Abstract:Research purposes: Railway construction is a project for long-term service. Especially construction of the railway inmountain areas with lots of bridges and tunnels will encounter themore complicated and diversified geological conditions. Therefore, higher requirement is broughtout to the engineering arrangementdesign for railways inmountain areas. This paper sums up the arrangement design of bridge, tunnel and subgrade for one railway for the purpose of providing certain guidance for alignmentand engineering treatment so as to optimize the systematic design.
Research conclusions:In order to make railway construction in mountain areas technically feasible, economically reasonable, safe and reliable, the engineering arrangement design thoughts of " giving priority to bridges& tunnels engineering rather than subgrade" must be corrected, the phenomenon of " concentrated and less" arrangement of bridges and tunnels appeared inNanning-Kunming Railway and Neijiang-Kunming Railway should be avoided, and the " pretend subgrade" should be reduced. To any section featured by high filling, deep excavation or major unfavorable geological conditions that may cause engineering diseases, selection should be made following the comparison of schemes ofbridges& tunnels and subgrade comprehensively and taking the factors into account such as rationality in economy, soundness in technology and safety so as to lower the risk of railway construction and operation.
卓建成. 困难山区铁路工程布局设计研究[J]. 铁道工程学报, 2009, 26(12): 5-7.
ZHUO Jian-cheng. Research on the Engineering Arrangement Design for Railways in Difficult Mountain Area. 铁道工程学报, 2009, 26(12): 5-7.