Research on Reserve System and Inventory Strategy of Railway Engineering Materials in Complex Areas |
SU Xiaokun |
Southwest Jiaotong University,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes: Railway construction projects in complex and difficult areas are characterized by a lackof resources, long transport distances for materials, fragile logistics channels and limited reserve,facilities,etc.It isimportant to meet the dynamic supply needs of super-large linear engineering materials in complex and difficult areas ina long cycle and enhance the level of guarantee for the supply of railway engineering materials. In this paper, the centralized reserve system of railway engineering materials is constructed, the inventory strategy of central warehouse within the bid section is proposed, and the optimal ordering point and quantity of engineering materials are obtained to minimize the long-term average inventory cost. Research conclusions: (1)The three-level reserve system of railway engineering materials is constructed, and thematerial reserve base is established to ensure the timely supply of materials by the construction unit when the risk ofmaterial supply interruption occurs.(2)Considering the random lead time, random demand,price fluctuation ofengineering materials and other factors, the inventory strategy (R,Q) is adopted to optimize the central warehouse inventory of bid section.(3)Combined with numerical examples, the optimal order point and order quantity of central warehouse are considered under the condition of allowable and non-allowable stock shortage.(4)The research results can provide theoretical reference for further research of centralized reserve management.
|
Received: 15 February 2023
|
|
|
|
|
[1] |
王李刚.铁路建设项目工程物资管理有关问题的探讨[J].铁道工程学报,2011(6):102-106.Wang Ligang. Discussion on Problems Related to Engineering Materials for Railway Construction[J]. Journal of Railway Engineering Society, 2011(6):102-106.
|
[2] |
张锦,徐君翔,郭静妮,等.考虑川藏铁路控制性工程的甲供物资基地选址决策方法[J].铁道学报,2019(11):26-35.Zhang Jin,Xu Junxiang,Guo Jingni,etc. A Decision-making Method for Site Selection of Base of Client-supplied Goods and Materials Considering Controlling Project of Sichuan-Tibet Railway[J]. Journal of the China Railway Society, 2019(11):26-35.
|
[3] |
韩笑,殷东晓.奋进新铁物,着墨工笔画:中国铁物为“一带一路”国际合作重大工程项目中老铁路提供物资供应集成服务[J].铁路采购与物流,2019(8):23-26.Han Xiao,Yin Dongxiao. CRM Attending to the Details of "Fine Brushwork"[J]. Railway Purchasing and Logistics,2019(8):23-26.
|
[4] |
王睿,雷红伟,彭英武,等.战时任务条件下舰艇装备多级备件优化[J].上海交通大学学报,2013(3): 398-403.Wang Rui,Lei Hongwei,Peng Yingwu,etc.Optimization of Warship Spare Parts in the Scenario of Wartime Mission [J]. Journal of Shanghai Jiaotong University,2013(3): 398-403.
|
[5] |
魏宇琪,杨敏,梁樑.基于生命周期的模块化应急物资联动预储研究[J].系统工程理论与实践,2021(4):979-994. Wei Yuqi, Yang Min, Liang Liang.Lateral-transshipment and Pre-positioning Strategy Research of Relief Modularization Based on Material's Limited Shelf Life [J].Systems Engineering—Theory & Practice, 2021(4):979-994.
|
[6] |
陈杰,陈志祥. 具有多元马氏需求的多产品多阶段库存优化模型[J]. 中国管理科学,2015(5):151-160. Chen Jie, Chen Zhixiang.Optimal Policy for Multi-product Multi-stage Inventory Model with Multivariate Markov Demand[J]. Chinese Journal of Management Science, 2015(5):151-160.
|
[7] |
王倩楠,葛玉辉,孔飞.基于批量销售的分布式库存管理研究[J].管理工程学报,2022(4): 177-185.Wang Qiannan, Ge Yuhui, Kong Fei.Optimal and Heuristic Policies for Distribution Inventory Systems with Batch Ordering[J] .Journal of Industrial Engineering and Engineering Management, 2022(4): 177-185.
|
|
|
|