Abstract:The defects in the already constructed Jiuyanshan tunnel were severity by comparison. Besides badly seepage, the lining was badly scaled off, and the subgrade was boiling and mudding. This text analyzed the reason in defects thoroughly and exactly, at last put forward measures and proposed suggestions for their regulation.
苗晓岐. 九燕山隧道病害原因分析及整治措施建议[J]. 铁道工程学报, 2003, 20(2): 70-72.
MIAO Xiao-qi. ANALYSIS ON REASON OF DEFECTS IN JIUYANSHAN TUNNEL AND SUGGESTION OF MEASURES FOR THEIR REGULATION. 铁道工程学报, 2003, 20(2): 70-72.