Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "[U25]":
107
WANG Zheng
PRELIMINARY ANALYSES ON DESIGN OF VRV SYSTEM IN TECHNO-LOGICAL AIR-CONDITIONING AND ITS OPERATION SITUATION
Journal of Railway Engineering Society 1999 Vol.16 (4): 107-109 [
Abstract
] (
2461
) 1 [
HTML
1 KB] [
PDF
175 KB] (
210
)
110
ZHANG Li-juan
DESIN OF HEAT EXCHANGE STATION FOR CENTRALIZED HEAT SUPPLY OF DAMINGGONG RESIDENTIAL DISTRICT BUILT BY XI’AN RAILWAY SUB-ADMINISTRATION
Journal of Railway Engineering Society 1999 Vol.16 (4): 110-113 [
Abstract
] (
2483
) 1 [
HTML
1 KB] [
PDF
219 KB] (
182
)
114
LU Xiu-ying
EXPLORATION ON SELECTION OF MATERIALS FOR RAILWAY BAL?LAST
Journal of Railway Engineering Society 1999 Vol.16 (4): 114-122 [
Abstract
] (
2555
) 1 [
HTML
1 KB] [
PDF
350 KB] (
165
)
123
PEI Sheng-yan,LI Yan-long
CONSTRUCTION OF ROADBED BY FILLING ROADBED WITH FINE SAND
Journal of Railway Engineering Society 1999 Vol.16 (4): 123-126 [
Abstract
] (
2522
) 1 [
HTML
1 KB] [
PDF
210 KB] (
115
)
127
LIU Yan-xiang,WEI Yi-qing,YANG Ping
COMPREHENSIVE BUSINESS BUILDING OF NATIONAL TEXATION BUREAU OF SHANXI PROVINCE
Journal of Railway Engineering Society 1999 Vol.16 (4): 127-130 [
Abstract
] (
2541
) 1 [
HTML
1 KB] [
PDF
196 KB] (
115
)
1
LI Ben-shen
REVIEW AND PROSPECT ON CONSTRUCTION OF CHUAN-HAN RAILWAY AND XIANG-YU RAILWAY
Journal of Railway Engineering Society 1999 Vol.16 (3): 1-4 [
Abstract
] (
2478
) 1 [
HTML
1 KB] [
PDF
207 KB] (
174
)
5
ZHENG Yi
SUBURBAN RAILWAY-A NECESSARY PART TO THE BEIJING MASS TRANSIT
Journal of Railway Engineering Society 1999 Vol.16 (3): 5-7 [
Abstract
] (
2448
) 1 [
HTML
1 KB] [
PDF
208 KB] (
130
)
8
LUI Ji-lu
ELEMENTARY OPINION ON CONSTRUCTION OF HU-YU EXTRA- LONG RAILWAY PASSAGE ALONG YANGTZE RIVER
Journal of Railway Engineering Society 1999 Vol.16 (3): 8-11 [
Abstract
] (
2442
) 1 [
HTML
1 KB] [
PDF
228 KB] (
127
)
12
XU Bao-cheng
EXPLORATION ON ACCURACY OF CLOSURE DURING LOCING
Journal of Railway Engineering Society 1999 Vol.16 (3): 12-15 [
Abstract
] (
2498
) 1 [
HTML
1 KB] [
PDF
177 KB] (
85
)
16
ZHANG Yan
TENTATIVE IDEAS ON MAINTENANCE SYSTEM OF HIGH SPEED ELECTRIC MOTOR TRAIN UNIT IN CHINA
Journal of Railway Engineering Society 1999 Vol.16 (3): 16-19 [
Abstract
] (
2551
) 1 [
HTML
1 KB] [
PDF
230 KB] (
145
)
20
ZHAO YU-Cheng
PRACTICES ON ELEVATED LONG-SPAN BRIDGE AND JOINTLESS WELDED RAIL FOR URBAN RAIL COMMUNICATON
Journal of Railway Engineering Society 1999 Vol.16 (3): 20-25 [
Abstract
] (
2491
) 1 [
HTML
1 KB] [
PDF
344 KB] (
120
)
26
Ll Fang-zhi,JI Wen-yu,XU Ke-bin
CHOICE OF CALCULATION METHOD OF LIMIT BEARING CAPACITY FOR RAILWAY BRIDGE PIER AND ABUTMENT
Journal of Railway Engineering Society 1999 Vol.16 (3): 26-29 [
Abstract
] (
2553
) 1 [
HTML
1 KB] [
PDF
196 KB] (
95
)
30
LUO Qiang, CAI Ying
STUDY ON TECHNOLOGICAL TREATMENT METHODS OF HIGH SPEED RAILWAY BRIDGE—SUBGRADE TRANSITION
Journal of Railway Engineering Society 1999 Vol.16 (3): 30-33 [
Abstract
] (
2445
) 1 [
HTML
1 KB] [
PDF
248 KB] (
57
)
34
HUANG Wu
CONSTRUCTION TECHNIQUE OF STEEL STRUCTURE FOR LONGSPAN STEEL PIPE CONCRETE ARCH RAILWAY BRIDGE
Journal of Railway Engineering Society 1999 Vol.16 (3): 34-38 [
Abstract
] (
4774
) 1 [
HTML
1 KB] [
PDF
214 KB] (
120
)
39
LU Jian-zhong
CONSTRUCTION OF STIFFENING PRESTRESSED CONCRETE CONTINUOUS BEAM WITH TIE BAR ARCH OF NET WEB MEMBERS
Journal of Railway Engineering Society 1999 Vol.16 (3): 39-42 [
Abstract
] (
4768
) 1 [
HTML
1 KB] [
PDF
204 KB] (
121
)
43
GUO Sheng-zhen
ELEMENTARY TALKING ABOUT JOINTLESS TRACK ON BRIDGE
Journal of Railway Engineering Society 1999 Vol.16 (3): 43-44 [
Abstract
] (
2512
) 1 [
HTML
1 KB] [
PDF
128 KB] (
136
)
45
WANG Shou-ren
TALK ABOUT TUNNEL SLIDE FROM DIFFERENT ASPECTS
Journal of Railway Engineering Society 1999 Vol.16 (3): 45-51 [
Abstract
] (
2527
) 1 [
HTML
1 KB] [
PDF
326 KB] (
113
)
52
Ze-min,YANC Li-zhong
STUDY ON PREDICTION OF SURROUNDING ROCK PERMEABILITY FOR DEEP-LYING TUNNEL——CURRENT SITUATION AND PROSPECTXU
Journal of Railway Engineering Society 1999 Vol.16 (3): 52-55 [
Abstract
] (
2446
) 1 [
HTML
1 KB] [
PDF
235 KB] (
118
)
56
ZHANG Min-qing
TECHNOLOGY OF STRUCTURAL WATERPROOFING-DRAINAGE AND TREATMENT OF SEEPAGE WATER FOR TUNNEL
Journal of Railway Engineering Society 1999 Vol.16 (3): 56-64 [
Abstract
] (
4744
) 1 [
HTML
1 KB] [
PDF
376 KB] (
185
)
65
YANG Bao-chong
APPLICATION OF WET SHOTCRETE FOR TUNNEL
Journal of Railway Engineering Society 1999 Vol.16 (3): 65-67 [
Abstract
] (
2507
) 1 [
HTML
1 KB] [
PDF
133 KB] (
135
)
68
ZAN Yue-wen
SURROUNDING ROCK BY OF I LINE OF TUNNEL IN CONSOLIDATION TECHNIQUE GROUTING DURING CONSTRUCTION CREEP STRATUM
Journal of Railway Engineering Society 1999 Vol.16 (3): 68-72 [
Abstract
] (
2491
) 1 [
HTML
1 KB] [
PDF
267 KB] (
66
)
73
WANG Ying-xue,WANG Jian-yu
BLOCK APPERING POSSIBILITY AND STABILITY ANALYSIS ON CONSIDERING OF THE DIMENSION OF BLOCK
Journal of Railway Engineering Society 1999 Vol.16 (3): 73-77 [
Abstract
] (
2540
) 1 [
HTML
1 KB] [
PDF
224 KB] (
73
)
78
WEI Guo-an
APPLICATION OF SARMA METHOD ON STABILITY ANALYSIS OF LANDSLIDE AT LAONIUPO ON XI7AN-NANJING RAILWAY LINE
Journal of Railway Engineering Society 1999 Vol.16 (3): 78-81 [
Abstract
] (
2558
) 1 [
HTML
1 KB] [
PDF
225 KB] (
184
)
82
LUO Bin,HU Hou-tian,Lu Xiao-ping
STUDY ON CUTTING SLOPE SURFACE EROSION OF GRANITE ELUVIUM IN THE SOUTH OF CHINA
Journal of Railway Engineering Society 1999 Vol.16 (3): 82-85 [
Abstract
] (
2498
) 1 [
HTML
1 KB] [
PDF
269 KB] (
185
)
86
LI Ya-nan
EXPLORATION ON COMPOSITE CAPACITY OF XI’AN TERMINAL
Journal of Railway Engineering Society 1999 Vol.16 (3): 86-90 [
Abstract
] (
2456
) 1 [
HTML
1 KB] [
PDF
272 KB] (
101
)
91
ZHANG Xiong
DESIGN FEATURES OF GENERAL LAYOUT FOR SUBWAY CAR DEPOT AND ITS OPTIMIZATION
Journal of Railway Engineering Society 1999 Vol.16 (3): 91-94 [
Abstract
] (
2503
) 1 [
HTML
1 KB] [
PDF
241 KB] (
209
)
95
WU Cai-lan
TALK ABOUT DESIGN SCHEME TO LEAD JING HU HIGHSPEED RAILWAY INTO TIANJIN TERMINAL COMBINED WITH RAILWAY PLANNING IN JING-JIN-QIN REGION
Journal of Railway Engineering Society 1999 Vol.16 (3): 95-98 [
Abstract
] (
2534
) 1 [
HTML
1 KB] [
PDF
205 KB] (
140
)
99
ZHANG Han
INFLUENCE OF COMPUTER’S DEFECT CONCERNED WITH THE YEAR 2000 AND ITS COUNTERMEASURES
Journal of Railway Engineering Society 1999 Vol.16 (3): 99-102 [
Abstract
] (
2468
) 1 [
HTML
1 KB] [
PDF
228 KB] (
120
)
103
HUA Ling
BUILDING OF TMN FOR THE 11TH ENGINEERING CONSTRUCTION GROUP
Journal of Railway Engineering Society 1999 Vol.16 (3): 103-105 [
Abstract
] (
2627
) 1 [
HTML
1 KB] [
PDF
130 KB] (
94
)
106
ZHAO Hui-bing
STUDY ON THE LAW OF PROBABILITY STATISTICS FOR OVER?EXCAVATING AND UNDER-EXCAVATING DURING CONSTRUCTION OF TUNNEL BY DRILLING AND BLASTING METHOD
Journal of Railway Engineering Society 1999 Vol.16 (3): 106-110 [
Abstract
] (
2493
) 1 [
HTML
1 KB] [
PDF
247 KB] (
184
)
First page
|
Prev page
|
Next page
|
Last page
Page 113 of 117, 3488 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech