Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "F530":
6
MA Chunshan
Research on the Railway Freight Transportation Development Strategy Considering the Construction of the High-speed Railway along the Yangtze River
Journal of Railway Engineering Society 2022 Vol.39 (11): 6-11 [
Abstract
] (
3372
) 1 [
HTML
1 KB] [
PDF
804 KB] (
1914
)
101
ZHANG Xin-ning,ZHANG Jin-feng,LIU Na
Research on the Railway Project Bidding Based on Vickery Theory
Journal of Railway Engineering Society 2014 Vol.31 (5): 101-105 [
Abstract
] (
2703
) 1 [
HTML
1 KB] [
PDF
2724 KB] (
421
)
117
XIE Han-sheng,ZHOU Xin-jun,HUANG Yin,SHANG Yi-fan
Research on the Measurement of Carbon Emission from Railway Operation and Evaluation of Low-carbon Effect
Journal of Railway Engineering Society 2014 Vol.31 (3): 117-122 [
Abstract
] (
2782
) 1 [
HTML
1 KB] [
PDF
496 KB] (
266
)
114
FENG Yan-chao
Comparative Analysis of Tender Offer Based on Bill of Quantities for Railway Project Bidding at Home and Broad
Journal of Railway Engineering Society 2013 Vol.30 (10): 114-119 [
Abstract
] (
2595
) 1 [
HTML
1 KB] [
PDF
411 KB] (
498
)
82
ZHANG Tong – lin
Research on Fine Adjustment Quota of Catenary of High – speed Railway
Journal of Railway Engineering Society 2013 Vol.30 (5): 82-86 [
Abstract
] (
2591
) 1 [
HTML
1 KB] [
PDF
308 KB] (
98
)
96
WANG Yuan-peng
Discussion on the United - Supervision Mode Applied in the Large Bidding Section of Railway Construction
Journal of Railway Engineering Society 2008 Vol.25 (10): 96-99 [
Abstract
] (
2780
) 1 [
HTML
1 KB] [
PDF
396 KB] (
230
)
100
YANG Hong, ZHOU Zhao-jia
The Management Application of IS09001 Quality Management System in Engineering Supervision
Journal of Railway Engineering Society 2008 Vol.25 (10): 100-103 [
Abstract
] (
2496
) 1 [
HTML
1 KB] [
PDF
372 KB] (
154
)
88
LIU Dong-mei, HAN Tong-yin
Discussion on the PPP Financing Pattern in Railway Construction of China
Journal of Railway Engineering Society 2008 Vol.25 (9): 88-90 [
Abstract
] (
2563
) 1 [
HTML
1 KB] [
PDF
304 KB] (
237
)
103
JIANG Zai-qiu
Research on the Rapid Predicting Model for the Pre - estimated Investment in Railway Construction Project Based on Fuzzy Mathematics
Journal of Railway Engineering Society 2008 Vol.25 (7): 103-106 [
Abstract
] (
2652
) 1 [
HTML
1 KB] [
PDF
388 KB] (
151
)
1
LU Chun-fang
Adhere to Scientific and Technological Innovation to Provide Technical Support for Better and Faster Development of Railway Construction
Journal of Railway Engineering Society 2008 Vol.25 (1): 1-7 [
Abstract
] (
2564
) 1 [
HTML
1 KB] [
PDF
637 KB] (
217
)
83
WU Ming-you,MI Long
Speed up Establishing New Construction Technology Standard Systems for Railway Construction in China
Journal of Railway Engineering Society 2007 Vol.24 (11): 83-88 [
Abstract
] (
2522
) 1 [
HTML
1 KB] [
PDF
621 KB] (
165
)
98
LU Qing-cheng,REN Run-tang
Research on Application of PPP Financing Mode in Financing for Railway Construction in China
Journal of Railway Engineering Society 2007 Vol.24 (9): 98-101 [
Abstract
] (
2492
) 1 [
HTML
1 KB] [
PDF
454 KB] (
202
)
1
HE Hua-wu
Development and Technical Innovation of China Railway
Journal of Railway Engineering Society 2007 Vol.24 (7): 1-11 [
Abstract
] (
2680
) 1 [
HTML
1 KB] [
PDF
840 KB] (
474
)
119
WANG Shu-Yu
Comments on ”Model Text of Bid Documents on Railway Construction Project"
Journal of Railway Engineering Society 2007 Vol.24 (5): 119-122 [
Abstract
] (
2569
) 1 [
HTML
1 KB] [
PDF
357 KB] (
141
)
56
CHEN Kui
Industrialization and Development Orientation of Tunnel Boring Machine
Journal of Railway Engineering Society 2007 Vol.24 (3): 56-59 [
Abstract
] (
2662
) 1 [
HTML
1 KB] [
PDF
373 KB] (
159
)
78
RAO Wei-Fu,LI Wei
New Idea of Railway Investment——PPP Project Financing
Journal of Railway Engineering Society 2007 Vol.24 (3): 78-83 [
Abstract
] (
2629
) 1 [
HTML
1 KB] [
PDF
199 KB] (
99
)
84
YI Jian
Comments on Control Method of Investment in Railway Construction Project
Journal of Railway Engineering Society 2007 Vol.24 (3): 84-87 [
Abstract
] (
2635
) 1 [
HTML
1 KB] [
PDF
147 KB] (
213
)
96
LI Jing-song
Exploration on Countermeasures for Development of Railway Transportation in Course of Transport Integration
Journal of Railway Engineering Society 2007 Vol.24 (2): 96-99 [
Abstract
] (
2527
) 1 [
HTML
1 KB] [
PDF
65 KB] (
282
)
65
HAN Tong-yin,WANG Shu-yu,LEI Shu-hua
Review and Prospects for Management Reform of Railway Construction
Journal of Railway Engineering Society 2007 Vol.24 (1): 65-70 [
Abstract
] (
2503
) 1 [
HTML
1 KB] [
PDF
171 KB] (
171
)
107
LIU Jun-jie
Reform and Practice of Wage System for Railway Construction Enterprise
Journal of Railway Engineering Society 2006 Vol.23 (8): 107-110 [
Abstract
] (
2511
) 1 [
HTML
1 KB] [
PDF
148 KB] (
134
)
92
TIAN Jing
Increase Offer Level for Integral Bidding by Adopting Statistics Method
Journal of Railway Engineering Society 2006 Vol.23 (4): 92-96 [
Abstract
] (
2584
) 1 [
HTML
1 KB] [
PDF
358 KB] (
142
)
92
SHI Jing, YANG Lang, LIU Li-yuan
Research on the Regional Equity and Financing Problems of China Railway
Journal of Railway Engineering Society 2006 Vol.23 (3): 92-96 [
Abstract
] (
2660
) 1 [
HTML
1 KB] [
PDF
509 KB] (
143
)
83
CHANG Xiao-ming
ANALYSIS ON THE INNOVATION OF SURVEY AND DESIGN IN RAILWAY INDUSTRY-TENDERING THE DESIGN OF LUODING-CENXI RAILWAY
Journal of Railway Engineering Society 2006 Vol.23 (2): 83-86 [
Abstract
] (
2725
) 1 [
HTML
1 KB] [
PDF
117 KB] (
147
)
98
WANG Liping
PRINCIPLE FOR OVERSEAS INTERNATLONAL ENGINEERING PRO?JECTS
Journal of Railway Engineering Society 1999 Vol.16 (1): 98-102 [
Abstract
] (
2625
) 1 [
HTML
1 KB] [
PDF
316 KB] (
135
)
103
YANG Qibing
THE DEVELOPMENT OF INTERNATIONAL ENGINEERING MANAGE?MENT AND OUR STRATEGIES
Journal of Railway Engineering Society 1999 Vol.16 (1): 103-110 [
Abstract
] (
2696
) 1 [
HTML
1 KB] [
PDF
453 KB] (
717
)
129
YAN Zhangbo
QUALITY MANAGEMENT IN WORK SITE FOR ENGINEERING PRO?JECTS
Journal of Railway Engineering Society 1999 Vol.16 (1): 129-130 [
Abstract
] (
2641
) 1 [
HTML
1 KB] [
PDF
124 KB] (
601
)
131
HAN Xingxu
TALK ABOUT“ACHIEVE BENEFITS THROUGH EQUIPMENTS”
Journal of Railway Engineering Society 1999 Vol.16 (1): 131-134 [
Abstract
] (
2496
) 1 [
HTML
1 KB] [
PDF
213 KB] (
113
)
First page | Prev page | Next page | Last page
Page 1 of 1, 27 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech