriers cleaning - up technology by artificial ground freezing method is the closure and quality of the frozen soil. After the frozen soil temperature is at - 10 ℃ ,the underground barriers was cleaned up successfully,and the heave and melt effect in the soil was controlled within ± 6mm. It provided an effective control of the construction safety risks,and reduce the effect to the construction environments,which gives a good benefit to other similar construction projects.
|
Received: 12 November 2012
|
|
|
|
|
[1] 周诚,周少东,林涛等. 城市地铁隧道区间浅埋暗挖施工地表沉降控制研究[J]. 施工技术,2011( 19) : 70 -74.
Zhou Cheng,Zhou Shaodong,Lin Tao,etc. Study of Surface Settlement Control Caused by Construction with Shallow Tunnel by Excavation in Metro Tunnel[J]. Construction technology,2011( 19) : 70 - 74.
[2] 杨太华. 越江隧道工程联络通道冻结法施工风险分析[J]. 地下空间与工程学报,2010( 6) : 1201 -1206.
Yang Taihua. Risk Analysis of Freezing Method Applied to Adjacent Passage Construction of Cross - River Tunnel Project [J ]. Chinese Journal of Underground Space and Engineering,2010 ( 6 ) : 1201 - 1206.
[3] 陈弢,胡向东. 盾构隧道修复工程中的垂直冻结加固应用[J]. 合肥工业大学学报( 自然科学版) ,2009( 10) : 1542 - 1546.
Chen Tao,Hu Xiangdong. Appliacation of Vertically Freezing Reinforcement in Recovery Work of a Shield Tunnel[J]. Journal of Hefei University of Technology ( Natural Science) ,2009( 10) : 1542 -1546.
[4] 桂林. 广州轨道交通五号线盾构施工关键技术[J]. 铁道工程学报,2007( 11) : 76 -82.
Gui Lin. Key Construction Technologies in Shield Tunneling of Guangzhou Metro Line 5[J]. Journal of Railway Engineering Society,2007( 11) : 76 - 82.
[5] 胡向东,肖朝昀,毛良根. 双层越江隧道联络通道冻结法温度场影响因素[J]. 地下空间与工程学报,2009( 1) : 7 - 12.
Hu Xiangdong, Xiao Zhaoyun, Mao Lianggen. The Influencing Factor of the Temperature Field of Cross - passage Construction by Freezing Method in Double - Deck Road Tunnels [J ]. Chinese Journal of Underground Space and Engineering,2009( 1) : 7 - 12.
[6] 李国成,丁烈云. 武汉长江隧道盾构施工引起的地表沉降预测[J]. 铁道工程学报,2008( 5) : 59 -62.
Li Guocheng, Ding Lieyun. Ground Settlement Inducced by Shield Construction of Wuhan Yangtze River Tunnel [J]. Journal of Railway Engineering Society,2008( 5) : 59 - 62.
|
|
|
|