EXPERIMENT AND FINITE ELEMENT ANALYSIS OF BRIDGE PIER WITH HIGHRISE PILE CAP UNDER DYNAMIC TRAIN LOADING
Journal of Railway Engineering Society
2000 Vol.17 (3): 36-40
[Abstract]
(2443)
1
[HTML 1 KB]
[PDF 179 KB]
(64)
41
CHU Zhu-you
CALCULATION, CONSTRUCTION AND TESTING FOR NON-ADHESIVE PRESTRESSED FRAME BEAMS
Journal of Railway Engineering Society
2000 Vol.17 (3): 41-47
[Abstract]
(2510)
1
[HTML 1 KB]
[PDF 217 KB]
(80)
48
XIE Xiao-lan
DESIGN OF HUAKOU Lp= 42 M TIE BAR ARCH EXTRA-LONG BRIDGE
Journal of Railway Engineering Society
2000 Vol.17 (3): 48-49
[Abstract]
(2545)
1
[HTML 1 KB]
[PDF 75 KB]
(101)
50
ZHAO Ai-qing
APPLICATION ON TECHNOLOGY OF PRESSING PILES BY JACKING USED IN BRIDGE ENGINEERING OF XIAO-YONG SECOND RAILWAY-LINE
Journal of Railway Engineering Society
2000 Vol.17 (3): 50-53
[Abstract]
(2463)
1
[HTML 1 KB]
[PDF 144 KB]
(104)
54
SUN Hong-wei
CONSTRUCTION TECHNIQUE OF HIGH PIERS FORQINCAIGOU LONGSPAN BRIDGE
Journal of Railway Engineering Society
2000 Vol.17 (3): 54-56
[Abstract]
(2483)
1
[HTML 1 KB]
[PDF 100 KB]
(91)
57
ZHENGHong-ning,JIN De-hui
OPTIMIZING THE STRUCTURE OF SIDEWALK ON CURVED BRIDGE TO INCREASE AESTHETIC PERCEPTION OF FLOOR SYSTEM ON RAILWAY BRIDGE
Journal of Railway Engineering Society
2000 Vol.17 (3): 57-61
[Abstract]
(2613)
1
[HTML 1 KB]
[PDF 164 KB]
(124)
62
WAN G Gong-ze
CONSTRUCTION OF LONGSPAN STEEL-CONCRETE COMPOSITE BEAMS
Journal of Railway Engineering Society
2000 Vol.17 (3): 62-64
[Abstract]
(2570)
1
[HTML 1 KB]
[PDF 95 KB]
(97)
30
LIU Jian-f eng, WEI Qing-zhao
PREDICTION OF FATIGUE SERVICE LIFE FOR RAILS OF HIGH-SPEED RAILWAY
Journal of Railway Engineering Society
2000 Vol.17 (2): 30-34
[Abstract]
(2662)
1
[HTML 1 KB]
[PDF 167 KB]
(283)
35
PENG Yue-shen
SEVERAL TECHNICAL PROBLEMS ABOUT RAILWAY CONCRETE-FILLED STEEL TUBULAR ARCH BRIDGE
Journal of Railway Engineering Society
2000 Vol.17 (2): 35-39
[Abstract]
(2538)
1
[HTML 1 KB]
[PDF 161 KB]
(152)
40
KUANG Yong
DESIGN AND CALCULATION OF BRACKET FOR A LONG SPAN BOX SECTION ARCH BRIDGE
Journal of Railway Engineering Society
2000 Vol.17 (2): 40-43
[Abstract]
(2519)
1
[HTML 1 KB]
[PDF 142 KB]
(87)
37
CHEN Ke-wang
CONSTRUCTION OF STEEL GIRDER BRIDGE ON THE SHANGHAI UMT PEARL LINE FOR STRIDING HU-NING AND HU-HANG RAILWAYS
Journal of Railway Engineering Society
2000 Vol.17 (1): 37-44
[Abstract]
(2539)
1
[HTML 1 KB]
[PDF 254 KB]
(79)
45
BU Jian-qing,LOU Guo-chong,LUO Yong-hui
PROBING ON CAUSE TO THE LATERAL AMPLITUDE OF RAILWAY BRIDGE GOING BEYOND LIMIT AND METHOD TO RESTRENGTHEN BRIDGE AND REDUCE BRIDGE AMPLITUDE OF VIBRATION
Journal of Railway Engineering Society
2000 Vol.17 (1): 45-48
[Abstract]
(2559)
1
[HTML 1 KB]
[PDF 126 KB]
(137)
49
LU Wen-liang1,XU Ke-bin1,LI Wen-hui2
RELIABILITY ANALYSIS ON STABILITY AGAINST SLIDING FOR RAILWAY ABUTMENT
Journal of Railway Engineering Society
2000 Vol.17 (1): 49-54
[Abstract]
(2515)
1
[HTML 1 KB]
[PDF 178 KB]
(146)
95
DINGRui
DEVELOPMENT OF TSS-TYPE GROUTING TUBE AND ITS APPLICATION IN SATURATED AQUIFER OF SAND STRATUM
Journal of Railway Engineering Society
2000 Vol.17 (1): 95-101
[Abstract]
(2471)
1
[HTML 1 KB]
[PDF 220 KB]
(80)
102
WU Hong-tao
RESEARCH ON CONSTRUCTION TECHNIQUE FOR DEEP BORDE PILES
Journal of Railway Engineering Society
2000 Vol.17 (1): 102-106
[Abstract]
(2577)
1
[HTML 1 KB]
[PDF 149 KB]
(88)
37
ZHONG Ming,XU Ke-bin,YUAN Chang-qing
CALCULATING METHOD OF TORSION-BENDING ANALYSIS OF SIM?PLY SUPPORTED STRAIGHT CONCRETE BEAMS ON RAILWAY CURVE
Journal of Railway Engineering Society
1999 Vol.16 (4): 37-41
[Abstract]
(2521)
1
[HTML 1 KB]
[PDF 222 KB]
(113)
42
WANG Zhao-hui
CONSTRUCTION TECHNIQUE THAT BRING PRESTRESSED EQUIVALENT PRESSURE TO BEAR ON NO. 0 BLOCK CANTILEVER BRACKET OF CONSTRUCTED BRIDGE
Journal of Railway Engineering Society
1999 Vol.16 (4): 42-46
[Abstract]
(2511)
1
[HTML 1 KB]
[PDF 249 KB]
(133)
58
CUI Hua-lin
APPLICATION OF SYNTHETIC DE WATERING AND DRAINAGE TECHNIQUE DURING CONSTRUCTION OF TUNNEL WITH PLENTY- WATER EXTREMELY-WEAK SURROUNDING ROCK
Journal of Railway Engineering Society
1999 Vol.16 (4): 58-61
[Abstract]
(2475)
1
[HTML 1 KB]
[PDF 212 KB]
(98)