The Third Railway Survey and Design Institute Group Corporation.Construction Design Document of Shenyangbeizhan Station for Shenyang Subway Line 2 Project[Z].Tianjin: The Third Railway Survey and Design Institute Group Corporation ,2009.
[4] 铁道第三勘察设计院集团有限公司. 上海市轨道交通 11号线北段工程祁连山路站施工图设计文件[Z]. 天津: 铁道第三勘察设计院集团有限公司,2009.
The Third Railway Survey and Design Institute Group Corporation.Construction Design Document of Qishanlu Station for Shanghai Subway Line 11 North Project[Z].Tianjin: The Third Railway Survey and DesignInstitute Group Corporation,2009.
[5]铁道第三勘察设计院集团有限公司. 天津市地下铁道 1号线工程下瓦房站施工图设计文件[Z].天津: 铁道第三勘察设计院集团有限公司,2002.
The Third Railway Survey and Design Institute Group Corporation.Construction Design Document of Xiawafang Station for Tianjin Subway Line 1[Z].Tianjin: The Third Railway Survey and Design Institute Group Corporation,2002.
[6] 施仲衡.地下铁道设计与施工[M]. 西安: 陕西科学技术出版社,2006.
Shi Zhongheng. Design and Construction of Underground Railway[M].Xi’an: Shanxi Science and Technology Press,2006.
[7] 李德胜.地铁车站装修细节设计探讨 [J].铁路工程造价管理,2010( 5) :42 -45.
Li Desheng.Structure Design of Subway Station in the Case of Reserve Service Development[J].Railway Engineering Cost Management,2010( 5) : 42 - 45.
[8] 陈新艳. 屏蔽门系统与土建接口的若干问题[J].铁道工程学报,2010( 2) :77 -80.
Chen Xinyan. Problems Regarding Connection between Platform Screen Door System and Civil Engineering[J].Journal of Railway Engineering Society,2010( 2) :77 - 80.
[9] 沈月荣,鲍德颖.虹桥综合交通枢纽轨道交通五线工程换乘方案浅析[J].铁道工程学报,2009( 4) :86 -90.
Shen Yuerong Bao Deying. Analyses of the Transfer Plans for Five Rail Transit Lines Accessing to Hongqiao Integral Traffic Hub [J ].Journal of Railway Engineering Society,2009( 4) : 86 - 90.
[10]刘卡丁.地下车站采用平坡的工程实践[ J ].都市快轨交通,2008( 4) :59 -60.
Liu Kading.Engineering Practice of Level Grade Adopted In Metro Underground Stations[J]. Urban Rapid Rail Transit,2008( 4) : 59 - 60.