Static Response Analysis of CRTS III Ballastless Track Structure |
SUN Lu,DUAN Yu-fen,YANG Xin |
Southeast University,Nanjing,Jiangsu 210096,China |
|
|
Abstract Research purposes:The current ballastless track structure design method does not specifically mention in the concept of controlling indicators,disadvantageous position and critical loading position. This paper selects static characteristics indicators of slab ballastless track structure based on the CRTS III high-speed railway. Simultaneously, it calculates the stress of BTS,getting BTS’s critical loading position and the most disadvantageous position.
Research conclusions:The results show:(1)The critical loading position of CRTS III ballstless track structure is slab end position:(2)The maximum transverse tensile stress is larger than the maximum longitudinal tensile stress in the bottom of track slab,the disadvantageous position is slab corner:(3)The maximum compressive stress of packed bed happens under the load:(4)The maximum longitudinal tensile stress is larger than the maximum transverse tensile stress on the support layer of ballstless track structure on the subgrade,the disadvantageous position is the load position, the longitudinal tensile stress does not happen on the base plate of ballstless track structure on the bridge,the transverse tensile stress happens on the longitudinal edge of support layer:(5)The research can provide reference for China getting the independent intellectual property rights and the international advanced design of ballastless track and method theory.
|
Received: 03 December 2012
|
|
|
|
|
[1]王炳龙.高速铁路路基工程[M].北京:中国铁道出版社,2007.
Wang Binglong. Construction of High-speed Railway Subgrade[U238].Beijing:China Railway Publishing House, 2007.
[2]J. Eisenmann. Ballastless Track as an Alternative to Ballasted Track[J].Rail International, 1995(11): 19-28.
[3]J. Eisenmann. Redundancy of Rheda-type Slab Track [J].Eisenbahningenieur,2002(10):13-18.
[4]J. Eisenmann. Cross-country Comparison of High- speed Railway Lines[J].Eisenbahningenieur,2006(7): 6-9.
[5]赵国堂.高速铁路无碴轨道结构[M].北京:中国铁道出版社,2006
Zhao Guotang. High-speed Railway Ballastless Track Structure[M].Beijing:China Railway Publishing House, 2006.
[6]何华武.无碴轨道技术[M].北京:中国铁道出版社, 2005.
He Huawu. Ballastless Track Technology [ M ].Beijing: China Railway Publishing House, 2005.
[7]刘学毅,赵坪锐,杨荣山,等.客运专线无碎轨道设计理论 与方法[M].成都:西南交通大学出版社,2010.
Liu Xueyi, Zhao Pingrui, Yang Rongshan, etc. The Design Theories and Methods of Passenger Dedicated Railway Line[M].Chengdu:Southwest Jiaotong University Publishing House, 2010.
[8]王其昌,韩启孟.板式轨道设计与施工[ M].成都:西南交 通大学出版社,2002.
Wang Qichang, Han Qimeng. Design and Construction of Slab Track[M].Chengdu:Southwest Jiaotong University Publishing House, 2002.
[9]安国栋.高速铁路无碎轨道技术标准与质量控制[M].北 京:中国铁道出版社,2009.
An Guodong. Technical Standards and Quality Control of High-speed Railway Ballastless Track[ M].Beijing: China Railway Publishing House, 2009.
[10]娄平,曾庆元.移动荷载作用下板式轨道的有限元分析 [J].交通运输工程学报,2004(1):29-33.
Lou Ping, Zeng Qingyuan. Finite Element Analysis of Slab Track Subjected to Moving Load[J].Journal of Traffic and Transportation Engineering, 2004(1):29-33.
[11]向俊等.客运专线板式无碴轨道动力设计参数[J].中 南大学学报(自然科学版), 2007(5):981-986.
Xiang Jun. etc. Dynamic Parameters of Slab Track of Passenger Transport Line[J].Journal of Central South University:Science and Technology, 2007(5):981- 986.
[12]陈希成.高速铁路板式轨道结构力学分析[D].成都:西 南交通大学,2008.
Chen Xicheng. Mechanical Analysis of Highspeed Railway Slab Track[D].Southwest Jiaotong University, 2008.
[13]梁波,罗红,孙常新.高速铁路振动荷载的模拟研究[J] 铁道学报,2006 ( 4) : 89-94.
Liang Bo,Luo Hong, Sun Changxin. Simulated Study on Vibration Load of High Speed Railway[J].Journal of the China Railway Society , 2006 ( 4) : 89-94.
[14]许佑顶.高速铁路无碎轨道扣件设计要点[J].铁道工程 学报,2010(4):40-43.
Xu Youding. Key Points for Design of Ballastless Track Fastening of High-speed Railway[J].Journal of Railway Engineering Society , 2010 ( 4) : 40-43.
|
|
|
|