Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "[U24]":
20
HAO Ya - dong,XU Jia - dong,ZHANG Yong
Study on Application of Multiple - influence - factor - based Calculation Model in Monitoring Urban Ground Subsidence
Journal of Railway Engineering Society 2011 Vol.28 (3): 20-23 [
Abstract
] (
2566
) 1 [
HTML
1 KB] [
PDF
1323 KB] (
372
)
46
QU Cun,GAO Liang,QIAO Shen - lu,CAI Xiao - pei
Analysis of Influence Factors on CRTSⅠDouble - block Ballastless Track CWR on Long - span Bridge of High - speed Railway
Journal of Railway Engineering Society 2011 Vol.28 (3): 46-51 [
Abstract
] (
2814
) 1 [
HTML
1 KB] [
PDF
1458 KB] (
272
)
52
LIU Bao - long
Research on Construction Technology of Massive V - shape Pier in Water under Slant - leg Combined Supporting
Journal of Railway Engineering Society 2011 Vol.28 (3): 52-57 [
Abstract
] (
2607
) 1 [
HTML
1 KB] [
PDF
1469 KB] (
311
)
58
ZHANG Yun - zhao
Technology of Erecting 64 m Span Steel Truss Girder with Float Tow and Jack - in Method
Journal of Railway Engineering Society 2011 Vol.28 (3): 58-63 [
Abstract
] (
2635
) 1 [
HTML
1 KB] [
PDF
1376 KB] (
223
)
81
ZHANG Xue - yuan
Analysis of Ferro - resonance between Traction Electric Network and Locomotive
Journal of Railway Engineering Society 2011 Vol.28 (3): 81-85 [
Abstract
] (
2529
) 1 [
HTML
1 KB] [
PDF
1535 KB] (
544
)
13
HUANG Tie - lan
Research on Scheme of Leading Huaihua - Shaoyang - Hengyang Railway into Hengyang Terminal
Journal of Railway Engineering Society 2011 Vol.28 (2): 13-15 [
Abstract
] (
2537
) 1 [
HTML
1 KB] [
PDF
282 KB] (
470
)
16
JING Ji - chang,JU Xiao - qiang
Railway Alignment in Section between Xi'an and Shanchuan of Xi'an - Chengdu Passenger Dedicated Line in Daba Mountain Area
Journal of Railway Engineering Society 2011 Vol.28 (2): 16-20 [
Abstract
] (
2587
) 1 [
HTML
1 KB] [
PDF
202 KB] (
58
)
21
ZHANG Xia - Lin,FENG Tao
Application of Fuzzy Comprehensive Evaluation in Railway Alignment
Journal of Railway Engineering Society 2011 Vol.28 (2): 21-26 [
Abstract
] (
2606
) 1 [
HTML
1 KB] [
PDF
368 KB] (
96
)
27
GAO Shan
Study on 3D Visualization Technology and Evaluation Method for Railway Engineering Geological Alignment
Journal of Railway Engineering Society 2011 Vol.28 (2): 27-31 [
Abstract
] (
2609
) 1 [
HTML
1 KB] [
PDF
321 KB] (
164
)
37
HUANG Bo
Features and Practical Examples of Geological Alignment of Guizhou - Guangxi Railway
Journal of Railway Engineering Society 2011 Vol.28 (2): 37-43 [
Abstract
] (
2602
) 1 [
HTML
1 KB] [
PDF
1006 KB] (
136
)
61
ZHANG Hong - ping
Comparative Analysis of the Ballast Track Design Standards of High - speed Railway between China and France
Journal of Railway Engineering Society 2011 Vol.28 (2): 61-64 [
Abstract
] (
3558
) 1 [
HTML
1 KB] [
PDF
203 KB] (
1199
)
65
WANG Wei - hua,LIU Kei - fei,LI Pei - gang
Analysis of Longitudinal Mechanics Behaviour of Ballastless Slab Track on Long Grade Bridge
Journal of Railway Engineering Society 2011 Vol.28 (2): 65-70 [
Abstract
] (
2599
) 1 [
HTML
1 KB] [
PDF
829 KB] (
345
)
71
CHANG Wei - hua
Study on Impact of Lateral Force of Heavy Haul Railway on Rail Overturn
Journal of Railway Engineering Society 2011 Vol.28 (2): 71-73 [
Abstract
] (
2558
) 1 [
HTML
1 KB] [
PDF
245 KB] (
159
)
80
HU Hua - wan,LI Jun,QIANG Shi - zhong
Study on Shear Buckling Property of Corrugated Steel Web PC Combined Box Girder
Journal of Railway Engineering Society 2011 Vol.28 (2): 80-83 [
Abstract
] (
2591
) 1 [
HTML
1 KB] [
PDF
350 KB] (
174
)
1
ZHAO Xiang- qing, YANG Yong- peng, HAN Long- wu, XU B ing- ku,i CHENG Jia
Analysis of Distribution Characteristics of Permafrost along Xiangride -Huashixia Highway in EastQinghai- Tibet P lateau
Journal of Railway Engineering Society 2011 Vol.28 (1): 1-4 [
Abstract
] (
2549
) 1 [
HTML
1 KB] [
PDF
388 KB] (
128
)
5
YAO Yong
Analysis of Spallation Disease of Cutting Slope of Taiyuan—Zhongwei—Yinchuan Railway
Journal of Railway Engineering Society 2011 Vol.28 (1): 5-8 [
Abstract
] (
2624
) 1 [
HTML
1 KB] [
PDF
428 KB] (
187
)
15
ZHANG Xu- feng, LIU Cheng- long, CHEN Shu, ZHENG Zi- tian
Simulating Calculation and Analysis of the Impact of 2CMutualDeviation on Accuracy of CPIII Plane Network
Journal of Railway Engineering Society 2011 Vol.28 (1): 15-19 [
Abstract
] (
2611
) 1 [
HTML
1 KB] [
PDF
1475 KB] (
127
)
20
ZHAOM eng- jie, LIU Cheng- long, WANG Hua- guang, HUANG Zhi- wei
Research and Analysis of Feasibility of Half- face Observation on CPIII PlaneNetwork
Journal of Railway Engineering Society 2011 Vol.28 (1): 20-24 [
Abstract
] (
2589
) 1 [
HTML
1 KB] [
PDF
1259 KB] (
95
)
31
ZHU Zhang- feng, GUO Zheng- xing, LIU L i- jun
Analysis of Structural Performance of ( 90+ 180+ 90) m Continuous Beam and Arch Combined Bridge of Beijing- ShanghaiHigh- speed Railway
Journal of Railway Engineering Society 2011 Vol.28 (1): 31-34 [
Abstract
] (
2596
) 1 [
HTML
1 KB] [
PDF
619 KB] (
206
)
39
ZHANG Jun- wei, MEI Zhi- rong, TANG Yu
Study on TBM Construction and Application of Bolt- shotcrete Support in Construction of LongWater Transfer Tunnel
Journal of Railway Engineering Society 2011 Vol.28 (1): 39-46 [
Abstract
] (
2601
) 1 [
HTML
1 KB] [
PDF
1084 KB] (
199
)
80
ZHU He- yi
Waterproofing Construction Technology for Subsurface- excavated Tunnel of GuangzhouMetro Station
Journal of Railway Engineering Society 2011 Vol.28 (1): 80-85 [
Abstract
] (
2596
) 1 [
HTML
1 KB] [
PDF
796 KB] (
264
)
92
ShiYun-fang
Technological Research of Protection and Treatment for Frequent Quality AccidentofCast-in-situBoredPile
Journal of Railway Engineering Society 2011 Vol.28 (1): 92-95 [
Abstract
] (
2579
) 1 [
HTML
1 KB] [
PDF
208 KB] (
285
)
96
CUI L i- hong
Research on Risk Control of Passenger- dedicated Line Construction Project
Journal of Railway Engineering Society 2011 Vol.28 (1): 96-98 [
Abstract
] (
2587
) 1 [
HTML
1 KB] [
PDF
105 KB] (
201
)
18
WEI Yong—Xing
Longitudinal Section Design on Ballastless Track Subgrade of Passenger Dedicated Railway
Journal of Railway Engineering Society 2010 Vol.27 (12): 18-22 [
Abstract
] (
2638
) 1 [
HTML
1 KB] [
PDF
395 KB] (
149
)
23
LI Ya—hui,SHI De—bin,ZHANG Yun—fang
Overlap Joint of Coordinate System and Design of Track of High—speed Railway
Journal of Railway Engineering Society 2010 Vol.27 (12): 23-26 [
Abstract
] (
2560
) 1 [
HTML
1 KB] [
PDF
350 KB] (
112
)
27
HE Zhan—min,GU0 Lin,CHE Yue—long,WU Guo—hua
Analysis of Reason for Frost Damage and Frost Protection Measure for Fire Pipe Installed in Station Platform of High—speed Railway in North China
Journal of Railway Engineering Society 2010 Vol.27 (12): 27-30 [
Abstract
] (
2572
) 1 [
HTML
1 KB] [
PDF
339 KB] (
85
)
51
YANG Shan—kui,CHEN Si—xiao
Analysis and Study on Stability of the High—pier and Large-span Contimuous Rigid Frame Bridge During Construction
Journal of Railway Engineering Society 2010 Vol.27 (12): 51-55 [
Abstract
] (
2657
) 1 [
HTML
1 KB] [
PDF
384 KB] (
131
)
64
JIANG Xianping,LI Gang,LI Peng
Study on Correlativity——based Probability Grading Method for Surrounding Rock of Railway Tunnel
Journal of Railway Engineering Society 2010 Vol.27 (12): 64-68 [
Abstract
] (
2589
) 1 [
HTML
1 KB] [
PDF
551 KB] (
125
)
73
LI Yan
Application of Orthotropic Deck Through Steel Plate Girder in Electrified Upgrading of Existing Railways
Journal of Railway Engineering Society 2010 Vol.27 (12): 73-76 [
Abstract
] (
2506
) 1 [
HTML
1 KB] [
PDF
384 KB] (
111
)
77
WU Ping,YUAN Yong,LI Jiah
Research on Comprehensive Compensation of Majiaoba Traction Substation of Baoji—Chengdu Railway
Journal of Railway Engineering Society 2010 Vol.27 (12): 77-80 [
Abstract
] (
2555
) 1 [
HTML
1 KB] [
PDF
335 KB] (
114
)
First page
|
Prev page
|
Next page
|
Last page
Page 14 of 39, 1156 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech