Research on Technology for Opening Compartment and Changing Cutleries of Slurry Shield Under Complicated Geological Conditions
Journal of Railway Engineering Society
2013 Vol.30 (3): 62-65
[Abstract]
(2694)
1
[HTML 1 KB]
[PDF 445 KB]
(400)
44
ZHOU Xiao-fu
Seismic Design of Shanggou Bridge of Lanzhou North Loop Road
Journal of Railway Engineering Society
2013 Vol.30 (2): 44-47
[Abstract]
(2595)
1
[HTML 1 KB]
[PDF 770 KB]
(94)
48
YANG Shan-kui,YUAN Ming,YAN Yong,DAI Sheng-Yong
Design of Continuous Beam - arch Combined Structure for Passenger Dedicated Line
Journal of Railway Engineering Society
2013 Vol.30 (2): 48-52
[Abstract]
(3270)
1
[HTML 1 KB]
[PDF 787 KB]
(342)
53
SUN Zong-lei,LI Qiao
Analysis of Settlement Influence on Beijing-Shanghai High-speed Railway Caused by Under-passing of Shijiazhuang-Jinan Passenger Dedicated Line's Bridge
Journal of Railway Engineering Society
2013 Vol.30 (2): 53-57
[Abstract]
(2602)
1
[HTML 1 KB]
[PDF 1341 KB]
(358)
1
CHEN Wei
The Layout Research of Hubei Railway Passage along Yangtze River
Journal of Railway Engineering Society
2013 Vol.30 (1): 1-4
[Abstract]
(2692)
1
[HTML 1 KB]
[PDF 419 KB]
(107)
29
SHANG Hai-tao
Study on Application of Horizontal Rotation Method in Railway Bridge Construction
Journal of Railway Engineering Society
2013 Vol.30 (1): 29-34,84
[Abstract]
(2629)
1
[HTML 1 KB]
[PDF 758 KB]
(179)
35
WANG Bing-di
Research on Reinforcement Technology for Treating Earthquake Disaster of Bridge
Journal of Railway Engineering Society
2013 Vol.30 (1): 35-38
[Abstract]
(2555)
1
[HTML 1 KB]
[PDF 365 KB]
(99)
69
XUN Jia—lei
Design of High Frame Pier of Left Interconnecting Super Major Bridge of Beijing—Shijiazhuang Passenger Dedicated Line
Journal of Railway Engineering Society
2012 Vol.29 (12): 69-71
[Abstract]
(4903)
1
[HTML 1 KB]
[PDF 774 KB]
(258)
72
WEI Qing
Analysis of Secondary Stress of Fully Welded Steel Truss Bridges
Journal of Railway Engineering Society
2012 Vol.29 (12): 72-77
[Abstract]
(2707)
1
[HTML 1 KB]
[PDF 890 KB]
(110)
78
WANG Fei,TIAN Shan - po,ZHUO Yi
Analysis of Elastic - plastic Seismic Response of Non - regular Highway
Journal of Railway Engineering Society
2012 Vol.29 (12): 78-84
[Abstract]
(2584)
1
[HTML 1 KB]
[PDF 959 KB]
(240)
49
ZHANG Yun-bo,SUN Li-wei
Analysis of Influence of Vehicle Overload on Reliability of Low-tower Cable Stayed Bridge
Journal of Railway Engineering Society
2012 Vol.29 (11): 49-53
[Abstract]
(2554)
1
[HTML 1 KB]
[PDF 589 KB]
(293)
54
TIAN Yong - qiang
Construction Technology for Levee Protection of Foundation of Pier 3 of Wuhan Yingwuzhou Yangtze River Bridge
Journal of Railway Engineering Society
2012 Vol.29 (11): 54-57
[Abstract]
(2621)
1
[HTML 1 KB]
[PDF 635 KB]
(131)