|
|
Geotechnical Engineering Investigation for Deep Foundation Pit of Line 3 of Kunming Rail Transit and Its Evaluation |
LIU Wei,HE Jia - liang,YANG Wen - hui,DAI Wei |
Kunming Survey,Design and Research Institute Co. Ltd,CREEC,Kunming,Yunnan 650200,China |
|
|
Abstract Research purposes:The line 3 of Kunming rail transit crosses the downtown of Kunming from east to west.The engineering geological condition,hydrogeologic condition and surrounding environment are complex. By using the comprehensive survey technologies of the engineering geological mapping,drilling,geophysical exploration,testing,in - situ tests,the engineering geological condition and the hydrogeologic condition of the deep foundation pit for the stations of the Line 3 of Kunming rail transit were investigated. The analysis and evaluation were made for the stability of the site,the structure style of the exterior - protected construction for the foundation pit,the drainage scheme,the anti -floating and anti - raising of pit base,the treatment of the base and the construction of foundation pit.
Research conclusions: (1) The Line 3 of the urban rail transit in Kunming crosses the Kunming downtown featured with the complicated and unfavorable engineering geological condition and hydrogeological condition,such as the multiple rock - soil layers,rich underground water,sandy soil liquefaction,karst,shallow natural gas,filling soil,soft soil,the special rock and soil and poor regional stability.(2) Based on the comprehensive analysis of the geological condition and surrounding environment of deep foundation pits,the open cut method was used for the foundation pit and the top-down method was used for the section where was limited locally by the transportation condition.(3) The diaphragm wall was available for the interior support and sealing up for the deep foundation pit in the basin with the support of the concrete and steel pipe. The drainage ditch and the collecting well were installed in the foundation pit along with the artificial pumping and draining. The mixing pile and filling were used for the pit base to meet the requirement of anti-float and anti-raising.(4) The the slope excavation could be conducted with the support of the soil nail wall and filling to the pit base for the foundation pit in the essentially level area because of its good engineering geological condition without development of underground water.
|
Received: 22 April 2012
|
|
|
|
|
[1]蒋忠信,袁宝印,黄俊,等. 滇池泥炭土[M]. 成都: 西南交通大学出版社,1994.
Jiang Zhongxin,Yuan Baoyin,Huang Jun,etc. Peal Soil of Dianchi [M]. Chengdu: Southwest Jioatong University House,1994.
[2]高大钊.深基坑工程[M].北京: 机械工业出版社, 2002.
Gao Dazhao.Engineering of Deep Foundation Pit[M]. Beijing: China Machine Press,2002.
[3]刘传平,贾坚,郑俊星.上海某复杂边界条件深大基坑工程的设计与实践[J].岩土工程学报,2010(S1) : 379.
Liu Chuanping,Jia Jian,Zheng Junxing.Design and Practice of a Deep Foundation Pit with Complex Boundary Conditions in Shanghai[J].Chinese Journal of Geotechnical Engineering,2010(S1) : 379.
[4]许再良,孟庆文,张咏芙,等. 天津站交通枢纽轨道换乘中心工程岩土工程勘察[J].铁道工程学报,2008 (6) : 1-5.
Xu Zailiang,Meng Qingwen,Zhang Yongfu,etc. The Geotechnical Engineering Investigation of Tianjin Traffic Transfer Junction Center [J].Journal of Railway Engineering Society,2008(6) : 1-5.
[5]徐安军,王建华,丁勇春.上海地铁明珠线二期西藏南路站基坑施工技术[J]. 岩土工程学报,2006(S) :1707- 1713.
Xu Anjun,Wang Jianhua,Ding Yongchun. Construction Technology for Deep Excavation of South Tibet Station of Shanghai Metro[J].Chinese Journal of Geotechnical Engineering,2006(S) : 1707-1713.
[6]李耀良,王建华,丁勇春.上海地铁明珠线二期西藏南路站地下连续墙施工技术[J].岩土工程学报,2006 (S) :1664-1672.
Xu Anjun.Wang Jianhua.Ding Yongchun.Diaphragm Construction Technology for Deep Excavation of South Tibet Station of Shanghai Metro[J].Chinese Journal of Geotechnical Engineering,2006(S) : 1664-1672.
[7]刘建航,候学渊.基坑工程手册[M].北京: 中国建筑工业出版社,1997.
Liu Jianhang,Hou Xueyuan.Handbook of Foundation Pit Engineering[M].Beijing: China Architecture & Building Press,1997.
[8]杨有海,王建军,武进广,等.杭州地铁秋涛路车站深基坑信息化施工监测分析[J].岩土工程学报,2008(10) : 1550-1554.
Yang Youhai,Wang Jianjun,Wu Jinguang,etc. Informationized Construction Monitoring Analysis of Deep Foundation Pit for Qiutao Road Station of Hangzhou Metro[J].Chinese Journal of Geotechnical Engineering,2008( 10) : 1550-1554.
|
|
|
|