Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Quick Search  
  Adv Search
2005 Vol. 22, No. 2
Published: 15 February 2005

 
1 APPLICATION OF LONG -DISTANCE CORRDINATE DESIGN IN SURVEY AND DESIGN
ZHENG Zhi-ping
2005 Vol. 22 (2): 1-4 [Abstract] ( 2510 ) HTML (1 KB)  PDF  (371 KB)  ( 114 )
5 EXPLORATION ON DESIGN AND MAINTENANCE WAY OF SUBGRADE AND DRAINAGE FOR NEWLY BUILT STATION ON PASSENGER DEDICATED LINE
JING Li-hong
2005 Vol. 22 (2): 5-7 [Abstract] ( 2574 ) HTML (1 KB)  PDF  (293 KB)  ( 107 )
8 HYDROGEOLOGY PROBLEMS RELATED TO TROUGH VALLEY, KARSTIC WATER AND FLOW IN DESHENGCHANG OF QIYUESHAN TUNNEL
DENG Yi-ming, DU Wen-shan
2005 Vol. 22 (2): 8-11 [Abstract] ( 2511 ) HTML (1 KB)  PDF  (389 KB)  ( 169 )
12 THEORETICAL ANALYSIS AND EXPERIMENTAL RESEARCH ON STABILITY OF BEAM BODY ON RUBBER SEAT
GAO Wei
2005 Vol. 22 (2): 12-15 [Abstract] ( 2525 ) HTML (1 KB)  PDF  (258 KB)  ( 211 )
16 ANALYSIS OF ADVANTAGES AND DISADVANTAGES OF PRESTRESSED CONCRETE CONTINUOUS BOX GIRDER AND STEEL-CONCRETE COMPOSITE GIRDER
YANG Jin-liang
2005 Vol. 22 (2): 16-18 [Abstract] ( 2555 ) HTML (1 KB)  PDF  (300 KB)  ( 170 )
19 THE TECHNOLOGY RESEARCH ON 2 000 t PRECAST BOX BEAM SLIPPAGE TRANSPORTATION FOR DONGHAI BRIDGE
SHEN Yang-yun, ZHENG Ji
2005 Vol. 22 (2): 19-22 [Abstract] ( 2576 ) HTML (1 KB)  PDF  (375 KB)  ( 118 )
23 ANALYSIS OF MEASURED STRESS ON SECTION OF CURVED CONTINUOUS BRIDGE CONSTRUCTED BY JACK-IN METHOD
LI Cheng jun, ZHOU Shi-jun
2005 Vol. 22 (2): 23-26 [Abstract] ( 2543 ) HTML (1 KB)  PDF  (318 KB)  ( 248 )
27 TEMPERATURE AND CRACK CONTROL TECHNOLOGY FOR LARGE -VOLUME CONCRETE IN CONSTRUCTION OF BRIDGE TRESTLE
ZHAO Guo-li
2005 Vol. 22 (2): 27-30 [Abstract] ( 2651 ) HTML (1 KB)  PDF  (329 KB)  ( 222 )
31 CONSTRUCTION TECHNIQUE FOR RAILWAY DOUBLE -TRACK PRECAST JOGGLE REINFORCED CONCRETE TIED ARCH BRIDGE
CAO Xiang-he
2005 Vol. 22 (2): 31-33 [Abstract] ( 2632 ) HTML (1 KB)  PDF  (235 KB)  ( 131 )
34 THEORETICAL AND EXPERIMENTAL STUDY ON THE NATURE FREQUENCY OF EXTERNALLY PRESTRESSED BEAM
ZHANG Yao-ting
2005 Vol. 22 (2): 34-37 [Abstract] ( 2544 ) HTML (1 KB)  PDF  (290 KB)  ( 189 )
38 APPLIED ANALYSIS OF CONSTRUCTION OF UNDERGROUND ENGINEERING BY SHALLOW BURYING SUBSURFACE EXCAVATION METHOD
LIU Hui
2005 Vol. 22 (2): 38-40 [Abstract] ( 2535 ) HTML (1 KB)  PDF  (349 KB)  ( 217 )
41 ANALYSIS OF THE LINING SAFETY OF WUSHAOLING TUNNEL IN F7 FAULT
FAN Heng-xiu,LI Chang-ning
2005 Vol. 22 (2): 41-44 [Abstract] ( 2591 ) HTML (1 KB)  PDF  (321 KB)  ( 156 )
45 SOIL PRESSURE CONTROL FOR EPB SHIELD EXCAVATION
LIU Dong-liang
2005 Vol. 22 (2): 45-50 [Abstract] ( 2551 ) HTML (1 KB)  PDF  (457 KB)  ( 259 )
51 RESEARCH ON TREATMENT MEASURES FOR TBM WORKING IN COLLAPSED SECTION OF SURROUNDING ROCK
YANG Zhi-guo
2005 Vol. 22 (2): 51-54 [Abstract] ( 2549 ) HTML (1 KB)  PDF  (408 KB)  ( 225 )
55 ANALYSIS OF CONSTRUCTION TECHNOLOGY FOR LENGLONGLING TUNNEL PASSING THROUGH SMALL COAL AND MUD-ROCK FLOW AREA
QUAN Xian-min
2005 Vol. 22 (2): 55-57 [Abstract] ( 2601 ) HTML (1 KB)  PDF  (249 KB)  ( 131 )
58 COMMENTS ON TUNNEL CONSTRUCTION OF CHINESE RAILWAY
GUO Shan-yun
2005 Vol. 22 (2): 58-61 [Abstract] ( 2552 ) HTML (1 KB)  PDF  (380 KB)  ( 239 )
62 EXPLORATION ON WAY OF DISCRIMINATING EARTHING PHASE BY APPLICATION OF VECTORGRAM
LIN Ji
2005 Vol. 22 (2): 62-65 [Abstract] ( 2532 ) HTML (1 KB)  PDF  (253 KB)  ( 159 )
66 FIDIC AND CONSULTING ENGINEER UNDER SITUATION OF GLOBALIZATION
LIU Cheng- jun
2005 Vol. 22 (2): 66-69 [Abstract] ( 2571 ) HTML (1 KB)  PDF  (354 KB)  ( 195 )
70 ANALYSIS OF CONSTRUCTION MARKET OF INFRASTRUCTURE AND INVESTMENT ENVIRONMENT IN TANZANIA AND ZAMBIA
LI Hai-ming
2005 Vol. 22 (2): 70-78 [Abstract] ( 3277 ) HTML (1 KB)  PDF  (820 KB)  ( 909 )
79 THINKING ON REFORM AND DEVELOPMENT OF CONSTRUCTION ENTERPRISE IN CHINA
ZHOU Min-zhong
2005 Vol. 22 (2): 79-83 [Abstract] ( 2557 ) HTML (1 KB)  PDF  (495 KB)  ( 188 )
84 DISCUSSION ON THE CONSTRUCTION QUALITY OF MANAGEMENT FOR LARGE COMPREHENSIVE PROJECT
REN Sai-xing
2005 Vol. 22 (2): 84-90 [Abstract] ( 2582 ) HTML (1 KB)  PDF  (541 KB)  ( 268 )
91 IMPROVING MANAGEMENT LEVEL FOR CONSTRUCTION PROJECT BY APPLICATION OF QUALITY CONTROL SYSTEM
YANG Xin-ping
2005 Vol. 22 (2): 91-92 [Abstract] ( 2568 ) HTML (1 KB)  PDF  (289 KB)  ( 402 )
93 HOW TO GIVE A QUOTATION FOR ENGINEERING VOLUME LIST BY CONSTRUCTION ENTERPRISE
CHEN Wei-yu
2005 Vol. 22 (2): 93-96 [Abstract] ( 2598 ) HTML (1 KB)  PDF  (365 KB)  ( 243 )
97 RESEARCH ON CENTRLFUGAL EXPERIMENT OF RED MUDSTONE EMBANKMENT
LIU Jun-xin, CAO Xin-wen, HU Qi-jun
2005 Vol. 22 (2): 97-99 [Abstract] ( 2565 ) HTML (1 KB)  PDF  (314 KB)  ( 133 )
100 JUDGING APPLICATION OF ARCHITECTURAL COMPOSITION PHILOSOPHY IN ARCHITECTURE DESIGN FROM "WATER CUBE"
YANG Ling
2005 Vol. 22 (2): 100-102 [Abstract] ( 2557 ) HTML (1 KB)  PDF  (301 KB)  ( 142 )
  News
·Notice
More>>  
 
  Download
More>>  
 
  Links
  Beijing JIaotong University
  Journal of Southwest Jiaotong University
  China Association for Science and Technology
  National Library of China National Digital Library of China
  China Railway Society
  China Railway Group Limited
More>>  
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech