Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U455. 4":
105 ZHU Chun-lei
  The Influence of High Pressure Aquifer on Construction of Hangzhou Subway and Its Countermeasures
    Journal of Railway Engineering Society   2014 Vol.31 (7): 105-109 [Abstract] (2967) 1 [HTML 1 KB] [PDF 2704 KB] (422)
86 ZHOU Cheng1,WANG Cheng - shan2,LI Yong - jun,GUO Pu
  Underground Barriers Clean - up Technology for Subway Shield Tunnelling Based on Ground Frozen Method
    Journal of Railway Engineering Society   2013 Vol.30 (3): 86-90 [Abstract] (2743) 1 [HTML 1 KB] [PDF 834 KB] (119)
104 YOU Long - fei,WANG Xiao - wen,GONG Yan - feng,SUN Chun - guang,CHEN Li - bao,YE Chao
  Research on Pretreatment Approach of Foundation for Shield Under - passing Newly - built Railway Station
    Journal of Railway Engineering Society   2012 Vol.29 (6): 104-108 [Abstract] (2591) 1 [HTML 1 KB] [PDF 874 KB] (413)
57 ZHUO Yi,WANG Fei
  Research on Intelligent Diagnosis Methods of A Hybrid Girder Cable - stayed Bridge Based on Artificial Neural Networks
    Journal of Railway Engineering Society   2011 Vol.28 (12): 57-63 [Abstract] (2633) 1 [HTML 1 KB] [PDF 842 KB] (426)
98 KOU Xiao - qiang,YANG Jing - fang,YE Guo - liang,CAO Yong - hua
  Study on Reinforcement Effect of Shield Tunnel Adjacent to Existing Pile Foundation with Churning Pile
    Journal of Railway Engineering Society   2011 Vol.28 (11): 98-103 [Abstract] (2545) 1 [HTML 1 KB] [PDF 1831 KB] (234)
124 HU Shuang - ping
  Structural Calculation and Analysis of Transfer Node of Three - line Transfer Station
    Journal of Railway Engineering Society   2011 Vol.28 (10): 124-128 [Abstract] (2572) 1 [HTML 1 KB] [PDF 1061 KB] (526)
94 DING Lie - yun,LI Wei - ming,CHEN Xiao - yang
  Numerical Simulation Calculation and Field Data Monitoring Analysis for Start Section of Shield Construction of Wuhan Metro
    Journal of Railway Engineering Society   2011 Vol.28 (3): 94-99 [Abstract] (2681) 1 [HTML 1 KB] [PDF 1703 KB] (269)
86 LUO Han- bin, LIWe i- m ing, ZHOU Guang- hui
  Analysis of Ground Settlement Caused by Shield Construction ofWuhan Metro with Non- equal Intervalmodel
    Journal of Railway Engineering Society   2011 Vol.28 (1): 86-91 [Abstract] (2756) 1 [HTML 1 KB] [PDF 420 KB] (215)
82 WANG Hui, ZHU Wei-bin, LI Da-yong
  Construction Method and Control Measure for Connecting Passage inWater-enriched Sand Bed
    Journal of Railway Engineering Society   2010 Vol.27 (9): 82-87 [Abstract] (2578) 1 [HTML 1 KB] [PDF 447 KB] (416)
55 PENG Feng,LIU Guang—jun
  Research on Sleeve—valve—pipe Grouting Technology for Reinforcing the Pearl River Dam Underpassed by Shiziyang Tunnel
    Journal of Railway Engineering Society   2010 Vol.27 (7): 55-59 [Abstract] (2592) 1 [HTML 1 KB] [PDF 362 KB] (174)
60 CHEN Zhl.YU Hua—wei
  Prevention of Through Crack in Secondary Lining of Railway Mountain Tunnel
    Journal of Railway Engineering Society   2010 Vol.27 (7): 60-63 [Abstract] (2579) 1 [HTML 1 KB] [PDF 118 KB] (258)
70 ZHANG Ying-cai
  Technology for Construction of Hanguguan Tunnel Under-passing New Loess Gulch
    Journal of Railway Engineering Society   2010 Vol.27 (6): 70-73 [Abstract] (2572) 1 [HTML 1 KB] [PDF 339 KB] (110)
56 FANG Yong, HE Chuan
  Numerical Analysis of Earth-pressure-balance Shield Driving Considering Based on Construction Course
    Journal of Railway Engineering Society   2009 Vol.26 (11): 56-60 [Abstract] (2529) 1 [HTML 1 KB] [PDF 555 KB] (118)
66 WANG Shu-guo,ZHANG Min-qing,HUANG Hong-jian,CHEN Wei-yuan,YIN Huai-lian
  Construction Technology of the High Pressure and Enriched Water Fault F1 in Bieyancao Tunnel on Yichang-Wanzhou Railway
    Journal of Railway Engineering Society   2008 Vol.25 (9): 66-70 [Abstract] (2557) 1 [HTML 1 KB] [PDF 438 KB] (192)
76 WU Bo
  Research on the Construction Technology for Excavation of Metro Tunnel Crossing Bridge and River
    Journal of Railway Engineering Society   2008 Vol.25 (5): 76-79 [Abstract] (2537) 1 [HTML 1 KB] [PDF 391 KB] (179)
58 LI Hong-xia
  Research on the Construction Scheme of Horizontally Approaching Excavation Shield Tunnel
    Journal of Railway Engineering Society   2007 Vol.24 (10): 58-61 [Abstract] (2540) 1 [HTML 1 KB] [PDF 384 KB] (177)
First page | Prev page | Next page | Last pagePage 1 of 1, 16 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech