Abstract:Research purposes: In order to resist the landslides while constructing a new open cut tunnel for an existing electrified railway, in condition of normal operation of the railway,in spite of the HV contact wire overhead and tracks below the line. If the reasonable measures are not taken, the delay of the construction progress is not guaranteed it will frequently and seriously threaten the traffic safety. Therefore,we must adopt safe and secure measures.
Research conclusions: The cut - and - cover tunnel will be constructed over the electrified railway for Chongqing -Huaihua in operation. According to the technology of“One cut - and - cover tunnel and one interval”,it solves the difficult problem of constructing subgrade of the cut - and - cover tunnel without impact on the regular operation of railway. The approach to the development of installing the“arch”steel tube brace for the transitional contact the way of suspension solves the difficulty of possibility of the electricity current cutting by which the catenary and locomotive in question are supported in case the existing pillars be removed. It originally makes the lining trolley in the arch ring which has the functions of lifting,sliding and anti - electric. It solves the problem that the lining trolley would not touch the contact wire while performing on the contact wire net and also protects the workers from the danger of electric shock.It could carry out the construction and guarantee the safety of operation at the same time with the arch ring of reverse templates. The above - mentioned new technology in construction is worthy being applied in the similar projects.
谢新民,邵青. 渝怀电气化铁路营业线增建明洞施工技术[J]. 铁道工程学报, 2011, 28(11): 82-87.
XEI Xin - min,SHAO Qing. Construction Technique of Constructing Cut - and - cover Tunnel over the Electrified Railway for Chongqing - Huaihua in Operation. 铁道工程学报, 2011, 28(11): 82-87.
Yinjun Zhao. The Analysis of Selection of Beijing -Shanghai High - speed Catenary Suspension Type[J].Journal of Railway Engineering Society, 2003( 2) : 100 -103.
Pengwen Zheng. Existing Line of Railway Construction in Myeongdong Anti - electric Car Gantry Construction Methods[J]. Railway Works, 2003( 4) : 74 - 75.
[4] 龙驭球,包世华. 结构力学教程[M]. 北京: 高等教育出版社, 2000.
Long Yuqiu,Bao Shihua. Structural Mechanics [M].Beijing: Higher Education Press,2000.