铁道工程学报  2013, Vol. 30 Issue (9): 111-115    DOI:
Current Issue | Archive | Adv Search |
Study on Optimization of Construction Schemes for New Tunnel Under-pass the Existing Subway Station at Short Range
ZHU Zheng-guo, YU Jian-tao, ZHU Yong-quan, WANG Jin-tao
Shijiazhuang Tiedao University, Shijiazhuang, Hebei 050043, China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech