The Third Railway Survey and Design Institute Group Corporation. Feasibility Research Reoort on Luohu - OCT Section of Phase 1 Project of Shenzhen No.1 Metro [R].Tianjin: The Third Railway Survey and Design Institute Group Corporation,1998.
[4]张佩竹.地铁线路设计经验涉及问题的探讨[J]. 铁道工程学报,2001(4) :44-46.
Zhang Peizhu. Exoloration on Problems Concerned with Expriences for Design of Subways [J]. Journal of Railway Engineering Society,2001( 4) : 44-46.
[5]施仲衡,等. 地下铁道设计与施工 [M]. 西安: 陕西科学技术出版社,1997.
Shi Zhongheng,etc.Design and Construction of Subway [M].Xi’an: Shanxi Science and Technology Press,1997.
[6]沈景炎.城市轨道交通多种制式的特征与评价大纲[J].城市轨道交通研究,2003(5) : 1-6.
Shen Jingyan.Feature and Evaluation Outline of Multi - format of Urban Rail Traffic [J].Urban Mass Transit, 2003(5) : 1-6.
[7]李德才,等.深圳地铁重叠隧道设计与施工技术要点[J].现代隧道技术,2006( 4) : 21-26.
Li Decai, etc. Key Techniques of Design and Construction for the Overlapped Tunnel in Shenzhen Metro [J].Modern Tunnelling Technology,2006 ( 4) : 21-26.
[8]王建山.罗湖 ~国贸区间重叠盾构隧道施工[J]. 施工技术,2008( 9) :47-50.
Wang Jianshan.Constructicn of Overlap Shield Tunnel at Laohu ~ Guomao Section [J ].Construction Technology,2008( 9) : 47-50.
[9]叶雅图,王世军,王琪.小半径上下重叠地铁盾构隧道设计与施工[J].地下空间与工程学报,2008(8) :696-701.
Ye Yatu, Wang Shijun,Wang Qi,Design and Construction cf an Overlapped Small Radius Metro Shield Tunnel [J].Chinese Joumal of Underground Space and Engineering,2008( 8) : 696-701.
[10] 林刚.地铁重叠隧道施工顺序研究[J]. 现代隧道技术, 2006( 6) : 23-28.
Lin Gang.Study on the Construction Sequence of Overlapped Metro Tunnels [J].Modern Tunnelling Technology,2008( 9) : 23-28.