|
|
Research on the Location and Junction Scheme of Harbin Railway Depot |
ZHANG Jian – hua |
(China Railway First Survey and Design Institute Group Co. Ltd,Xi’an,Shannxi 710043,China) |
|
|
Abstract Abstract:Research purposes: The depot is a very important part of railway marshalling station. The railway junction scheme of a depot to an existing marshalling station is closely related to the layout type of the station. By studying the railway junction scheme of tlie Harl)in depot,this paper put forward the factors that should be considered in studying a depot jointing to an existing marshalling station,which can be the reference to similar constructions. Research conclusions:(1) Grade separation scheme is a priority choice for a depot, however when it is limited by terrain or the layout type of tlie station,the level crossing joint scheme is permitted. (2) I the shunting intersect the receiving - departure route or the depot connecting line crossing the main line,we shall check and calculate the carrying capacity and choose the most economical scheme when the carrying capacity is acceptable. (3) When the depot joint to an existing marshalling station, it is recommended to choose a level crossing joint scheme which can reduce the construction costs and minimize the influence during constructing. ( 4 ) The two feasible joint scheme of depot in rail station and their pre - conditions presented in this paper can provide references for station design.
|
Received: 24 February 2017
|
|
|
|
|
|
|