Research on Abutment Arrangement of Simply Supported T - beam of Yellow River Bridge of Zhungeer - Shuozhou Railway |
ZHOU Yue - wu,LI Feng - qin,ZHANG Ya - li |
The Third Railway Survey and Design Institute Group Corporation,Tianjin 300142,China |
|
|
Abstract Research purposes:The Yellow River Bridge is a very important engineering of Shuozhou - Zhungeer Railway.The pier longitudinal displacement of large - span deck - type arch bridge is caused by the pier and arch - rib deformation.The abutment arrangement of simply supported T - beam has big effect on the loading bearing of the arch rib,therefore,it is necessary to arrange the abutment rationally to reduce the longitudinal displacement of the high pier and cut its adverse effects on the arch rib.
Research conclusions:(1) As the maximum relative longitudinal displacement of adjacent pier on the arch bridge occurs between the junction pier and G1 or G12 pier.(2) The movable abutment with large longitudinally displacement and expansion device should be used for the first beam at arch foot and the measures for prevention of span collapse should be taken.(3) As the pier top displacement of large - span arch bridge has big effect on the CWR track,the fastening with small resistance should be used for the CWR track on bridge to adapt the pier deformation.
|
Received: 15 March 2012
|
|
|
|
|
[1] TB 10002.1—2005,铁路桥涵设计基本规范[S].
TB 10002.1—2005,Fundamental Code for Design on Railway Bridge and Culvert[S].
[2] TB 10002.3—2005,铁路桥涵钢筋混凝土和预应力混凝土结构设计规范[S].
TB 10002.3—2005,Code for Design on Reinforced and Prestressed Concrete Structure of Railway Bridge and Culvert[S].
[3] GB 50111—2006,铁路工程抗震设计规范[S].
GB 50111—2006,Code for Seismic Design of Railway Engineering[S].
[4] 陈宝春.钢管混凝土拱桥[M].北京: 人民交通出版社, 2007.
Chen Baochun.Concrete Filled Steel Tubular Arch Bridges[M].Beijing: China Communications Press, 2007.
[5] 杨克鉴,李凤芹,张亚丽.大跨度上承式钢管混凝土拱桥设计研究[J]. 铁道工程学报,2008(12) :67-71.
Yang Kejian,Li Fengqin,Zhang Yali. Research on the Design of Large Span Deck Steel Tube Concrete Arch Bridge[J].Journal of Railway Engineering Society, 2008(12) : 67-71.
[6] 马庭林,徐勇,等.水柏铁路北盘江大桥设计[J]. 桥梁建设,2001(5) :25-32.
Ma Tinglin, Xu Yong,etc.Design of Beipanjiang Bridge on Shuicheng - Baiguo Line [J].Bridge Construction,2001(5) : 25-32.
[7] 李生勇,李凤芹,等. 钢管混凝土拱桥徐变影响分析[J].铁道学报,2011(3) :100-107.
Li Shengyong, Li Fengqin,etc.Analysis on Creep Effect of Concrete - filled Steel Tubular Arch Bridges [J].Journal of the China Railway Society,2011(3) : 100-107.
[8] 徐勇,马庭林,陈克坚. 水柏铁路北盘江大桥钢管混凝土拱设计[J]. 中国铁道科学,2003(5) :34-39.
Xu Yong,Ma Ting - lin,Chen Ke - jian.Steel Tube with Concrete Filling Arch Design of Beipanjiang Large Bridge[J].China Railway Science,2003(5) : 34-39.
[9] 赵跃宇,刘伟长,冯锐,等. 大跨度钢管混凝土拱桥拱肋吊装过程的仿真计算[J]. 世界桥梁,2006(2) :38-40.
Zhao Yueyu,Liu Weichang,Feng Rui,etc. Simulation Calculation for Lifting and Erection Process of Arch Ribs of Long Span Concrete - filled Steel Tube Arch Bridges[J]. World Bridges,2006(2) : 38-40.
[10] 张建民,郑皆连,秦荣. 大跨度钢管混凝土拱桥吊装过程的优化计算方法[J]. 桥梁建设,2002(1) :52-54.
Zhang Jianmin, Zheng Jielian, Qin Rong. A Calculation Method for Optimizing the Installation Process of CFST Arch Bridge[J]. Bridge Construction, 2002(1) : 52-54.
|
|
|
|