Abstract Research purposes : The Baluntai - Kaitele Railway in Xinjiang is located in the high elevation area with high mountain,steep slope and complex topographical conditions. The most of planed tunnels for the railway will be the large tunnels with one after another. Selection of the reasonable main railway technical standards, such as traction type, limited gradient, locomotive type and tractive tonnage, is crncial to the constmction investment and the project operation. In this paper,the suitable main technical standards for this railway are presented for providing the reference to the similar works.
Research conclusions :(1) Based on the analysis of the various types of traction,it is recommended to use the electric locomotive. (2) Based on the analysis of the railway function orientation and the features of the traffic volume, it is recommended to adopt the balanced gradient scheme. Namely,the 6 ‰ limited gradient will be used for the heavy - haul direction and the 22‰ limited gradient will be used for light - haul direction. (3) In order to meet the demands of the tractive tonnage and the traffic capacity of this railway,it is recommended to use SS7 locomotive with the tractive tonnage of 3000t on consideration of the coordination with the adjacent railway network and making full use of the maintenance devices. (4) The demonstrations of the traffic security and the adaptability of the traffic organization show the main technical standards used for this railway are good in the operation and saving the construction investment. (5 ) The research result can be as the basis for the selection of the main technical standards for the mountain railway with the complex topographical conditions.
|
Received: 15 March 2013
|
|
|
|
|
[1]中铁第四勘察设计院集团有限公司.巴伦台至开特勒铁路专用线预可行性研究报告[R].武汉:中铁第四勘察设计院集团有限公司,2011.
China Railway Siyuan Survey and Design Group Co. Ltd. The Preliminary Feasibility Study Report on Baiuntm - Kaitele Railway [ R ]. Wuhan; China Railway Siyuan Survey and Design Group Co. Ltd, 2011.
[2]乌鲁木齐铁路局?乌鲁木齐铁路局列车运行图技术资料 [Z].乌鲁木齐:乌鲁木齐铁路局,2011.
Ummqi Railway Bureau. Unimqi Railway Bureau of the Train Diagram Information Technology [ Z ]. Urumqi :Urumqi Railway Bureau, 2011.
[3] TB/T M07—1998,列车牵引计算规程[S].
TB/T 1407—1998, Train Traction Calculation Rules [S].
[4]中华人民共和国铁道部.铁路技术管理规程[M].北京,中国铁道出版社,2006.
Ministry of Railway of the People’ s Republic of China. Railway Technology Management Discipline [ M ]. Beijing:China Railway Publishing House,2006.
[5]马孝川.关于我国铁路均衡坡度的研究[J].铁道工程学报,1989(3):22-27.
Ma Xiaochuan. Study on Equilibrium Slope Railway in China[ J]? journal of Railway Engineering Society, 1989 (3):22-27.
[6]铁道部运输局装备部.铁路机车概要[M]?北京:中国铁道出版社,2009.
Bureau of Transportation Equipment Department of the Ministry of Railway. Railway Locomotive [ M ]. Beijing : China Railway Publishing House ,2009.
[7]张曙光.和谐型大功率交流传动机车技术丛书[M].北京:中国铁道出版社,2009.
Zhang Shuguang. Harmonious High - power AC Drive Locomotive Technology [ M ]. Beijing: China Railway Publishing House,2009.
[8]铁运[2000]16号,机车操作规程[S].
Railway Transport [ 2000 ] No, 16, Locomotive Operation Rules[S].
[9]乌鲁木齐铁路局.乌鲁木齐铁路局行车组织规则[M].北京:中国铁道出版社,2000.
Ummqi Railway Bureau. Urumqi Railway Bureau of the Transport Rules [ M ]. Beijing ; China Railway Publishing House ,2000.
[10]铁道部第二勘察设计院,铁道部第三勘察设计院.铁路运量与行车组织[M].北京:中国铁道出版社,1992.
The Second Survey and Design Institute of MOR, The Third Survey and Design Institute of MOR- Railway Traffic Volume and Traffic Organization [ M ]. Beijing : China Railway Publishing House, 1992.
|
|
|
|