关闭×
Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
2005 Vol. 22, No. 3
Published: 2005-03-15
1
PROMOTE CONSTRUCTION OF GENERAL LEGAL ADVISOR INSTITUTION, TAKE COUNTERMEASURES FOR PREVENTION OF LEGAL RISK
LI Jian-sheng
On base of practical construction of general legal advisor institution by Chinese Railway Engineering Corporation, this paper describes the key links that the construction of general legal advisor institution for enterprise must be implemented, affirms the role of general legal advisor institution for enterprise in prevention of legal risk in enterprise's business, analyses the problems in construction of the institution and proposes suggestions.
2005 Vol. 22 (3): 1-4 [
Abstract
] (
2543
)
HTML
(1 KB)
PDF
(384 KB) (
77
)
5
REINFORCING CONSTRUCTION OF JOBBING LEVEL IS A TASK OF TOP PRIORITY FOR SUSTAINABLE DEVELOPMENT OF CONSTRUCTION GENERAL CONTRACTOR ENTERPRISE
LIU Di-sheng
Separating jobbing level from management layer is an inexorable trend for large-sized construction enterprise to conform to the international practice and increase its international competition ability. Nowadays, the member enterprises of Chinese Railway Engineering Corporation are trying to do it and pacing forward. As management level and jobbing level are independent each other in economy and they are an organic and integral part in function, we should seriously consider the following issues, how to separate, breed, construct, manage and use jobbing level. I think this paper has some reference value to these issues.
2005 Vol. 22 (3): 5-6 [
Abstract
] (
2481
)
HTML
(1 KB)
PDF
(300 KB) (
116
)
7
RESEARCH ON APPLICATION OF BOOSTING SYSTEM IN RAILWAY CONSTRUCTION PROJECT
SUN Yu-guo, LIU Cheng-jun
This paper analyses the boosting system applied in one railway construction project, sums up the features of the boosting system shown in different construction stages, describes the boosting system from points of management science view, presents the applied principle and method of boosting system in construction project, for reference to similar construction project.
2005 Vol. 22 (3): 7-11 [
Abstract
] (
2546
)
HTML
(1 KB)
PDF
(447 KB) (
123
)
12
THE MANAGEMENT SYSTEM OF CONSTRUCTION MARKET IN HONGKONG
LIU Gui-ming
This paper briefly introduces the management system of construction field in HongKong, government's supervision and examination to the construction enterprise and several management measures in the process of construction, for the reference of the counterparts who engage in the international construction market.
2005 Vol. 22 (3): 12-14 [
Abstract
] (
2536
)
HTML
(1 KB)
PDF
(351 KB) (
125
)
15
MARKET COMPETITION OF STATE -OWNED CONSTRUCTION ENTERPRISE AND IMPROVEMENT OF EMPLOYEE'S QUALITY
MA Ren-zhao
Under condition of serious competition in construction market, the employee's composition and quality determine survival and development of construction enterprise owing to its particularity of the industry. In a word, market competition is the competition of talents with knowledge of new technology and competition of education and training of employees. In order to make employee's ability matching to the current or expected position and increase the achievement and efficiency of employee, the employee's quality has to be improved continuously by training. This is an important thing to be done for scientific management.
2005 Vol. 22 (3): 15-18 [
Abstract
] (
2537
)
HTML
(1 KB)
PDF
(384 KB) (
151
)
19
ANALYSIS OF CONSTRUCTION COST CONTROL DURING ENTIRE PROCESS OF CONSTRUCTION
CHEN Wei-yu
Construction cost should be kept under control during entire process of construction and has closed relation with every phase of construction. This paper analyses the control method for construction cost in every phase of construction, such as investment decision, design, tending and bidding for project, construction and acceptance from point of entire process' view of construction puts forward the issues that should paid attention to during construction, shows the importance of scientific management of construction cost to lower construction cost by giving a practical example.
2005 Vol. 22 (3): 19-23 [
Abstract
] (
2478
)
HTML
(1 KB)
PDF
(499 KB) (
774
)
24
ANALYSIS OF "SEPARATING SECONDARY LINES OF BUSINESS FROM” CORE BUSINESS AND TURNING SECONDARY LINES INTO INDEPENDENT COMPANIES" BY STATE -OWNED LARGE AND MEDIUM CONSTRUCTION ENTERPRIES
HE Qiao-wei
On the base of describing the police background of "separating secondary lines of business from core business and turning secondary lines into independent companies' for state-owned large and medium construction enterprise, this paper analyses the importance and necessity of "separating secondary lines of business from core business and turning secondary lines into independent companies' ,presents several links and factors which should be paid attention to in execution of this policy, for reference to such work done by other enterprise.
2005 Vol. 22 (3): 24-28 [
Abstract
] (
2517
)
HTML
(1 KB)
PDF
(448 KB) (
163
)
29
EXPLORATION ON WORK OF ENGINEERING CLAIM
WANG Zhong-zhen
With the development advancing by leaps and bounds of our country's construction , the keen competition of the construction market is more and more fiery; the construction project is more and more complicated and unavoidable project claim incidents are more and more too. How to do a good job of claim, this paper expresses the author's ideas on the claim work in order to get suitable claim by construction enterprise, in combination with practice of engineering claim for many years.
2005 Vol. 22 (3): 29-31 [
Abstract
] (
2569
)
HTML
(1 KB)
PDF
(342 KB) (
162
)
32
THINIKNG ON PROMOTION OF SUPPLEMENTARY MEDICAL INSURANCE BY ENTERPRISE
WANG Zheng-qin
Most enterprises of our company's system participated in the local basic medical insurance according to the possession principle at present. But under the principle of "low-level and wide participation", the medical cost paid by employees is still overburdened, which is unfavorable to stabilize the staff and workers ranks. Therefore it is necessary for enterprise to establish the supplementary medical insurance to solve these problems. This paper analyses from setting up such many aspects as the perfection of supplementary medical insurance, etc., thus setting up the methods and measures of supplementary medical insurance and forming a comparatively intact system to really reach and promote enterprise's health care reform, removing worker's medical worry, stabilizing staff and workers ranks and playing positive roles in the works of taking man as foundation, building harmonious enterprises, strengthening cohesive force in enterprise and advancing development of enterprise.
2005 Vol. 22 (3): 32-34 [
Abstract
] (
2522
)
HTML
(1 KB)
PDF
(375 KB) (
266
)
35
DISCUSSION ON ALLOCATION SCALE AND CONSTRUCTION WAY OF CAR DEPOT FOR URBAN MASS TRANSIT
MIAO Dong
This paper analyses the functions and allocation requirements for car depot and comprehensive base for urban mass transit , puts forward six key points for allocation scale and construction way of car depot through further discussion on functions of car depot and repair system in China
2005 Vol. 22 (3): 35-38 [
Abstract
] (
2507
)
HTML
(1 KB)
PDF
(358 KB) (
468
)
39
ANALYSIS OF ENVIRONMENT PROTECTIVE URBAN MASS TRANSIT
WANG Yong-dong
Based on analysis of development prospect, environment situation, main kinds of pollution of urban mass transit in China and its features and mechanism as well as influence factors, this paper proposes the measures for overall treating environment pollution from three aspects of planning, construction and operation in order to realize environment protective urban mass transit.
2005 Vol. 22 (3): 39-41 [
Abstract
] (
2546
)
HTML
(1 KB)
PDF
(307 KB) (
168
)
42
RESEARCH ON APPLICATION OF STRESSED HIGH STRENGTH CONCRETE PIPE PILE UNDER COMPLEX GEOLOGICAL CONDITION
ZHANG Zhong-xian 1, ZHAO Chun-hua2, ZHANG Jie1
This paper gives an introduction to the geological condition on site, design, technical requirements for construction and monitoring method for PHC pile based on an example of a large PHC pile construction project under complex geological condition, analyses the technical features of PHC pile and main measures taken in construction.
2005 Vol. 22 (3): 42-46 [
Abstract
] (
2591
)
HTML
(1 KB)
PDF
(370 KB) (
89
)
47
ANALYSIS OF INFLUENCE ON POST-CONSTRUCTION SETTLEMENT OF EXISTING EMBANIKMENT BY FILLING NEWLY WIDENED SUBGRADE
ZHENG Ming-hui, CAO Xiao-lin, YUAN Ming
Based on the crack change and settlement monitoring result of one embankment, this paper gives a conclusion that crack occurring to existing embankment is caused by unbalanced settlements between old embankment and new embankment owing to the outside force during filling newly widened subgrade in combination with theoretic analysis, proposes the suggestion that two aspects, namely materials and depth of subgrade treatment and reinforcing embankment body, should be considered for treatment of connection between new subgrade and old subgrade, for providing the basis for taking measures to avoid the crack of embankment and disaster of subgrade.
2005 Vol. 22 (3): 47-49 [
Abstract
] (
2434
)
HTML
(1 KB)
PDF
(300 KB) (
166
)
50
DISCUSSION ON PREVENTION OF SIDE SLOPE SLIDE OF POROUS EARTH EMBANKMENT
WANG Tian-yi
Combining with the author's experience, this paper analyses the causes for the slide according to the characteristics of porous earth embankment and proposes two ways for prevention of slide, namely moving weak section into safe section and moving interface out, for reference to similar work.
2005 Vol. 22 (3): 50-52 [
Abstract
] (
2505
)
HTML
(1 KB)
PDF
(199 KB) (
80
)
53
EXPERIMENTAL RESEARCH ON IMPROVING SURFACE QUALITY OF CONCRETE PIER
LI Gu-hua,LIN Jia-rui
In combination with the lab experimental result of concrete test-piece, this paper analyses the mechanism for forming surface defect of concrete, puts forward the measures for prevention of surface defect of concrete. The surface quality of concrete has been improved greatly by adopting these measures in construction of bridge pier.
2005 Vol. 22 (3): 53-57 [
Abstract
] (
2553
)
HTML
(1 KB)
PDF
(444 KB) (
85
)
58
ANALYSIS OF COMMON PROBLEMS IN SURVEY AND DESIGN OF BRIDGE AND CULVERT BY THE QINHUANGDAO- SHENYANG RAILWAY LINE
SHI Li-xia
Some problems occur during construction of railway bridges and culverts. Based on the discussion of the problems, this paper analyses the causes for the problems, puts forward the measures for avoiding such problems occurring in future survey and design of bridge and culvert.
2005 Vol. 22 (3): 58-60 [
Abstract
] (
2563
)
HTML
(1 KB)
PDF
(339 KB) (
159
)
61
COMMENTS ON RAPID CONSTRUCTION OF SUBMARINE TUNNEL FOR XIAMEN EAST CORRIDOR
FAN Heng-xiu, HAO Xiao-su
This paper analyses the division of engineering section, arrangement of construction schedule and service for rapid construction of submarine tunnel from strategy, presents the roles in rapid construction of submarine tunnel by adopting key techniques for advanced geological forecast, treatment of weathered trough, water proofing and air ventilation from tactics.
2005 Vol. 22 (3): 61-64 [
Abstract
] (
2548
)
HTML
(1 KB)
PDF
(344 KB) (
71
)
65
THE CONSTRUCTION TECHNOLOGY OF KARST TUNNEL
LUO Qiong
It is unusually difficult for the karst tunnel to construct, because its project geology and hydrogeology are complicated and special. Based on the construction of Yuanliang Mountain tunnel on Yuhuai railway, the author researches on the solutions of tunnel karst, karst water and the construction technology of the karst tunnel with high pressure and abundant water.
2005 Vol. 22 (3): 65-71 [
Abstract
] (
2563
)
HTML
(1 KB)
PDF
(563 KB) (
192
)
72
COMMENTS ON DIFFERENCES BETWEEN KASTNER FORMULA AND FENNER FORMULA USED FOR PLASTIC ROCK (SOFT ROCK)
FU Hua-xing
This paper describes the differences in expression form between Kaster formula and Fenner formula popularly used for plastic rock (soft rock), deviates their same points by taking stress circle as media and change tactics, expresses their same points in application by giving practical example in order to assist application of formulas in difficult construction project.
2005 Vol. 22 (3): 72-74 [
Abstract
] (
2570
)
HTML
(1 KB)
PDF
(251 KB) (
129
)
75
PREDICTION TECHNOLOGY FOR WATER GUSHING AND ARISING IN DEEP BURIED LARGE TUNNEL
YANG Hui- jun
Simulation calculation was made to the volume of water gushing in typical section of down line in Xinqidaoliang Tunnel by adopting methods of water dynamics, water equilibrium, water runoff and water analysis. It is found the methods of analysis and water runoff were suitable for calculation of volume of water gushing in this section, but the predicted volume of water gushing was overlarge by adopting methods of water equilibrium and water dynamics. Numerical simulation is a good way to simulate and predict the volume of underground water, which can predict the seepage characteristics of underground water.
2005 Vol. 22 (3): 75-78 [
Abstract
] (
2489
)
HTML
(1 KB)
PDF
(343 KB) (
128
)
79
EARLY DETERMINATION OF INFLUENCING FACTOR AND ITS COEFFICIENT OF DIFF'USION ON PERMEABILITY OF CHLORINE ION OF MARINE DURABLE CONCRETE
YAO Jian-wen,LI Xue-min, SU Wan, WANG Yu-feng
A large-sized construction of durable concrete is seldom applied in China, so it is not understood well what influences are made on durable concrete by all influencing factors. The research on influences on durability is made by adopting orthogonal design method, which has positive significance to guiding design of fitting ratio and control of construction quality.
2005 Vol. 22 (3): 79-84 [
Abstract
] (
2498
)
HTML
(1 KB)
PDF
(389 KB) (
135
)
85
APPLICATION OF PRESTRESSED ANCHOR ROD IN PROTECTION OF RAILWAY SIDE SLOPE
YANG Xin-ping
The construction technique of prestressed anchor rod has been applied widely in railway engineering in recent years. Based on analysis of effective mechanism of anchor rod on reinforcing various soil, this paper gives an introduction to construction technique of prestressed anchor rod and its precautions in construction in combination with the construction practice in section between Longchuang-Dongwan on double-line of Beijing- Kowloon, sums up the experience of construction, for reference to similar construction.
2005 Vol. 22 (3): 85-89 [
Abstract
] (
2546
)
HTML
(1 KB)
PDF
(423 KB) (
212
)
90
DESIGN AND ANALYSIS ON THE ELECTRIFICATION TRACTION SUBSTATION OF HONGKONG WEST RAIL
LI Ji-sheng
This article introduces the overview of the electrification power supply system of Hongkong West Rail and the preliminary and secondary connection in traction substation and sectioning post. The author describes the advantages and disadvantages of preliminary connection scheme and secondary connection scheme and also proposes the suggestion of preliminary connection and secondary connection design for electrified traction substation and sectioning post, which can provide some reference to future design of electrification traction substation and sectioning post.
2005 Vol. 22 (3): 90-93 [
Abstract
] (
4878
)
HTML
(1 KB)
PDF
(255 KB) (
521
)
94
POWER,PROTECTION AND EARTHING OF OVERALL WIRING SYSTEM AND INTELLIGENT BUILDING
LIU Wei-dong
Safety is the most important point for intelligent building. The safety here does not refer to the encroachment by man, but refers to the building itself and whether the power, protection and earthing of overall wiring are correct or not. Therefore, the overall protective measures have been taken for intelligent building and power, protection and earthing of overall wiring. The methods are proposed for selection of power, protection and earthing.
2005 Vol. 22 (3): 94-98 [
Abstract
] (
2537
)
HTML
(1 KB)
PDF
(407 KB) (
128
)
99
COMPOSITION OF STEP -DOWN POWER TRANSFORMATION SYSTEM FOR METRO AND ITS TESTS IN CONSTRUCTION
WANG Meng-xiang
This paper gives an introduction to the composition of step-down power transformation system for metro, characteristics of power feeding system with vary voltages and tests in construction for power transformation system in order to make people having overall ideas about design and tests on site of the system, for assisting construction, tests and safe running of the system.
2005 Vol. 22 (3): 99-102 [
Abstract
] (
2494
)
HTML
(1 KB)
PDF
(282 KB) (
138
)
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech