Abstract Research purposes: According to the difficulties in construction of weak enriched water surrounding rock grade VI Jiangmen Tunnel,the suitable advance reinforcement mode and tunnel excavation method were chosen. in order to ensure construction safety and road operation safety.
Research conclusions: ( 1) The horizontal churning jet pile was used for the advance reinforcement,and the large pipe roof in advance and CRD method were used for excavation to safeguard the tunnel under - passing the road. ( 2) With the finite element calculation software,the numerical simulation was made for the whole process of the tunnel excavation,the analysis was made for change trends of the stress and displacement of the surrounding rocks during excavation to decide the key points of the construction control and monitoring ground deformation. ( 3) The steel frame needed to be enclosed in time for a loop to prevent appearance of large displacement and floor swell.
|
Received: 14 December 2011
|
|
|
|
|
[1] 张健儒. 山岭隧道高压富水断层破碎带注浆施工技术[J]. 铁道工程学报, 2010( 5) : 58 - 62.
Zhang Jianru. Grouting Technology for Construction of Water - rich Fault Fracture Zone Mountain Tunnel in High - pressure[J]. Journal of Railway Engineering Society,2010( 5) : 58 - 62.
[2] 郑保才,孟庆明,魏家君,等. 富水隧道治理高压股状裂隙水施工技术研究及应用[J]. 铁道工程学报,2011 ( 1) :66 - 69.
Zheng Baocai,Meng Qingming,Wei Jiajun,etc.Research and Application on Construction Technology for Governing High - pressure Strand Cranny Water in Enriched Water Tunnel [J]. Journal of Railway Engineering Society,2011( 1) : 66 - 69.
[3] 师晓权,张志强,李化云. 软弱围岩隧道超前预加固技术试验研究[J]. 岩石力学与工程学报,2011 ( 9) : 1803 -1809.
Shi Xiaoquan, Zhang Zhiqiang, Li Huayun.Experimental Study of Pre - reinforcement Technology for Weak Surrounding Rock of Tunnel [J]. Chinese Journal of Rock Mechanics and Engineering,2011( 9) :1803 - 1809.
[4] 赵勇,刘建友,田四明. 深埋隧道软弱围岩支护体系受力特征的试验研究[J]. 岩石力学与工程学报,2011 ( 8) :1663 - 1670.
Zhao Yong,Liu Jianyou,Tian Siming. Experimental Study of Mechanical Characteristics of Support System for Weak Surrounding Rock of Deep Tunnels [J].Chinese Journal of Rock Mechanics and Engineering,2011( 8) : 1663 - 1670.
[5] 张朋,李晓红,卢义玉. 小导管注浆技术在浅埋富水岩溶隧道中的应用[J]. 地下空间与工程学报,2008 ( 3 ) :517 - 522.
Zhang Peng,Li Xiaohong,Lu Yiyu. Application of Pipe Grouting Technology in Shallow Buried Aqueous Karst Tunnel [J]. Chinese Journal of Underground Space and Engineering,2008( 3) : 517 - 522.
[6] 李河玉. 小导管注浆技术及在隧道和地下工程中的应用[D]. 成都: 西南交通大学, 2002.
Li Heyu. Pipe Grouting Technology and the Application in the Tunnel and Underground Engineering [D] .Chengdu: Southwest Jiaotong University, 2002.
[7] 邵双修. 禾洛山隧道富水地段施工技术[J]. 铁道工程学报, 2010( 5) : 54 - 57.
He Shuangxiu. Technique for Construction of Heluoshan Tunnel in Water - rich Stratum[J]. Journal of Railway Engineering Society,2010( 5) : 54 - 57.
[8] 刘泽,何宝成. 浅埋暗挖地铁超长管棚施工[J]. 铁道标准设计, 2005( 2) : 67 - 69.
Liu Ze,He Baocheng. Super Long Pipe Roof for Shallow Buried Subsurface Excavated Subway Tunnel[J]. Railway Standard Design,2005( 2) : 67 - 69.
[9] 张彦斌. 水平旋喷注浆预支护技术作用机理与效果研究[D]. 北京: 北京交通大学, 2006.
Zhang Yanbin. Horizontal Whirling Jet Grouting Principle & Impact Research [D]. Beijing: Beijing Jiaotong University, 2006.
|
|
|
|