Design and Operational Adaptability Analysis of Nanchang West Passenger Station |
HOU Xiangju1, WANG Hua2, HUANG Jian1, HE Anjing1 |
1. China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China; 2. China Railway Nanchang Group Co. Ltd, Nanchang, Jiangxi 336008, China |
|
|
Abstract Research purposes: To meet the transportation service functions, optimize transportation routes, ensure station functions aligning with transportation convenience, the short-term and long-term planning of railway hubs, and save project investment, are key considerations in the design of large passenger stations in railway hubs. This paper proposed design principles and concepts for large stations, studied the design concept and station layout characteristics of the newly built large passenger station in the Nanchang Railway Hub—Nanchang West Passenger Station, analyzed the operational adaptability, and examined the conformity between the planned design and actual operation. Research conclusions: (1) Principles and concepts for the design of newly built large passenger stations were proposed, indicating that combining the characteristics of the design scheme with operational process arrangements could enhance the operational capacity of the station. (2) The special design of combining the overpasses in the throat area at one side of the station with the in-station transfer lines could achieve the transportation service functions of a large passenger station in the hub. (3) Strengthening communication and interaction with frontline operational personnel could enhance detailed design and improve the operational capacity of sections and facilities. (4) The research results can serve as references for the planning, design, and operation of large stations and sections.
|
Received: 21 May 2024
|
|
|
|
|
[1] |
邓军桥. 滇藏铁路总体设计目标及对策研究[J]. 铁道工程学报, 2023(6): 18-25.Deng Junqiao.Research on the Overall Design Goals and Countermeasures of the Yunnan-Tibet Railway[J]. Journal of Railway Engineering Society, 2023(6): 18-25.
|
[2] |
TB 10621—2014,高速铁路设计规范[S].TB 10621—2014,Code for Design of High Speed Railway[S].
|
[3] |
TB 10098—2017,铁路线路设计规范[S].TB 10098—2017, Code for Design of Railway Line[S].
|
[4] |
TB 10623—2014,城际铁路设计规范[S].TB 10623—2014, Code for Design of Intercity Railway[S].
|
[5] |
TB 10099—2017,铁路车站及枢纽设计规范[S].TB 10099—2017, Code for Design of Railway Station and Terminal[S].
|
[6] |
黄令海. 沪渝蓉高速铁路引入上海枢纽方案研究[J].高速铁路技术,2023(3):112-116.Huang Linghai.A Study on the Scheme of Linking Shanghai-Chongqing-Chengdu High-speed Railway with Shanghai Railway Hub[J].High Speed Railway Technology,2023(3):112-116.
|
|
|
|