Abstract Research purposes:With the rapid development of China railway undertakings,a considerable number of tunnel face high rock temperature,high water temperature and other issues.In order to look for the railway tunnel design methods under high temperature environment,and form a complete system to deal with high—temperature rock tunnel design and construction techniques,this paper takes the new railway from Lhasa to Xigaze high temperature rock tunnel design and construction as a backing,surveys and studies the construction and cooling measures for high temperature and heat damage of tunnels,coal mines and deep mines at home and abroad,considering the special climate condition from Lhasa to Xigaze such as high altitude,low air pressures,poor oxygen etc.,chooses Jiwoxiga high temperature rock tunnel as the main study object,conducts a field test trials and effects analysis,accordingly results can provide a theoretical basis.
Research conclusions:For ease of use,heat damage is graded from survey,design and construction stages,and in the plateau region of more than 3 000 metres, heat damage level should improve one grade.Heat damage fortification should be based on non—artificial refrigeration cooling technology,such as ventilation cooling,cold water cooling,spray sprinkler cooling,isolated hot rock,ice cooling etc.,and in combination with other measures to c001.Conclusions made good use of effects in the construction of Lhasa to Xigaze high temperature rock tunnel,resulting in greater economic and social benefits,which can provide references for other similar projects.
|
Received: 28 August 2013
|
|
|
|
|
[1] 任智刚,刘功智,何川,等.井下高温作业场所热害评价分级指标研究[J].中国安全生产科学技术,2009(3):41 -46.
Ren Zhigang,Liu Gongzhi,He Chuan,etc.Study on the Indicators for Ranking of the Rmal Hazard in Heat Stress Work Place of Underground Mine[J].Journal of Safety Science and Technology,2009(3):41-46.
[2]邢娟娟.井下高温作业的矿工生理、生化测定研究[J].中国安全科学学报,2001(4):45-48.
Xing Juanjnan.Study on Physiological and Biological Changes for Miners Exposed to Heat in Underground Pit[J].China Safety Science Journal,2001(4):45-48.
[3]Webber R.C.Franz R.M.etc.A Review of Local and International Heat Stressindices,Standards and Limits With Reference to Ultra-Deep Mining[J].The Journal of the South African institute of mining and metallurgy, 2003(7):319-324.
[4]欧晓英,杨胜强,于宝海,等.矿井热环境评价及其应用 [J].中国矿业大学学报,2005(3):323-326.
Ou Xiaoying,Yang Shengqiang,Yu Baohai,etc. Evaluation of Thermal Environment in Mine and Its Applieation[J].Journal of China University of Mining &Technology,2005(3):323-326.
[5]吕石磊,朱能,孙丽婧.极端热环境热应力研究指标及评价[J].制冷学报,2006(4):45-49.
Lv Shilei,Zhu Neng,Sun Lijing.Heat Stress Index and Evaluation for Extreme Heat Environment J I.Journal of Refrigeration,2006(4):45-49.
[6]王欣平.作业场所职业危害程度分级现状分析[J].中国安全生产科学技术,2006(6):125-128.
Wang Xinping.Analysis on the Present of Workplace Oceupational Hazards Classification J 1.Journal of Safety Science and Technology,2006(6):125-128.
[7]张忠彬,孙庆云.我国职业危害分类与分级监管法规标准与研究现状[J].中国安全生产科学技术,2007(6): 104-108.
Zhang Zhongbin,Sun Qingyun.Status of Classification and Grading Management of Occupational Hazards [J].Journal of Safety Science and Technology,2007 (6):104-108.
[8]曲玮,宋爱华,张海东,等.矿井热害治理防护措施的研究进展[J].环境与职业医学,2009(6):589-592.
Qu Wei,Song Aihua,Zhang Haidong,etc.Technical Progress of Protective Measures Against the Heat Hazard in Mine[J].J Envimn Occup Med,2009(6): 589-592.
[9]赵平,李东,陈松.玉蒙铁路旧寨隧道高温地热水分析研究[J].铁道工程学报,2008(4):56-61.
Zhao Ping,Li Dong,Chen Song.Study on High Temperature Geothermal Water in Jiuzhai Tunnel on Yuxi-Mengzi Railway[J].Journal of Railway Engineering Society,2008(4):56-61.
|
|
|
|