|
|
Design of Extra-high Filling Urban Railway Open Cut Tunnel in Valley Mountain Area |
KUANG Liang,CHEN Chi-kun,TAN Yong-jie,LUO Lu-sen |
China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Sichuan 610031,China |
|
|
Abstract Research purposes:In the construction of the urban railway,more and more thick filling and heavy load railway open cut tunnels have been appearing in the control of factors of urban layout and construction,especially in the mountainous city,open cut tunnels may also be built above the high filling roadbed.The kind of railway open cut tunnel is more complex than common open cut tunnel,the more factors should be considered in design,around the open—cut tunnel for Fengdu land reclamation on the railway line from Chongqing to Lichuan for the engineering prototype,the critical design features including load combination,open—cut tunnel selection,lining stress analysis,internal and external lining critical process,foundation disposing formation,the whole stability,filling construction technology and SO on,are analyzed respectively.
Research conclusions:This paper proposes the double lining design method of outer lining bearing filling load and inner lining reinforcing structure and bearing later load.By means of finite element structure analysis,the key process is determined which inner lining must be exceed after the completion of outer liner and I—period filling,these design measures can ensure the stress safety and structure stability of open cut tunnel,concrete dam and foundation,and the whole and part stability of filling engineering.The method of shear pile on the bottom of open cut tunnel will prevent filling from pushing tunnel is proposed.Filling construction technology is key to ensuring the stability of open cut tunnel and dam,and the construction of concrete dam should control casting temperature and decline heat of hydration. Research achievements have important reference value and significance on the open excavation construction of railway, highway,subway tunnels,especially involving the open cut structure of thick filling,heavy load and deep foundation.
|
Received: 10 March 2013
|
|
|
|
|
[1]TB 1003-2005,铁路隧道设计规范[S].
TB 1003-2005,Code for Design On Tunnel of Railway [S].
[2]关宝树.隧道工程设计要点集[M].北京:人民交通出版社,2003.
Guan Baoshu.Design Features Volume of Tunnel Engineering[M].Beijing:China Communications Press,2003.
[3]郑宗溪.设于桥梁上方的新型棚洞研究[J].铁道工程学报,2007(2):54-57.
Zheng Zongxi.Study of the New Type Shed Tunnel on the Bridge[J].Journal of Railway Engineering Society, 2007(2):54-57.
[4]胖涛.合川车站超大跨双联拱明洞设计[J].隧道建设, 2007(6):47-50.
Pang Tao.Design of Double-arch Open-cut Extra- large Span Tunnel for Hechuan Station[J].Tunnel Construction,2007(6):47-50.
|
|
|
|