Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U215":
7 SUN Yu-guo, LIU Cheng-jun
  RESEARCH ON APPLICATION OF BOOSTING SYSTEM IN RAILWAY CONSTRUCTION PROJECT
    Journal of Railway Engineering Society   2005 Vol.22 (3): 7-11 [Abstract] (2546) 1 [HTML 1 KB] [PDF 447 KB] (123)
47 YANG Lai-shun
  RAIL WELDING OF JOINTLESS OF PASSENGER DEDICATED LINE
    Journal of Railway Engineering Society   2005 Vol.22 (1): 47-50 [Abstract] (2563) 1 [HTML 1 KB] [PDF 384 KB] (188)
17 WANG Xin
  TECHNIQUE AND EXPENSES OF LINEARLY MOVABLE CON- TACT-WELD
    Journal of Railway Engineering Society   2004 Vol.21 (4): 17-20 [Abstract] (2498) 1 [HTML 1 KB] [PDF 317 KB] (130)
60 GONG Wei
  DISCUSSION ON CRACK CONTROL IN CONSTRUCTION OF IN- TEGRATE BALLAST BED
    Journal of Railway Engineering Society   2004 Vol.21 (4): 60-61 [Abstract] (2559) 1 [HTML 1 KB] [PDF 201 KB] (95)
109 TANG Jun, CHENG Gui-zhi
  CONSTRUCTION TECHNIQUE OF FLOATING PLATE BALLAST BED WITH CONTINUOUS-CASTING IN PLACE-METAL ELASTIC BUFFER FOR URBAN RAIL
    Journal of Railway Engineering Society   2004 Vol.21 (1): 109-112 [Abstract] (2512) 1 [HTML 1 KB] [PDF 219 KB] (130)
44 LI Jun
  CONSTRUCTION TECHNIQUE OF BALLASTLESS SLAB TRACK ON THE BRIDGE FOR QINSHEN SPECIAL RAILWAY LINE FOR PASSENGER TRANSPORTATION
    Journal of Railway Engineering Society   2003 Vol.20 (3): 44-50 [Abstract] (2479) 1 [HTML 1 KB] [PDF 233 KB] (185)
91 XUE Lin
  SELECTION AND PURCHASE OF CONSTRUCTION KEY MACHINERY QUIPMEN TS FOR BRIDGE ERECTION AN D TRACK LAYING ON QIN-SHEN DEDICATED RAPID PASSENGER TRAFFIC RAILWAY LINE
    Journal of Railway Engineering Society   2002 Vol.19 (4): 91-95 [Abstract] (2488) 1 [HTML 1 KB] [PDF 150 KB] (105)
117 YAN G Wei-bin, QIAN Zhen-di, ZHANG Ning-nan, XUE Hong-xi, YAO Xu
  THE SYNTHESIS OF CONSTRUCTION TECHNIQUE FOR ONCE TRACK LAY- IN G OF CON TIN UOU S WE LDED RAIL IN A N E WLY BU IL T RAIL WAY
    Journal of Railway Engineering Society   2002 Vol.19 (4): 117-120 [Abstract] (2501) 1 [HTML 1 KB] [PDF 150 KB] (123)
139 ZHANG Li-bo
  STUDY ON PROBLEMS CONCERNED WITH RAILWAY TRANSPORTATION EN TERPRISE S GOIN G TO MARKET
    Journal of Railway Engineering Society   2002 Vol.19 (4): 139-140 [Abstract] (2517) 1 [HTML 1 KB] [PDF 98 KB] (137)
117 WAN Shao-hui
  APPLICATION OF PRESTRESSED ANCHOR-CABLE TECHNIQUE FOR TREATMENT OF LANDSLIDE IN CUTTINGS WITH STEEP SLOPES
    Journal of Railway Engineering Society   2001 Vol.18 (1): 117-121 [Abstract] (2526) 1 [HTML 1 KB] [PDF 282 KB] (128)
105 CHEN Zheng-guo
  COLLAPSE AND SLIDE CHARACTERISTICS DURING RAILWAY CONSTRUCTION OF DOUBLE TRACK LINE IN SOUTHERN RAINY REGIONS AND THEIR PROTECTIVE COUNTERMEASURES
    Journal of Railway Engineering Society   2000 Vol.17 (3): 105-108 [Abstract] (2530) 1 [HTML 1 KB] [PDF 131 KB] (122)
123 PEI Sheng-yan,LI Yan-long
  CONSTRUCTION OF ROADBED BY FILLING ROADBED WITH FINE SAND
    Journal of Railway Engineering Society   1999 Vol.16 (4): 123-126 [Abstract] (2521) 1 [HTML 1 KB] [PDF 210 KB] (115)
88 XU An-hua
  REVIEW AND THOUGHT ON MECHANIZATION OF RAILWAY CONSTRUCTION
    Journal of Railway Engineering Society   1999 Vol.16 (2): 88-93 [Abstract] (2510) 1 [HTML 1 KB] [PDF 461 KB] (123)
99 PAN Pei-hua
  ANALYSIS AND PREVENTION ON COMMON ACCIDENT OF CRAWLER CRANE DURING FORCED TAMPING ON FOUNDATION
    Journal of Railway Engineering Society   1999 Vol.16 (2): 99-103 [Abstract] (2521) 1 [HTML 1 KB] [PDF 353 KB] (124)
First page | Prev page | Next page | Last pagePage 2 of 2, 44 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech