Design and Research on Asymmetrical Super - large - span Single Track Continuous Rigid Frame |
XIN Yue - hui,YAN Yong,HU Bu - mao |
China Railway Eryuan Engineering Group Co. Ltd,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes:For construction of the Chaoyang River Bridge on the right track in the section between Guangyuan and Chongqing of the Lanzhou - Chongqing Railway,the analysis and research were made and done on the structural form ,load bearing situation of structure and construction method for providing the reference to design and construction of the similar bridge.
Research conclusions:The horizontal natural vibration period cycle was controlled because of the large span and narrow width of the beam's box. Based on the analysis of the parameters,the analysis of the influences of the pier width,the box width of the beam,the slope of the pier and the horizontal layout of pile foundation on the natural vibration period of the structure were analyzed comprehensively. The double wall piers with the longitudinal straight slope and variation of lateral slope were designed to make sure the structure had enough lateral rigidity while the longitudinal stiffness of the could be reduced effectively,the requirement of load bearing for the large span continuous structure could be met,the transverse joint in double - wall piers could be cancelled and the structure could be of more lightweight with good looking appearance. In beam design,the layout of longitudinal prestressed steel strand was optimized ,the upwardly curved steel strand in the web was cancelled,the principal tensile stress was overcome by the longitudinal steel strand and the vertical prestressed steel to avoid the crack of the web of large span structure.
|
Received: 13 March 2012
|
|
|
|
|
[1] 范立础.预应力混凝土连续梁桥[M].北京: 人民交通出版社,1997.
Fan Lichu.Prestressed Concrete Continuous Beam Bridge[M].Beijing: China Communications Press, 1997.
[2] 李国豪.桥梁结构稳定与振动[M].北京: 中国铁道出版社,1992.
Li Guohao.Stability and Vibration of Bridge Structures [M].Beijing: China Railway Publishing House,1992.
[3] TB 10002.3—99,铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].
TB 10002.3—99,Code for Design on Reinforced and Prestressed Concrete Structure of Railway Bridge and Culvert[S].
[4] 程翔云.梁桥理论与计算[M].北京: 人民交通出版社, 1990.
Cheng Xiangyun.Theory and Computation of Beam Bridge [M].Beijing: China Communications Press, 1990.
[5] 冯鹏程.连续刚构桥设计关键技术问题探讨[J]. 桥梁建设,2009(4) :46-49.
Feng Pengcheng. Study of Key Technical lssues on Design of Continuous Rigid - Frame Bridge[J]. Bridge Construction,2009(4) : 46-49.
[6] 杜国华. 桥梁结构分析[M].上海: 同济大学出版社, 1994.
Du Guohua. Analysis of Bridge Structure [M]. Shanghai: Tongji University Press,1994.
[7] 马保林. 高墩大跨连续刚构桥[M].北京: 人民交通出版社,2001.
Ma Baolin.High Pier and Long Span Continuous Rigid Frame Bridge[M].Beijing: China Communications Press,2001.
[8] 刘志军.长联高墩大跨不对称连续刚构桥设计与施工研究[J]. 铁道工程学报,2010(12) :31-36.
Liu Zhijun. PC Continuous Rigid Frame Bridge with High Pier and Large Span Asymmetric Design and Construction Research [J ].Journal of Railway Engineering Society,2010(12) : 31-36.
|
|
|
|