Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "[U25]":
111 SUN JI-tang
  TUNNEL BLASTING DESIGN EXPERT SYSTEM
    Journal of Railway Engineering Society   1999 Vol.16 (3): 111-114 [Abstract] (2506) 1 [HTML 1 KB] [PDF 230 KB] (127)
115 CHANG Mian-sheng,CHEN Chang-zheng
  POWER SUPPLY AND DISTRIBUTION SCHEME DURING CONSTRUCTION AT ENTRANCE OF MIHUALING TUNNEL
    Journal of Railway Engineering Society   1999 Vol.16 (3): 115-118 [Abstract] (2518) 1 [HTML 1 KB] [PDF 188 KB] (65)
119 WEI Lan-fang,LI Wan-liang
  THINKING ABOUT INSTALLATION FOR TRACTION POWER RAILWAY SPECIAL IINES
    Journal of Railway Engineering Society   1999 Vol.16 (3): 119-121 [Abstract] (2492) 1 [HTML 1 KB] [PDF 177 KB] (133)
122 FAN Wei-li
  PRELIMINARY ANALYSIS ON DESIGN OF PILE BOX FOUNDATION FOR A HIGH MULTI STOREY BUILDING
    Journal of Railway Engineering Society   1999 Vol.16 (3): 122-125 [Abstract] (4796) 1 [HTML 1 KB] [PDF 194 KB] (123)
126 ZHONG Yu-lin
  DESIGN ON BUILDING OF SLAB COLUMN STRUCTURE WITHOUT COLUMN-CAP
    Journal of Railway Engineering Society   1999 Vol.16 (3): 126-129 [Abstract] (2479) 1 [HTML 1 KB] [PDF 209 KB] (110)
130 WEI Wei
  PRELIMINARY EXPLORATION ON ESTABLISHING A NEW RAILWAY CONSTRUCTION MANAGEMENT SYSTEM UNDER THE SOCIALISTIC MARKET ECONOMY CONDITIONS
    Journal of Railway Engineering Society   1999 Vol.16 (3): 130-133 [Abstract] (2466) 1 [HTML 1 KB] [PDF 222 KB] (97)
134 HAN Tong-yin,ZHANG Xian-feng,CHEN Feng-ping
  TO CREATE AN ENVIRONMENT FOR RAISING THE ENGINEERING QUALITY OF RAILWAY CONSTRUCTION
    Journal of Railway Engineering Society   1999 Vol.16 (3): 134-136 [Abstract] (2474) 1 [HTML 1 KB] [PDF 173 KB] (121)
1 SUN Guang-zhong
  BASIC THEORY AND APPLICATION TECHNIQUE FOR SPEEDING UP THE RAILWAY CONSTRUCTION OF CHINA
    Journal of Railway Engineering Society   1999 Vol.16 (2): 1-4 [Abstract] (2466) 1 [HTML 1 KB] [PDF 273 KB] (71)
5 ZHU Yin,MEGN Zhi-yong,KAN Shu-yu
  RESEARCH ON THEORY AND METHODS OF SCHEME COMPARISON FOR NEWLY-BUILT RAILWAY CONSTRUCTION
    Journal of Railway Engineering Society   1999 Vol.16 (2): 5-8 [Abstract] (2513) 1 [HTML 1 KB] [PDF 261 KB] (138)
9 LIANG Qing-huai,ZENG Xue-gui
  THE SITUATION AND DIRECTION OF CHINESE RAILWAY DESIGN CAD
    Journal of Railway Engineering Society   1999 Vol.16 (2): 9-10 [Abstract] (2527) 1 [HTML 1 KB] [PDF 216 KB] (174)
11 QU Xiao-hui,REN Run-tang
  PRE-STATION DESIGN TECHNIQUES OF HIGH SPEED RAILWAY AND EXPLORATION ON ITS ESSENTIAL PROBLEMS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 11-16 [Abstract] (2546) 1 [HTML 1 KB] [PDF 463 KB] (115)
17 JING Wen-chang
  PRELIMINARY DISUSSION ON RAILWAY ROUTE SELECTION IN DESERT REGIONS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 17-22 [Abstract] (2501) 1 [HTML 1 KB] [PDF 427 KB] (158)
23 JIANG Xian-yang,CAI Jin-huo
  ASSEMBLY TECHNIQUE OF STEEL TUBE ARCH RIBS FOR 100m MAIN SPAN OF HONGZHOU MAJOR BRIDGE
    Journal of Railway Engineering Society   1999 Vol.16 (2): 23-26 [Abstract] (2512) 1 [HTML 1 KB] [PDF 260 KB] (77)
27 SUN Zhao-yuan
  ERECTING 2 × 64 m CONTINUOUS STEEL TRUSS BY BIDIRECTIONAL COMPLETE CANTILEVER ASSEMBLY METHOD
    Journal of Railway Engineering Society   1999 Vol.16 (2): 27-30 [Abstract] (2527) 1 [HTML 1 KB] [PDF 301 KB] (151)
31 LEI Xiao-yan,LI Ming-hua
  ANALYSES OF CLIP BOLT FRACTURE FOR GUARD RAIL OF RAILWAY BRIDGE
    Journal of Railway Engineering Society   1999 Vol.16 (2): 31-35 [Abstract] (2497) 1 [HTML 1 KB] [PDF 314 KB] (126)
36 LIANG Bo
  SIMPLIFIED CALCULATION METHOD OF ACTIVE EARTH PRESSURE ON BACK OF ABUTMENT UNDER EARTHQUAKE CONDITION
    Journal of Railway Engineering Society   1999 Vol.16 (2): 36-38 [Abstract] (2536) 1 [HTML 1 KB] [PDF 172 KB] (163)
39 WANG Qiang,LENG Wu-ming
  UNCERTAINTY ANALYSIS OF THE DESIGN VARIABLES OF THE RAILWAY BRIDGE’S SHALLOW FOUNDATIONS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 39-42 [Abstract] (2539) 1 [HTML 1 KB] [PDF 278 KB] (96)
43 GUO Shan-yun
  ANALYSES ON PRACTICAL EXAMPLES OF RAPID CONSTRUCTION OF MOUNTAIN TUNNELS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 43-47 [Abstract] (2503) 1 [HTML 1 KB] [PDF 454 KB] (136)
48 ZHANC De-he
  DESIGN AND CONSTRUCTION OF TUNNEL CROSSING CAVERN WITH ACCUMULTIONS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 48-53 [Abstract] (4765) 1 [HTML 1 KB] [PDF 421 KB] (109)
54 HAN Wei-dong,QIAO Chun-sheng
  THERMAL FIELD SIMULATION OF IMMERSED TUNNEL UNIT DURING ITS CONSTRUCTION
    Journal of Railway Engineering Society   1999 Vol.16 (2): 54-57 [Abstract] (2577) 1 [HTML 1 KB] [PDF 278 KB] (78)
58 FENG Ming-jun1,JU Xiao-hua2
  REINFORCING GROUND CREEP AT ENTRANCE OF TUNNEL BY PRESTRESSED ANCHOR CABLE
    Journal of Railway Engineering Society   1999 Vol.16 (2): 58-62 [Abstract] (4774) 1 [HTML 1 KB] [PDF 298 KB] (107)
63 XU He-ping
  THINK UPON TREATMENT OF LEAK OF TUNNEL LINING ON NANKUN RAILWAY (WEST-SECTION)
    Journal of Railway Engineering Society   1999 Vol.16 (2): 63-68 [Abstract] (2478) 1 [HTML 1 KB] [PDF 411 KB] (194)
69 ZHENG Yu-xin
  ANALYSIS ON SLIDE MECHANISM DURING CONSTRUCTION OF TUNNELS AND ITS TREATMENT METHODS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 69-72 [Abstract] (2498) 1 [HTML 1 KB] [PDF 286 KB] (264)
73 HE De-quan,ZHANG Zhao-cai
  SELECTION OF TYPES AND METHODS FOR THE RESTRAINT WORKS OF LANDSLIDE AT DK163
    Journal of Railway Engineering Society   1999 Vol.16 (2): 73-76 [Abstract] (2488) 1 [HTML 1 KB] [PDF 299 KB] (77)
77 ZHU Chi
  CONTROLLED BLASTING TECHNIQUE OF HIGH ROCK SLOPE ON ELECTRIFIED DOUBLE TRACK RAILWAY WITH MINIMUM DISTANCE BETWEEN CENTERS OF TRACKS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 77-82 [Abstract] (2617) 1 [HTML 1 KB] [PDF 362 KB] (77)
83 YUAN Yu-sen
  PRESTRESSED REINFORCED CONCRETE MAST FOR HIGH CAPACITY HEADSPAN SUSPENSION
    Journal of Railway Engineering Society   1999 Vol.16 (2): 83-85 [Abstract] (2540) 1 [HTML 1 KB] [PDF 210 KB] (188)
86 YIN Chuan-gui,KANG Li-juan
  METHOD BY SERIES CONNECTION OF CAPACITY AT EARTHING END OF TRANSFORMER AND ITS COMPARISON&ANALYSIS
    Journal of Railway Engineering Society   1999 Vol.16 (2): 86-87 [Abstract] (2524) 1 [HTML 1 KB] [PDF 144 KB] (99)
88 XU An-hua
  REVIEW AND THOUGHT ON MECHANIZATION OF RAILWAY CONSTRUCTION
    Journal of Railway Engineering Society   1999 Vol.16 (2): 88-93 [Abstract] (2511) 1 [HTML 1 KB] [PDF 461 KB] (124)
94 HE Yu-lian
  SCIENTIFIC FORECAST METHOD ON CONSTRUCTION RATE OF PROGRESS FOR TBM
    Journal of Railway Engineering Society   1999 Vol.16 (2): 94-98 [Abstract] (2520) 1 [HTML 1 KB] [PDF 311 KB] (160)
99 PAN Pei-hua
  ANALYSIS AND PREVENTION ON COMMON ACCIDENT OF CRAWLER CRANE DURING FORCED TAMPING ON FOUNDATION
    Journal of Railway Engineering Society   1999 Vol.16 (2): 99-103 [Abstract] (2522) 1 [HTML 1 KB] [PDF 353 KB] (124)
First page | Prev page | Next page | Last pagePage 114 of 117, 3488 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech