Analysis of Slope Landslide of Taigong Station of Lanzhou - Chongqing Railway |
QIANG Xin-gang |
China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031,China |
|
|
Abstract Research purposes:When digging to earth - rock interface of the right cutting surface,multiple retrogressive tensile fractures appeared to the right ground of the cutting of the end area of the Taigong Station and the varying degrees of slide also appeared to the right slope to form the engineering landslide. Through analyzing the reasons for the engineering slope of the Taigong Station of the Lanzhou 一 Chongqing Railway, this paper puts foreward the treatment measures and ideas on how to strengthen the survey of high slope and deep cutting area and summarize the survey and test methods fo providing the reference to the similar projects.
Research conclusions:1) When the cutting soil layer is rather thick,the retaining engineering should be done first in the construction process and the monitoring of the slope on the both sides should be strengthened. ( 2 ) In the thick red soil layer area, the necessary retaining measures should be taken to the soil cutting or half soil and half rocky cutting with abundant groundwater. (3) When the parent rocks is possible to produce the dilatability argillaceous rock in the thick soil area, three indexes of the expansive soil should be distinguished to determines the soil nature for providing the reliable basis for the design and construction. (4) For high slope and deep cutting surveys, the exploration points should be rationally arranged according to concrete topographical conditions and the control sections should be properly arranged. In addition, the transverse width of the survey should be increased. ( 5 ) The result can be widely applied in the survey and construction of high slope and deep road bed of railway and highway.
|
Received: 08 December 2012
|
|
|
|
|
[1] TB 10027 — 2001,铁路工程不良地质勘察规程[S].
TB 10027—2001,Code for Unfavorable Geological Condition Investigation of Railway Engineering[ S].
[2] TB 10035—2006,铁路特殊路基设计规范[S].
TB 10035—2006, Design on Special Subgrade of Railway [S].
[3] TB 10012 — 2007,铁路工程地质勘察规范[S].
TB 10012—2007,Code for Geology Investigation of Railway Engineering[S].
[4] 戴志仁.软土地区盾构隧道同步注浆机理与工程应用研 究[D].上海:同济大学,2010
Dai Zhiren. Study on the Mechanism and Engineering Application of Simultaneous Backfill Grouting in Shield Tunneling in Soft Soils [ D ]. Shanghai: Tongji University, 2010.
[5] 张凤祥,朱合华,付德明.盾构隧道[M].北京:人民交通 出版社,2004.
Zhang Fengxiang, Zhu Hehua,Fu Deming. Shield Tunnel [M]. Beijing: China Communications Press, 2004.
[6] 王梦恕,等.中国隧道及地下工程修建技术[M].北京: 人民交通出版社,2010.
Wang Mengshu, etc. Tunnelling and Underground Engineering Technology in China [ M ]. Beijing : China Communications Press, 2010.
[7] 施仲衡,等.地下铁道设计与施工[M].西安:陕西科学 技术出版社,2006.
Shi Zhongheng,etc. Design and Construction of Underground Railway [ M ] ? Xi,an: Shaanxi Science and Technology Press, 2006.
[8] DGJ 08—11 一2010,地基基础设计规范[S].
DGJ 08—11~2010,Foundation Design Code[S]
[9] 陈勇.云岭隧道仰拱填充隆起变形的原因分析及处理对 策[J].中国西部科技,2012(2) :4 -8.
Chen Yong. Reason and Countermeasures for the Uplifting Deformation of Yunling Tunnel [ J ] ? Science and Technology of West China, 2012(2) :4 -8.
[10] 戴志仁.盾构隧道盾尾管片上浮机理与控制[J].中国 铁道科学,2013(1 ):59-66.
Dai Zhiren. Study on the Mechanism and Control Principle of Upward Movements of Segments at the Rear of Shield Tail [ J], China Railway Science,2013 (1): 59-66.
|
|
|
|