Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U22":
76 WEN Jung
  The Architectural Design of Newly-built North Building of Tianjin Station
    Journal of Railway Engineering Society   2008 Vol.25 (6): 76-79 [Abstract] (2514) 1 [HTML 1 KB] [PDF 382 KB] (145)
62 LI Hong-mei
  Development of Overhead Contact Line System JY250 Applied for 250 km/h Speed-raised Railway
    Journal of Railway Engineering Society   2008 Vol.25 (4): 62-65 [Abstract] (2559) 1 [HTML 1 KB] [PDF 415 KB] (134)
82 Ruan Yun-bin, QI Guang-feng
  Discussion on the Guidance Effect of Computing Stress with Define-element on Design of Catenary of Electrified Railway
    Journal of Railway Engineering Society   2008 Vol.25 (3): 82-84 [Abstract] (2531) 1 [HTML 1 KB] [PDF 376 KB] (117)
85 HUANG He
  Application of Equivalent Load in Installing Catenary
    Journal of Railway Engineering Society   2008 Vol.25 (3): 85-87 [Abstract] (2551) 1 [HTML 1 KB] [PDF 301 KB] (150)
65 WANG Hong-mei, GUO Jing-wu
  Dynamic Reactive Power Compensation in Railway Substation
    Journal of Railway Engineering Society   2008 Vol.25 (2): 65-68 [Abstract] (2480) 1 [HTML 1 KB] [PDF 333 KB] (141)
77 WANG Guo-Bang, ZHAO Hong-yu, LUO Jian, DAI Lang-jie
  Comparison and Selection of the Catenary Suspension Installed on the Platform Canopy without Post in Jinan Rail Station
    Journal of Railway Engineering Society   2008 Vol.25 (2): 77-79 [Abstract] (2528) 1 [HTML 1 KB] [PDF 294 KB] (209)
91 LIU Jun-qi
  Application and Analysis of SCADA Technology for Railway 10kV Electric Power
    Journal of Railway Engineering Society   2008 Vol.25 (1): 91-94 [Abstract] (2518) 1 [HTML 1 KB] [PDF 540 KB] (150)
95 LI Ji-bin
  The Discussion on the Besting of 35kV Neutral Point of SHEBU Transformer Caused by Extinction Coil
    Journal of Railway Engineering Society   2008 Vol.25 (1): 95-99 [Abstract] (2463) 1 [HTML 1 KB] [PDF 526 KB] (276)
81 QU Chang-jun, DENG Yun-chuan
  Research on the Problem of Overvoltage of Traction Substation
    Journal of Railway Engineering Society   2007 Vol.24 (8): 81-84 [Abstract] (2514) 1 [HTML 1 KB] [PDF 273 KB] (150)
61 HAN Zhu-xian, WANG Guo-Bang
  Unevenness Analysis of Overhead Rigid Suspension Catenary
    Journal of Railway Engineering Society   2007 Vol.24 (4): 61-64 [Abstract] (2605) 1 [HTML 1 KB] [PDF 191 KB] (188)
65 CHEN Fei
  Calculation of Integral Power Factor of Newly-built 200 km/h Railway Line Shared by Passenger and Freight Trains
    Journal of Railway Engineering Society   2007 Vol.24 (4): 65-68 [Abstract] (2574) 1 [HTML 1 KB] [PDF 243 KB] (174)
60 ZENG Xiang-Ke
  Electromagnetic Compatibility between Electrification Railway and Navigation Facilities
    Journal of Railway Engineering Society   2006 Vol.23 (9): 60-64 [Abstract] (2474) 1 [HTML 1 KB] [PDF 174 KB] (163)
85 XING Zun-jun
  Study on Catenary Wear of Overhead Contact Wire System
    Journal of Railway Engineering Society   2006 Vol.23 (8): 85-87 [Abstract] (2594) 1 [HTML 1 KB] [PDF 175 KB] (196)
93 DENG Wu, YANG Xin-hua, ZHAO Hui-min
  Design and Realization of the Comprehensive Automation System for the Traction Substation
    Journal of Railway Engineering Society   2006 Vol.23 (8): 93-95 [Abstract] (2516) 1 [HTML 1 KB] [PDF 159 KB] (343)
96 WANG Shi-yu
  Design of Foundation of Rock Anchor Rod for Overhead Contact Wire System
    Journal of Railway Engineering Society   2006 Vol.23 (8): 96-98 [Abstract] (2554) 1 [HTML 1 KB] [PDF 163 KB] (179)
64 CHEN Ling
  Preliminary Discuss of Overhead Catenary System Project of Haerbin Metro Line
    Journal of Railway Engineering Society   2006 Vol.23 (7): 64-67 [Abstract] (2521) 1 [HTML 1 KB] [PDF 238 KB] (236)
73 LIU Li-rong, PAN Ying
  Exploration on New Type of Catenary Fittings and Quality of Current Collection of Pantograph and OCS for 200km/h Electrified Railway
    Journal of Railway Engineering Society   2006 Vol.23 (7): 73-75 [Abstract] (2519) 1 [HTML 1 KB] [PDF 138 KB] (82)
76 YANG Gang
  Program Research on Integrated Grounding System for Passenger Dedicated Railway Line
    Journal of Railway Engineering Society   2006 Vol.23 (7): 76-80 [Abstract] (2579) 1 [HTML 1 KB] [PDF 309 KB] (416)
74 WAN Yi, DING Dian-kuan, DENG Bin, LI Hui-jie, KE Jian
  Application of Fuzzy Synthesis Evaluation in Reliability Allocation of the Catenary System
    Journal of Railway Engineering Society   2006 Vol.23 (6): 74-77 [Abstract] (2597) 1 [HTML 1 KB] [PDF 322 KB] (146)
75 SONG Jiu-tao
  Discuss on the Necessity to the Electric Reconstruction of Beijing-Kowloon Railway Line
    Journal of Railway Engineering Society   2006 Vol.23 (3): 75-78 [Abstract] (2477) 1 [HTML 1 KB] [PDF 377 KB] (103)
92 LI Chun, YANG Zhen
  COMMENTS ON KEY POINTS OF CONSTRUCTION SUPERVISION FOR SPEED-RAISE PROJECT BY ELECTRIFICATION ON OPERATING RAILWAY LINE
    Journal of Railway Engineering Society   2006 Vol.23 (2): 92-95 [Abstract] (2428) 1 [HTML 1 KB] [PDF 118 KB] (123)
19 YANG Li-xin, DI Rong-guang, LIU Shi-bing
  STUDY ON THE MONITORING AND CONTROL SYSTEM OF STRAY CURRENT IN URBAN MASS TRANSIT
    Journal of Railway Engineering Society   2006 Vol.23 (1): 19-21 [Abstract] (2506) 1 [HTML 1 KB] [PDF 295 KB] (277)
74 WEN Jian-min
  RESEARCH ON REACTIVE-LOAD COMPENSATION SCHEME FOR TRACTION SUBSTATION OF YICHANG-WANZHOU RAILWAY LINE
    Journal of Railway Engineering Society   2006 Vol.23 (1): 74-78 [Abstract] (2500) 1 [HTML 1 KB] [PDF 406 KB] (161)
79 WEI Tian-kui, WANG Zhang-qi, SHEN Xiang-yu, LIU Chun
  METHOD OF SINGLE PHASE GROUNDING FAULT LOCATION FOR RAILWAY POWER SUPPLY LINE
    Journal of Railway Engineering Society   2006 Vol.23 (1): 79-81 [Abstract] (2563) 1 [HTML 1 KB] [PDF 294 KB] (117)
51 YUAN Yu-sen
  MATHEMATICS MODEL AND SIMPLIFIED CALCULATION FORMULA FOR ADJUSTMENT CALCULATION OF CATENARY POST ASSEMBLY
    Journal of Railway Engineering Society   2005 Vol.22 (6): 51-54 [Abstract] (2535) 1 [HTML 1 KB] [PDF 507 KB] (91)
55 WAN Yi, DENG Bin,Li Hui-jie,TIAN Zhi-jun,KE Jian
  RESEARCH ON RELIABILITY OF THE CATENARY SYSTEM BASED ON FTA
    Journal of Railway Engineering Society   2005 Vol.22 (6): 55-59 [Abstract] (2519) 1 [HTML 1 KB] [PDF 793 KB] (214)
88 PAN Ying, LIU Li-rong
  ANALYSIS OF THE CONTACT SYSTEM OF SUINING- CHONGQING RAILWAY LINE IN TEST SECTION
    Journal of Railway Engineering Society   2005 Vol.22 (5): 88-91 [Abstract] (2462) 1 [HTML 1 KB] [PDF 315 KB] (98)
92 CHENG De-qin, LIU Yang
  MANUFACTURE AND DEVELOPMENT ON CALCULATION SYSTEM FOR CATERNARY PROJECT
    Journal of Railway Engineering Society   2005 Vol.22 (5): 92-94 [Abstract] (2647) 1 [HTML 1 KB] [PDF 251 KB] (93)
66 GAO Jun
  EXPLORATION ON COMPOSITION OF BJ200 SERIES COMPONENTS OF ELECTRIFIED RAILWAY CATENARY AND TEST METHOD FOR ITS SYSTEMATICNESS
    Journal of Railway Engineering Society   2005 Vol.22 (4): 66-68 [Abstract] (3447) 1 [HTML 1 KB] [PDF 0 KB] (60)
90 LI Ji-sheng
  DESIGN AND ANALYSIS ON THE ELECTRIFICATION TRACTION SUBSTATION OF HONGKONG WEST RAIL
    Journal of Railway Engineering Society   2005 Vol.22 (3): 90-93 [Abstract] (4878) 1 [HTML 1 KB] [PDF 255 KB] (521)
First page | Prev page | Next page | Last pagePage 3 of 5, 121 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech