Journal of Railway Engineering Society  2016, Vol. 33 Issue (3): 37-42    DOI:
Railway and Rail Current Issue | Archive | Adv Search |
Analysis of Harmonic Response of CRTS Ⅱ Prefabricated Slab Track with Anti - vibration Structure
REN Juan - juan1,ZHAO Hua - wei1,LI Xiao1,XU Kun2
(1. MOE Key Laboratory of High - speed Railway Engineering, Southwest Jiaotong University, Chengdu, Sichuan 610031,China;2. China Railway Siyuan Survey and Design Group Co. Ltd,Wuhan,Hubei 430071,China)
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech