State Bureau of coal industry.Rules for Coal Pillars Reserving and Mining Coal under Buildings,Water, Railroad,Main Roadway and Shaft[M].Beijing: Coal Industry Press,2000.
[2]铁道第一勘察设计院.铁路工程地质手册[K]. 北京: 中国铁道出版社,1999.
The First Railway Survey and Design Institute. Handbook of Railway Engineering Geology[K]. Beijing: China Railway Publishing House,1999.
[3]TB 10001—2005,铁路路基设计规范[S].
TB 10001—2005,Code for Design of Railway Subgrade [S].
[4]TB 10621—2009,高速铁路设计规范(试行) [S].
TB 10621—2009,Code for Design of High Speed Railway[S].
[5]陈则连.煤矿采空区地表岩移对高速铁路的影响研究[J].铁道工程学报,2009( 4) :5-8.
Chen Zelian.Research on Influence of the Displacement of Surface Rock in Coal Mine Goaf on High - speed Railway[J].Journal of Railway Engineering Society, 2009(4) : 5-8.