|
|
Discussion on Tendering Strategy and Organization for Railway Survey and Design Project |
LIN Bo |
China Railway Engineering Consultant Group Co. Ltd,Beijing 100055,China |
|
|
Abstract Research purposes: The tendering for the survey and design project is the main business resource. With the deepening of the railway reform in China,the tendering works for the survey and design project have been sequenced, normalized,institutionalized and scientific. This paper studies the main issues on the tendering for the survey and design project,including the person selection, tendering countermeasures and tendering organization, analyzes the common problems in the tendering works,presents the tendering countermeasures and discusses how to well do the tendering organization works under new market environment.
Research conclusions :(1) The entries should have a stable tendering team composed of the management persons, technical persons and businessmen. (2) According to the bidding documents,the tendering team should do a comprehensive study on the project feasibility and know the detailed information about the owner and the other tenders so as to make the suitable tendering decision. (3) The segment control should be strengthened to avoid making the small mistakes. (4) The development of the overseas market should be strengthened to seek the chance to cooperate with the overseas famous consulting enterprise for building the survey and design team which is good at the management and technology and familiar with the operational mode and rule of the overseas projects. (5) The study on the tendering strategy and organization for the railway survey and design presented in this paper can also provide the reference to the other in dustiest.
|
Received: 22 March 2013
|
|
|
|
|
[1]焦银禾.建设工程招投标及博弈论应用[M ].北京:中国铁道出版社,2009.
Jiao Yinhe. The Construction Project Bidding and the Application of Game Theory [ M ]. Beijing : China Railway Publishing House,2009.
[2]赵曾海.招标投标操作实务(第2版)[M].北京:首都经济贸易大学出版社,2012.
Zhao Zenghai. Practice of Bidding ( Second Edition ) [M ]. Beijing: Capital University of Economics & Business Press,2012.
[3]高明军,陈建康.水利水电勘测设计投标管理浅析[J]. 四川水利,2004(6) :46 -48.
Gao Mingjnn, Chen jiankang. Analysis of Bidding Management of Survey and Design of Water Conservancy and Hydropower [ J ]. Sichuan Water Resources 2004(6) :46-48.
[4]李光.投标报价的决策、策略与技巧研究[J].铁道工程学报,2007(3) : 99 -102.
Li Guang. Research on the Decisions,Strategies and Skills Regarding Price Bidding[ J]. Journal of Railway Engineering Societry,2007(3) : 99 -102.
[5]潘国强.国际项目勘察设计工作探索[J].铁道工程学报,2012(8) : 99-101.
Pan Guoqiang. Exploration on Surevy and Design Work of International Project [ J ]. Journal of Railway Engineering Societry,2012(8) : 99 -101.
|
|
|
|