2013 Vol. 30, No. 7
Published: 2013-07-15
1
Study on Reasonable Slope Shape of Temporary Slope in Open Cut Area of Loess Tunnel
CHENG Wen – bin, JIANG Xin - zhao
Research purposes: In order to ensure the slope safety during excavation under the condition of no supporting, save the cost and prevent the slope collapse, the reasonable excavation slope shape should be selected for the temporary slope in the open cut exit of the Hanguguan Tunnel of the Zhengzhou - Xian High - speed Railway.
Research conclusions : By doing the numerical calculation,the analyses of the stress change regulation and the influence of the slope shape on the loess slope stability were made to monitor the displacement variation characteristics of the empty surface and internal parts of the slope body. The result showed : (1) The upright side wall was harmful to the slope stability, and the maximum displacement appeared on the top of the upright side wall. (2) The overall stability of the slope with the upright sidewall is not only affected by the slope of the excavation depth,but also by the slope ratio of the secondary slope adjacent to upright sidewall. When the slope excavation depths were the same, the small the slope ratio of secondary slope was and the better the overall stability of the excavation slope was. (3) To ensure the excavation safety of the temporary loess slope in the open cut exit of the Hanguguan Tunnel of the Zhengzhou – Xi′ an High — speed Railway, the straight slope was used, with the upright sidewall height of 9 m and the secondary slope ratio of 1 : 1. The research results can provide the scientific basis for the similar works.
2013 Vol. 30 (7): 1-5 [
Abstract
] (
3275
)
HTML
(1 KB)
PDF
(1886 KB) (
123
)
6
Research on Reinforcement of Foundation in Coal Mine Goaf for Guangxi Coastal Railway
WEI Yao - hu
Research purposes: Aiming at the situation that the coal mining goaf existed in upgrading of the railway in the Nanning - Qingzhou section of the Guangxi coastal railway, the discussion was made on the design method for reinforcing the goaf with grouting. In this paper,the introduction is given to the determination of the grouting scope,the drilling space arrangement, the choice of slurry and the treatment methods for the common problems happened in the construction,and the ideas are given out on building railway in the goaf to provide the reference to the similar works.
Research conclusions : (1) As the slurry permeated, split and compacted into the holes and cracks in the goaf, the concretions were formed in the bending crack and fissure zones when the boring grouting was used. In this way, the foundation strength was improved effectively and the settlement and stability requirements of the railway foundation were met. (2) The dynamic design was used for treatment project and the project was divided into two stages. The first stage included the exploring and pouring of the combined holes, the holes, curtain grouting holes and the test section. The second stage included the exploring and pouring of the II and HI holes according to the parameters of the first stage. This design scheme was proved feasible. (3) The design and construction of this project can provide the guidance and reference to similar reinforcement projects in the future.
2013 Vol. 30 (7): 6-10 [
Abstract
] (
3354
)
HTML
(1 KB)
PDF
(1424 KB) (
457
)
11
Numerical Analysis of Load Transfer Mechanism of Recursive Control Anchor
HU Tian-fei1,ZHU Ben-zhen2, ZHENG Jing2, LIANG Long-long2
Research purposes: Currently, the problem of the big size of external anchor structure often exists in the existing high strength anchors. On the basis of the study on the load dispersion - type anchors,a new structure of slope anchorage — recursive control anchor is presented and the 3-D explicit finite difference method is used for the numerical simulation and study on the load transfer mechanism of the recursive control anchor.
Research conclusions : (1) The shear stress in the bonding section is distributed in the light of exponential curve form of the single peak in stead of unevenly distributed form when the anchor is loaded. The recursive control anchor can disperse the concentrated load into several smaller loads on the different bonding sections among the sliding masses to make full use of the formation strength of the free segment. (2) The results of numerical simulation are basically consistent with the results of the qualitative analysis and model test. It shows that the numerical simulation of the anchor action process is feasible, (3) The recursive control anchor can overcome the traditional anchor's shortcoming that the counter - force load is entirely borne by external anchor structure and can reduce the size of external anchor structure effectively. (4) The research results can be applied in the slope reinforcement and quick treatment of the disease.
2013 Vol. 30 (7): 11-15 [
Abstract
] (
2870
)
HTML
(1 KB)
PDF
(2371 KB) (
434
)
16
Comment on Determination Method for Foundation Bearing Capacity
WANG Ying-he,ZHAO Xin-yi, ZENG Chang-xian
Research purposes :The foundation bearing capacity is a fundamental issue in design of foundation,but the current standards are different in design theories and design parameters, and there are lots of the different technical terms in different times and in different industries. In order to provide the basis for the limit state design method for the foundation treatment, the basic design concepts, design theories and design methods for determination of the bearing capacity of the foundations of building, harbour, highway and railway were summarized.
Research conclusions : ( 1 ) At present, the safety factor method is mainly used in the architecture and railway industries. The limit state design method is used for the harbour foundation and with this method,the reliability of strength index, the safety of the structure and the situation of the soil are comprehensively considered in the partial factors of the resisting force of the foundation. (2) Due to the particularity of the geotechnical engineering,the limit state method used for geotechnical engineering should be understood correctly,the previous statistical analysis and experiences should be focused on,the survey method and design parameter should be normalized and the conceptual design and the site monitoring should be emphasized. (3)The result can direct the research on the reinforcement of railway foundation with the limit state design method.
2013 Vol. 30 (7): 16-21 [
Abstract
] (
2830
)
HTML
(1 KB)
PDF
(606 KB) (
297
)
22
Research on Construction Scheme Design of Subgrade of a Coal Special Rail?way Line
ZHANG Zhen
Research purposes: This paper describes the overall construction program of a coal special line base in collapsible loess area. Because the collapsibility and water sensitivity of loess are notable,it is necessary to take and use the appropriate measures and construction program according to the features of foundation and engineering slope in loess
Research conclusions : (1) The collapse and uneven settlement are easy to appear to the foundation in collapsible loess area and the loess subgrade slope is the place where the water loss and soil erosion happen frequently. (2) In order to improve property and capacity of the deformation resistance of the railway subgrade in collapsible loess area and enhance the overall stability of the subgrade,the loess foundation must be treated specially and at the same time the slope protection must be conducted effectively. (3) The loess foundation treatment methods include the backfilling, the heavy rolling, building the sand cushion, heavy compaction, building geogrid and other forms. (4) The control of the Filling material is very important to the slope protection of loess subgrade and it incluses the controls of the particle size, moisture content, degree of compaction and so on. (5) The construction organization design presented in this paper, especially the measures for the subgrade reinforcement and the slope protection are available for the subgrade construction of heavy - haul railway in gravity - type loess area.
2013 Vol. 30 (7): 22-27 [
Abstract
] (
3411
)
HTML
(1 KB)
PDF
(487 KB) (
194
)
28
Research on Method for Stiffness Homogenization in Turnout Area
FEI Wei-zhou
Research purposes: The research was done on the significance of turnout stiffness homogenization and the setting method for the stiffness homogenization for high - speed turnouts at home and abroad to contrast the stiffness homogenization methods and results in different countries for evaluating the stiffness homogenization result in China.
Research conclusions: (1 ) The stiffness homogenization in turnout area is particularly important to the regularity, safety, comfortableness and service life of high — speed turnouts. (2) For the France's turnouts, the stiffness homogenization is achieved by increasing the rubber pad stiffness, and this method is simple without using the transition section. (3) For the Germany^ turnouts, the elasticity of the pad is controlled strictly by vulcanization, and both the design and manufacture are complicated. (4)For the China's high - speed turnouts, the turnout is divided into different sections according to different structure, and the stiffness homogenization is achieved by vulcanization. (5) Although the measures taken by the countries are different, but the stiffness homogenization in turnout area are achieved in different countries. (6) The turnout dynamic test and application show the method and measures used for the stiffness homogenization of the high — speed turnout in China are reasonable and feasible.
2013 Vol. 30 (7): 28-33 [
Abstract
] (
2666
)
HTML
(1 KB)
PDF
(1867 KB) (
430
)
34
Key Technology and Applicable Method of CYP 500 Cluster Tie Type Long Rail Track - laying Machine Unit
CHEN Meng-qiang,LI Shi-long
Research purposes : Aiming at the problems that the traditional track laying machine with single tie continuous process needs the high cost, has the high failure rate and the track tie is subjected to damage due to impact, a new CYP 500 cluster tie type long rail track - laying machine unit is developed and manufactured in China with the self intellectual property right ,and as the core technology,the operation mode of 11 arranging the sleeper in cluster and laying the track in step" is adopted to this machine unit, with the features of the excellent performance, simple operating procedure,convenient maintenance and use and low cost. This machine unit can meet the requirements of laying ballast and ballastless tracks with 500 m long rail.
Research conclusions: (1) This track - laying machine unit integrates the long - rail track laying and the tie arranging, and is mainly composed of the long rail tractor,the host and auxiliary machines,tie carrying car, rail /tie transportation train, power system, hydraulic system, electric control system and brake system. (2) The operation mode of the host machine is designed as the " arranging the tie in cluster and laying the track in step" by using the innovative mechanism of the laying the tie evenly and sleeper arranging machine, and by using this method, the problems of high failure rate and the tie damage caused by the impact can be solved and the costs of the machine manufacture, operation and maintenance can be much cut. (3) The modularization design and manufacture are adopted to this machine unit,resulting in convenient and flexible assembly, disassembly and transferring to other site. (4) This machine machine is made in Chins with adopting the existing mature technology for long rail track laying, computer control technology and the mechatronics technology, so that the convenient use and maintenance can be achieved. (5) This research results is available for laying the ballast and ballastless tracks with the 500 m long rail or below.
2013 Vol. 30 (7): 34-39 [
Abstract
] (
2947
)
HTML
(1 KB)
PDF
(353 KB) (
663
)
40
Fatigue Design and Experimental Research on Concrete Filled Steel Tube Structure of Railway Bridge
XU Sheng-ping,PENG Lan-ping
Research purposes: As the concrete filled steel tube structure of the railway bridge has the feature of big stress amplitude under the active load of train, the fatigue design is very important. However, there is no corresponding clause in the current design codes at home and abroad, so it is necessary to do the research on the fatigue design and experiment on the concrete filled steel tube of the railway bridge.
Research conclusions : ( 1 ) Based on the actually measured impact coefficients of the bridge vibration tests of the concrete filled steel tube structures of three railway bridges,the suitable formula for calculation of the impact coefficients on such kind of bridge under the active load of train was got by fitting to ensure the calculation reliability of the stress amplitude under the active load. (2) The introduction was given to the geometric and physical technical parameters and stress concentration coefficient of the tube segment and the stipulation of classification the fatigue details. (3) The static test and fatigue test of the tube segment structure were conducted. Based on the analyses of the test data of the segment between tubes and tube segment, the simple and practical fatigue test methods for the segment between tubes and the tube segment were presented for the fatigue design of concrete filled steel tube structure of railway bridge. (4) This research result is available for the concrete filled steel tube structure of various bridges.
2013 Vol. 30 (7): 40-46 [
Abstract
] (
5018
)
HTML
(1 KB)
PDF
(960 KB) (
448
)
47
Research on Construction Technology for Original Section of Large Span Single T Rigid Frame Four - track Bridge
YI Da, HU Guo-wei
Research purposes: In order to ensure the concrete construction safety and quality of the long, high and heavy original section of the large span single T rigid frame four - track and double - width curved bridge of the Tianjiayaohao Bridge,the research was done on the key construction technologies for the original section of the bridge, including the support system, the external formwork system and the construction technology of C55 polypropylene fiber concrete.
Research conclusions : (1) Because the hydraulic integration adjustable bracket was installed on the double thin - wall top,the problem of adjusting the bracket height was overcome,so the safety risk of the support construction was reduced and the construction safety and quality of long, high and heavy original section was guaranteed. (2) A concrete self--supporting bracket system was used in bridge contact network platform, so,the foundation construction of flange could be conducted simultaneously with construction of the catenary support. In this way, the engineering cost was reduced and construction time was shortened. (3) The C55 polypropylene fiber concrete was used to improve the crack resistance of the concrete. The layered pouring and reasonable process were adopted to ensure the construction quality of the concrete. (4) This research result is available for construction of the railway high - pier long-span continuous rigid frame bridge and single T rigid frame bridge.
2013 Vol. 30 (7): 47-52 [
Abstract
] (
3562
)
HTML
(1 KB)
PDF
(2322 KB) (
110
)
53
Key Construction Technology for Construction of Xiamen Xiang' an Subsea Tunnel across Monzonlite Vein
WANG Yan-qing
Research purposes: The Xiamen Xiang'an Subsea Tunnel is the first subsea tunnel built in the China mainland. As the geological conditions were complex, the accidents of water and mud bursting and the collapse easily happened when the service tunnel of the Xiamen Xiang'an Subsea Tunnel crossed monzonite veins. It was one of the difficult points in construction and it also never been met in the previous tunnel construction. Therefore,there was no construction experience to draw. During the construction process, the feasible excavation methods and supporting program had to be used along with the advanced geological prediction, monitoring and measurement in order to ensure the safe and fast construction.
Research conclusions ; (1) By making the feasible geological prediction,the accurate geological situation was obtained. By making the FLAC3D numerical simulation and comparison of the excavation schemes with bench method, the 6m step height was easily chosen. Based on the controls of the stratum deformation and tunnel stability, the reasonable 2 m excavation footage was adjusted with the help of the FLAC3D numerical simulation, and the reasonable step length was 10m. (2) In order to meet the requirements of the strength, stability and durability, the composite lining was adopted to the service tunnel of the Xiamen Xiang an Tunnel. (3) For the monozonite veins section, by monitoring and measuring the subsidence of the crown and the convergence of the cave,the rationality of the scheme and the effectiveness of specific measures were verified.(4)The key technology system of the excavation,support,geological prediction and monitoring and measuring for the Xiamen Subsea Tunnel can provide the referenee to construction of submarine tunnel across monozonite veins section or weathered rock section.
2013 Vol. 30 (7): 53-58 [
Abstract
] (
2702
)
HTML
(1 KB)
PDF
(2418 KB) (
161
)
59
Influence of Stratiform Expansion of Expensive Strata on Structure Load of Shield Tunnel
FANG Yong, CUI Ge, FU Ya-peng, YANG Bin
Research purposes: In stratiform strata, the uniform falling and rising of underground water level will cause the stratiform expansion of expansive rock and soil strata to affect the load on shield tunnel lining structure. The equation for the stress formation caused by stratiform expansion was deduced and numerical calculations were carried out for the outside pressure on the lining structure when the stratiform expansion happened to the expansive soils mass above and below the tunnel and on both sides of tunnel.
Research conclusions : (1) As the soil physical parameters change,the stratiform expansion of soil mass will bring about the change of the outside pressure on the structure and generate the additional load. This expansive load is related to the expansion force and the free expansivity of the expansive soil. (2) When the stratiform expansion of expansive soil mass appears above or below the tunnel, the expansive load is small, and is less affected by the expansion force, thickness of expansive soil and distance between tunnel and expansive soil mass. (3 ) When the stratiform expansion of expansive soil happens on both sides of tunnel, the outside pressure on the tunnel structure increases largely, and the load increases with the increase of expansion force of the expansive soil. However, a certain expansion scope and expansion force are beneficial to the load on tunnel structure. (4) The research results can be used for guiding the sampling values of expansive load in design of shield tunnel structure.
2013 Vol. 30 (7): 59-64 [
Abstract
] (
2659
)
HTML
(1 KB)
PDF
(1421 KB) (
455
)
65
Design and Study on No. 9 Single Turnout of 60 kg/m Rail of Urban Rail Transit
LIU Dao-tong,CHENG Bao-qing, TIAN Miao-sheng
Research purposes: The No. 9 turnout of 60 kg/m is usually used in urban rail transit s main track and auxiliary track. There are mainly two types of turnouts used in the urban rail transit, namely the turnouts with the straight switch rail and the curve switch rail. The turnout with straight switch rail is available for the siding speed of 30km/h and the turnout with curve switch rail is available for the speed of 35 km/h. In order to improve the service level, the turnout with curve switch rail is used in the new 一 built metro. But the turnout with curve switch rail has its disadvantage,such as the serious wear of the switch rail and many non 一 standard parts. In order to give the paly of the single turnout with straight switch rail, a new type of single turnout available for the siding speed of 35 km/h is presented in this paper, with the features of the simple structure and long service life.
Research conclusions : (1) This new type of single turnout of the 60 kg/m rail has the straight switch rail,straight frog, and circular curve, with the simple structure. (2) Two switch rails are symmetrical, and can be pulled flexibly.(3)This turnout is available for the siding speed of 35 km/h,with less maintenance. (4) This research result has obvious advantages in the mature technology, reliability and security, and it is available for the metro, light rail and trolley car.
2013 Vol. 30 (7): 65-69 [
Abstract
] (
2660
)
HTML
(1 KB)
PDF
(1807 KB) (
184
)
70
Study on Suspension and Fixing of Catenary under Upper Cover Platform of Metro Vehicle Depot
HOU Mao-hua
Research purposes : The suspension and fixing of the catenary under upper cover platform are different from those with the existing methods because they need to consider the impact of upper cover platform. Therefore, it is necessary to do the research on the impacts of the civil engineering requirements, construction difficulty, installation period and maintenance convenience requirement on the suspension and fixing of the catenary under the upper cover platform to determine the available catenary suspension and fixing modes under the upper cover platform.
Research conclusions : The research was done on the suspension and fixing of the catenary under the upper cover platform of the Tanglang Vehicle Depot of Shenzhen metro on learning the suspension and fixing modes of the catenary in the high - speed railway tunnel. From the research,it is concluded : (1) The crossing suspension mode should be adopted to the catenary under upper cover platform of metro vehicle depot. (2) The structure of the embedded C shaped steel (channel) should be adopted to the catenary under the upper cover platform on determination of the technical parameters and requirements of the C shaped steel embedded parts. (3) The design plans of the various embedded parts corresponding to the contacting suspension and fixing (crossing fixing cable, hoist cable and cantilever, etc) and installation of the anchor and isolation switch were determined on the research. (4) From the angle of the project management, the analysis was made for the advantages of the structure of embedded C - shaped steel mode for the catenary’s suspension and fixing. The proposal was made that this mode would be widely used in the catenary engineering.
2013 Vol. 30 (7): 70-73 [
Abstract
] (
2619
)
HTML
(1 KB)
PDF
(810 KB) (
222
)
74
Application of CRD + Top - bracing Control Technology in Close - attached Under - crossing Engineering
TAO Lian-jin,LI Ji-dong,WANG Guo-feng
Research purposes: With the powerful development of the urban rail transit, three are more and more new tracks to cross the existing track engineering. However,it is difficult for the traditional construction technology to control the settlement of the existing structures and it needs higher cost. In this paper, combined with the construction of the Gongzhufen Station of the Line 10 of Beijing metro to under - cross the Gongzhufen Station of the Line 1,the introduction is given to the construction technology that is available for effective control of the settlement of the existing structure with the appropriate cost to provide the reference to the similar works.
Research conclusions : (1) The settlement of the bottom plate structure of the existing station is affected by the release of stress of the working face, the disturbance to bottom during excavation,the excavation height,the long closure time of the primary support structure and no timely jacking of the jack,and the release of the stress of the working face is the main reason for the settlement of the existing structure. (2) The settlement of the existing structure can be effectively controlled by taking the measures of adding the temporary columns and jacks,reinforcing the foundation base with steel frame, grouting to the back of the primary support with extreme fine cement paste and jacking up by jacks, and the jacking up by the jacks is the most powerful means to control the settlement. (3 ) The CRD + top brace control technology is available for effective control of the settlement of the existing station and meet the settlement of 3 mm.
2013 Vol. 30 (7): 74-79 [
Abstract
] (
2884
)
HTML
(1 KB)
PDF
(1408 KB) (
225
)
80
Design and Research on Bituminous Mixture Composition
LI Teng-yun
Research purposes: This paper researches the advantages of the coarse and fine aggregate gradation of embedded crowed skeleton structure compared with the intensive suspended gradation mainly in the areas of the design requirement of the bituminous mixture composition, the theoretical analysis and the concrete project application.
Research conclusions : The revision trend of the normative gradation scope has proved that the S - shaped embedded crowed skeleton gradation has been generally accepted in a certain extent. To control the cost of bituminous mixture to the lowest level,the design of the bituminous mixture composition should fully consider the raw material cost,the production cost of the mixture materials, the construction cost and the later-stage maintenance cost. In the allowable circumstances, the coarse aggregates VMA should be designed as small as possible, and the overall clearance rate of the mixture materials should be adjusted by adjusting fine aggregate and filling material so as to optimize the performance of mixture materials.
2013 Vol. 30 (7): 80-84 [
Abstract
] (
2520
)
HTML
(1 KB)
PDF
(453 KB) (
143
)
85
Study on Configuration of Blast Holes for Open - air Blasting of Roadbed Rock
LI Xia-chu
Research purposes : Aiming at the features of the numerous rock variety and large quantities of rock blasting of the Chengdu - Chongqing Highway Project, the research was done the configuration of blasting holes for open - air blasting of the roadbed rock,it was proposed that the equilateral triangular network might be the best configuration of blast holes and a formula was present to illustrate the relation between the hole distance and the diameter of aperture according to the different kinds of rock for providing the reference to the similar works.
Research conclusions ; (1) The equilateral triangular network is generally used for the configure of the blast holes when the diving drill is adopted for the open - air blasting of the roadbed rock. It has the obvious advantages that the blasted rock blocks are even with the small amount of the under-blasted and over - blasted rocks. (2) The configuration of blast holes and the distance between the hole rows are closely related to the the diameter of aperture. Regarding to the diameters of the rock and drill ( diameter of aperture) , there is a reasonable range for the distance between the two ad?joining hole rows. If the distance of hole configuration exceeds this range,the flying rocks,larger rock blocks and even hopper blasting may happen in blasting. (3)This research result is available for the open - air blasting of the roadbed rock with a good effect.
2013 Vol. 30 (7): 85-89 [
Abstract
] (
2571
)
HTML
(1 KB)
PDF
(392 KB) (
177
)
90
Research on Ecological Restoration of Alpine Steppe along Qinghai - Tibet Railway
ZHAO Yan-zhou,XUE Chun-xiao,YANG Yin-hai
Research purposes : The alpine steppe ecological zone in the Qinghai 一 Tibet plateau along the Qinghai - Tibet railway is in the alpine arid climate zone featured with the simple ecological structure,shorter growing period of the plant, easy degradation of the plant by interference and long process of nature recovery. It is difficult to restore its ecology due to the unique,original and weak features mentioned above. During the railway construction and operation, it is inevitable to carry out excavation and filling construction to produce the engineering wound,resulting in a number of frozen soil engineering and environmental problems, such as the degradation of permafrost, grassland desertification, frost damage of railway subgrade and loss of water and soil. So it is necessary to study the technology for the regional ecological restoration. In this paper, the introduction is given to the research on the appropriate technology for the ecological restoration along the railway for providing the technical support to the restoration work.
Research conclusions : (1 ) The seed - nutriment - soil sacks technology presented in this paper is available for the ecological restoration of alpine steppe along the railway. (2)The plant species of the Poa ciymophia, Elymus nutans and Elymus sibiricus were used in the tests,getting the good joint effects. The stable phytobiocoenose was form in the second year after the project. The amounts of seed plant of Poa ciymophia,Elymus nutans and Elymus sibiricus were separately 0.5g,4g and 4g. (3) Adding the water - absorbent polymer and organic fertilizer in the planting matrix got obvious effect. (4)The research results could be applied in ecological and geological disaster prevention and control projects for the transportation construction in permafrost regions of the Tibetan plateau.
2013 Vol. 30 (7): 90-94 [
Abstract
] (
2603
)
HTML
(1 KB)
PDF
(1361 KB) (
262
)
95
Research on Recognition and Evaluation of Landslide Risk
WEI Yong-xing,DING Zhao-eng,LUO Yi-nong
Research purposes : The methods for recognition and evaluation of landslide risk factors were researched by taking one landside as example and the main influence factors for the stability of one landslide were analyzed by using subjective evaluation method and fuzzy comprehensive evaluation method to find out the main factors that have the biggest influence on the target. According to the influence degree ,the risk factors were sorted to evaluate the risk factors, and the countermeasures for control of the risk were presented for providing the reference to the similar works.
Research conclusions : The constructions of railway and highway, large -scale blasting,disordered mining and freely drainage and seepage of the water by residents were the main risk factors for the landslide. The size of the landslide was not well known and the most unfavorable sliding surface was not found ; The engineering measures were not taken perfectly. The risk of the landslide of the railway subgrade in the landsliding area along with the entire landslide was recognized as high risk level. According to the main risk factors of the landslide risk, the countermeasures of using anti -sliding pile,slope protection,building the ring intercepting ditch and filling the tension crack by clay soil were taken to ensure the safety of railway subgrade in the landsliding area.
2013 Vol. 30 (7): 95-99 [
Abstract
] (
3500
)
HTML
(1 KB)
PDF
(890 KB) (
156
)
100
Research on Metro Risk Management Under Construction General Contracting Mode
ZHAO Qing-wu
Research purposes: With more and more cities adopting the construction general contracting mode to build metro, the contractor has a wide market. However ,there is a little researching document on the metro risk management under the construction general contracting mode. This paper analyzes the management features and risk features of the metro under construction general contracting mode,and presents the thinking and methods for the metro risk management under construction general contracting mode for providing the reference to the metro risk management under construction general contracting mode and enhancing the management level and ability of the metro construction under general contracting mode.
Research conclusions : ( 1) There are lots of uncertain factors that influence the target of the general contracting during the construction because of the features of the metro construction under the general contracting mode. The risk features of the general contracting, as the basis of the risk management, decide the risk management thinking and the way for dealing with the risk. (2) The IATM was built, the standards for the risk management were worked out and the risk management procedure was normed for providing a complete set of methods and procedures for the risk management to realize the looped risk management. (3) The risk monitoring and control systems were built to urge the corresponding departments to monitor and control the risks,adjust the risk countermeasures and the key emphasis in work according to the risk level, and focus on the prevention and control of the main risks for effectively controlling the risks. (4) The risk management is an important part of the project management. Strengthening the metro risk management under construction general contracting mode is very important to enhance the project management benefit and the management level of metro construction in China.
2013 Vol. 30 (7): 100-105 [
Abstract
] (
2695
)
HTML
(1 KB)
PDF
(1094 KB) (
267
)
106
Research on Change Plan and Pushing on Strategy for Tbilisi Ring Railway Project
TIAN Guang-wen
Research purposes: The overseas project under EPC contract needs the big investment and faces the high project risk, but it still has the free space for avoiding the investment and project risks. In this paper, the research is done on the overall design,the specific engineering solutions,the change plan and the pushing on strategy of the Tbilisi ring railway project in order to achieve the goals of controlling project investment, getting the maximum economic benefits and realizing win - win.
Research conclusions : (1) The more attention should be paid to the technical characteristics of EPC project and the particularity of total price contract. The requirements of the owner and contract should be met with small cost. (2) The design scheme should broadly consider the interests and benefits of the project and the interests of all parties involved should be taken into account,especially the contractor. In addition,the technology,risk and investment control should be balanced. (3 ) The good strategy should be used to push on the change plan step by step and from easy area to difficult area on full consideration of the concerns of the owner and supervisor to persuade them to understand and accept the design scheme that is favorable for the all parties. (4) This research result can be as the reference to the similar works.
2013 Vol. 30 (7): 106-110 [
Abstract
] (
3201
)
HTML
(1 KB)
PDF
(933 KB) (
161
)
111
Study on the Difficulties in Executing Overseas EPC Projects of Chinese Engineering Enterprises
WANG Qi-qi
Research purposes: In recent years, the Chinese engineering enterprises have met great difficulties and earned painful lessons in executing EPC projects in Saudi Arabia,Indonesia, Poland,Australia,Turkey,Guinea and other countries. Talking about the reasons, there are factors of country differences and lacking of experiences in some specific markets, but what's more important is the lacking of accurate understanding and clear thinking about the construction mode of the overseas EPC projects which results in an incapability of catching good opportunities in project implementation and courses the enterprise sinking in the unfavorable situation deeper and deeper, eventually leads to huge losses. In this paper, the author tries to illustrate this question from the angle of project management theory. Combining the actual situation of Chinese engineering enterprises ' overseas business,and based on her working experience and long - term research of Chinese enterprises′overseas EPC projects, the author puts forward some ideas for solution and advices for reference in controlling the EPC projects′ risks effectively.
Research conclusions : ( 1) Analyze the market environment objectively,recognize the substance of EPC product and establish the objective of localization so as to promote the transformation of economic business from internal - oriented mode to export 一 oriented mode; (2 ) Analyze the production factors of EPC product carefully,understand and master these resources so as to complete the transformation of role from a contractor to an integrator; (3) Grasp the key processes, and stick to the " design - led" and " contract - based" principle so as to achieve the target that the implementation risks of EPC projects are controllable. (4) These research results can be applied to preliminary decision — making, project management and other works of large - scale overseas EPC projects in fields such as transportation construction, electric power construction, petrifaction and chemical engineering, mining development, etc.
2013 Vol. 30 (7): 111-115 [
Abstract
] (
2680
)
HTML
(1 KB)
PDF
(934 KB) (
515
)