铁道工程学报  2013, Vol. 30 Issue (6): 4-9    DOI:
Current Issue | Archive | Adv Search |
Study on Timing of Building Beijing——Shenyang High——speed Railway
LI Yong—jin
The 3rd Railway Survey and Design Institute Group Corporation,Tianjin 300142,China
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech