Dong Wende. Construction Techniques of Long Span Continuous Box girder Bridge with Variable Cross Section Cast - in - place by Bracket Method [J]. Modern Transportation Technology,2006(3):46 - 49.
[6] 洪宏兴. 移动贝雷支架逐孔分段现浇在桥梁施工中的应用[J]. 中国港湾建设,2000(2):46 -48.
Hong Hongxing. Use of Technique of Moving Bailey Trusses to Cast Concrete in - situ in Sections in Bridge Construction [J]. China Harbour Engineering,2000 (2):309 -312.
[7] 邱志峪. 客运专线现浇梁膺架施工方案探讨[J]. 铁道工程学报,2007(12):46 -48.
Qiu Zhiyu. Discussion on the Trestle Construction Program of Cast - in - place Girder for Passenger Dedicated Line[J]. Journal of Railway Engineering Society,2007(12):309 - 312.