|
|
Study on Coal Railway Transportation Path and Capacity Expansion Scheme from Xinjiang to Ningxia |
WANG Boying |
China Railway First Survey and Design Institute Group Co. Ltd, Xi'an, Shaanxi 710043, China |
|
|
Abstract Research purposes: In recent years, the demand for coal transport from Xinjiang to Ningxia is increasingly strong, but the existing railway transport channels have the problems of insufficient transport capacity and low transport quality. In this context, starting from the existing railway network pattern, this paper points out that the available railway transport channels, proposes capacity expansion measures for various transport routes by sorting out existing problems and combining relevant railway network planning. On the basis of quantitative analysis, the implementation effect of the two transportation channels is compared by comprehensive application of Delphi method and value engineering principle. The advantages and disadvantages of each transportation channel and its value coefficient are analyzed, and the selection of coal transportation channel from Xinjiang to Ningxia is recommended. Research conclusions: (1) Under the overall pattern of the existing railway network, there are two transportation channels for coal transportation from Xinjiang to Ningxia. (2) With the improvement of the regional network and the necessary expansion and transformation measures, the north and south transportation channels can meet the transportation requirements. (3) Although the transportation scheme of the south channel is superior in terms of transport quality and project investment, the transportation scheme of the north channel has obvious capacity expansion effect, high channel capacity guarantee degree and higher value coefficient. The north channel is finally determined as the recommended scheme. (4) The research results can provide reference for the selection of coal railway transportation path from Xinjiang to Ningxia and related railway expansion measures.
|
Received: 21 May 2024
|
|
|
|
|
[1] |
新疆至宁夏煤炭运输铁路通道方案研究[R].新疆至宁夏煤炭运输铁路通道方案研究[R].西安:中铁第一勘察设计院集团有限公司,2022.Study on the Scheme of Coal Transportation Railway Channel from Xinjiang to Ningxia[R].Xi'an: China Railway First Survey and Design Institute Group Co.Study on the Scheme of Coal Transportation Railway Channel from Xinjiang to Ningxia[R].Xi'an: China Railway First Survey and Design Institute Group Co. Ltd,2022.
|
[2] |
宁和平. 陕北煤炭铁路运输持续增量的区域路网能力优化研究[J].铁道运输与经济,2023(4):36-43.Ning Heping.Regional Railway Network Capacity Optimization for Continuous Increment of Coal Transportation by Northern Shaanxi Railways[J]. Railway Transport and Economy,2023(4):36-43.
|
[3] |
程大龙. 新疆煤炭外运铁路运输增量对策探讨[J].铁道货运,2023(4):9-14.Cheng Dalong.Discussion on Incremental Countermeasures of Coal Transportation in Xinjiang[J].Railway Freight Transport,2023(4):9-14.
|
[4] |
兰新铁路通道普速上线专题研究[R].兰新铁路通道普速上线专题研究[R].西安:中铁第一勘察设计院集团有限公司,2022.Special Research on Lanzhou-Xinjiang Railway Channel General Speed Online[R].Xi'an: China Railway First Survey and Design Institute Group Co.Special Research on Lanzhou-Xinjiang Railway Channel General Speed Online[R].Xi'an: China Railway First Survey and Design Institute Group Co. Ltd,2022.
|
[5] |
刘畅,关秀婷,张金伟,等.考虑时间价值成本的中欧笔记本电脑多式联运路径优化研究[J].铁道科学与工程学报,2019(9):2352-2359.Liu Chang, Guan Xiuting, Zhang Jinwei, etc.Study on the Route Optimization of China-Europe Laptop Multimodal Transport Considering Time Value Cost[J].Journal of Railway Science and Engineering,2019(9):2352-2359.
|
[6] |
王太. 铁路运输通道能力优化探讨[J].铁道运输与经济,2019(7):33-38.Wang Tai.A Tentative Study on Optimizing Countermeasures for the Capacity of Railway Corridors[J]. Railway Transport and Economy,2019(7):33-38.
|
[7] |
魏昌辛,吕欣. 西部陆海新通道铁路主通道实施方案研究[J]. 铁道工程学报,2022(2):1-6. Wei Changxin,Lv Xin. Research on the Implementation Plan of the Main Railway Corridor of the New Western Land-sea Corridor[J]. Journal of Railway Engineering Society,2022(2):1-6.
|
[8] |
吕学伟,杨斌,黄振东. 混合时间窗约束下多式联运最优路径选择研究[J]. 铁道运输与经济,2018(8):6-11. Lv Xuewei,Yang Bin,Huang Zhendong. Optimal Path Selection for Multimodal Transport under Mixed Time Window Constraints[J].Railway Transport and Economy,2018(8):6-11.
|
|
|
|