Study on Construction of Subsurface Excavated Metro Tunnel Under -passing Existing Railway

LIN Yun - hong,LI Yi - wei,WANG Fei

Journal of Railway Engineering Society ›› 2012, Vol. 29 ›› Issue (11) : 82-86.

PDF(1008 KB)
PDF(1008 KB)
Journal of Railway Engineering Society ›› 2012, Vol. 29 ›› Issue (11) : 82-86.

Study on Construction of Subsurface Excavated Metro Tunnel Under -passing Existing Railway

  • {{article.zuoZhe_EN}}
Author information +
History +

HeighLight

{{article.keyPoints_en}}

Abstract

{{article.zhaiyao_en}}

Key words

QR code of this article

Cite this article

Download Citations
{{article.zuoZheEn_L}}. {{article.title_en}}[J]. {{journal.qiKanMingCheng_EN}}, 2012, 29(11): 82-86

References

References

{{article.reference}}

Funding

RIGHTS & PERMISSIONS

{{article.copyrightStatement_en}}
{{article.copyrightLicense_en}}
PDF(1008 KB)

Accesses

Citation

Detail

Sections
Recommended

/