Abstract:Research purposes:Through the analysis and evaluation of the dynamic observation of the post-construction systematic settlement of the railway bridge and culvert and the observed data on the actually tested settlement, the completion time of the final foundation settlement of bridges and culverts is evaluated, and the paving time of the ballastless track is determined reasonably to ensure the paving quality of the ballastless track of Passenger Dedicated Line. To the special situation encountered in the settlement observation, some suggestions are put forward for providing the reference to the similar works.
Research conclusions:From the observation of the settlement of Yunliang Grand Bridge of Harb in-Dalian Passenger Dedicated Line, and the analysis and evaluation of the settlement observed data, it is concluded by using curve fitting of the curve analysis method that the fitting result of double curves conforms to the real situation of Yunliang Grand Bridge, the stainless steel spiral observation mark should be used and four observation marks should be separately installed on four corners on both sides of the bridge pier, and the repeated observation should be conducted to the benchm ark (at least one CPI point or one CPII point) at fixed time by the same device and same method for improving the settlement observation accuracy.
杨吉新;李佳明. 哈大客运专线桥涵基础沉降观测分析与建议[J]. 铁道工程学报, 2010, 27(1): 38-41.
YANG Ji-xin, LI Jia-ming. Observation, Analysis and Suggestion to the Foundation Settlement of Bridges and Culverts of Harbin-Dalian Passenger Dedicated Line. 铁道工程学报, 2010, 27(1): 38-41.
Yan Xiwen. Observation Method for Foundation Settlement of Bridges and Culverts of Zhengzhou-Xian Passenger Dedicated Railway[J]. Bridge Construction, 2008(1):80-83.
[ 3 ] 黄声享. 变形监测数据处理[M]. 武汉:武汉大学出版社, 2003 .
Huang Shengxiang. Data Processing of Deformation Monitoring[M]. Wuhan:Wuhan University Press, 2003 .
[ 4 ] JG J8 2007, 建筑变形测量规范[S].
JG J8 2007, Code for Deformation Measurement of Building and Structure[S].
Jiang Zhonggui, Sheng Liming. Technology and Suggestions on the Bridges on Passenger Dedicated Line[J]. Journal of Railway Engineering Society, 2008(Supplement 1):40-52.
[ 6 ] 陈永奇. 变形观测数据处理[M]. 武汉:武汉大学出版社, 1988 .
Cheng Yongqi. Data Processing of DeformationObservation[M]. Wuhan:Wuhan University Press, 1988.
LI Jieyuan, Sheng Shaobing. Procedure for Observation on Bridge Engineering Settlement of New Guangzhou Railway Station in Wuhan-Guangzhou Passenger Dedicated Line[J]. Railway Investigation and Surveying, 2007(5): 44-46 .
Ding Yuanwen. Technology on Settlement Monitoring and Evaluation in Bridge Pier in Beijing-Tianjin Intercity Railway[J]. China Engineering Sciences, 2009(11):43-47.