Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U45":
68 LIU Dan
  GREAT EMPHASIS ON APPLICATION OF ISOTOPE TECHNIQUE TO STUDY OF TUNNEL GROUNDWATER ENVIRONMENT
    Journal of Railway Engineering Society   2002 Vol.19 (4): 68-70 [Abstract] (2509) 1 [HTML 1 KB] [PDF 306 KB] (169)
71 ZHANG Min-qing, HAN Zhan-bo, SUN Guo-qing
  CONSTRUCTION TECHNOLOGY OF CAVITY SECTION PDK354+255~+275 IN PARALLEL HEADING AT INTAKE PORTAL OF YUANLIANG MOUNTAIN TUNNEL
    Journal of Railway Engineering Society   2002 Vol.19 (4): 71-78 [Abstract] (2502) 1 [HTML 1 KB] [PDF 470 KB] (165)
79 CAO Xiao-lin
  ELEMENTARY ANALYSIS OF MICRO-CRACKS ON FORMWORKING CON- CRE TE LIN IN GIN TUNNEL
    Journal of Railway Engineering Society   2002 Vol.19 (4): 79-81 [Abstract] (2528) 1 [HTML 1 KB] [PDF 130 KB] (94)
82 WU Bo, GAO Bo, GUAN Bao-shu
  ELASTOPLASTIC DESIGN THEORY OF BOLT-SPRAYING SUPPORTING AND ITS ENGINEERING APPLICATION
    Journal of Railway Engineering Society   2002 Vol.19 (4): 82-85 [Abstract] (2491) 1 [HTML 1 KB] [PDF 132 KB] (163)
86 LIU Chun
  FEASIBILITY ANALYSIS CONCERNED WITH CONSTRUCTION WUXIAOLING TUNNEL BY ADOPTING TBM
    Journal of Railway Engineering Society   2002 Vol.19 (4): 86-90 [Abstract] (2555) 1 [HTML 1 KB] [PDF 156 KB] (133)
48 YE Xiao-bing,LUO Xiang,CAO Hai-dong
  LANDSLIDE MONITORING AND ITS PREVENTIVE TREATMENTS FOR ELEVATED SLOPE AT TUNNEL PORTAL OF CERTAIN EXPRESSWAY
    Journal of Railway Engineering Society   2002 Vol.19 (3): 48-50 [Abstract] (2540) 1 [HTML 1 KB] [PDF 189 KB] (172)
51 CAO Xiao-lin
  LOADING ANALYSIS OF LINING JUMBO DURING CONSTRUCTION OF CONCRETE TUNNEL LINING
    Journal of Railway Engineering Society   2002 Vol.19 (3): 51-53 [Abstract] (2494) 1 [HTML 1 KB] [PDF 137 KB] (323)
75 XIE Yu-qing,WANG long-huai
  SEVERAL PROBLEMS IN STATISTIC PROCEDURE ON QUALITY OF CONCRETE PRODUCTION
    Journal of Railway Engineering Society   2002 Vol.19 (3): 75-76 [Abstract] (2448) 1 [HTML 1 KB] [PDF 122 KB] (92)
86 ZHANG Min-qing,LI Jian-wei
  STUDY ON CONSTRUCTION TECHNIQUE OF TBM IN WEAK SURROUNDING ROCK
    Journal of Railway Engineering Society   2002 Vol.19 (2): 86-89 [Abstract] (2484) 1 [HTML 1 KB] [PDF 199 KB] (109)
90 ZHAO-Hua
  APPLICATION OF VIBRATION MONITORING METHOD ON STATE-MONI- TORING AND FAULT DIAGNOSIS OF ENGINEERING MACHINERY
    Journal of Railway Engineering Society   2002 Vol.19 (2): 90-92 [Abstract] (2496) 1 [HTML 1 KB] [PDF 140 KB] (336)
93 YE Qiang,WANG Zhen-xiang,WU Ru-yu,LI Tie-he,WU Hong-jiang
  DESIGN OF UNDERGROUND DIAPHRAGM WALL SUPPORT FOR PUBLIC SQUARE AT GONGBEI PORT IN ZHUHAI CITY
    Journal of Railway Engineering Society   2002 Vol.19 (2): 93-99 [Abstract] (2518) 1 [HTML 1 KB] [PDF 258 KB] (200)
38 LIU Xiao-bing
  SYNTHETIC EVALUATION ON INFLUENCE FACTORS OF SLOPE STABI- LIZATION AROUND TUNNEL ENTRANCE
    Journal of Railway Engineering Society   2002 Vol.19 (1): 38-41 [Abstract] (2543) 1 [HTML 1 KB] [PDF 226 KB] (233)
42 DENG Yi-ming
  HUMBLE OPINIONS ABOUT SEVERAL DIFFICULT PROBLEMS OF KARST HYDROGEOLOGY IN MAOBA SYCLINIC STRUCTURE OF THE YUANLIANG-SHAN TUNNEL
    Journal of Railway Engineering Society   2002 Vol.19 (1): 42-46 [Abstract] (2488) 1 [HTML 1 KB] [PDF 209 KB] (122)
47 FU Hua-xing
  JIAZHUQING TUNNEL AND THE ROCK MECHANICS,PART I:APPLICA- TION OF COULOMB'S LATERAL PRESSURE THEORY AND MOHR'S STRESS CIRCLE
    Journal of Railway Engineering Society   2002 Vol.19 (1): 47-54 [Abstract] (2492) 1 [HTML 1 KB] [PDF 310 KB] (127)
55 HE Wei-qi
  RENOVATION AND PREVENTION ON QUALITY DEFECTS OF NEWLY-BUILT TUNNELS
    Journal of Railway Engineering Society   2002 Vol.19 (1): 55-58 [Abstract] (2464) 1 [HTML 1 KB] [PDF 150 KB] (249)
59 LUO Zhan-fu
  ANALYSIS ON RELIABILITY OF GALLERY VENTILATION SYSTEM
    Journal of Railway Engineering Society   2002 Vol.19 (1): 59-61 [Abstract] (2517) 1 [HTML 1 KB] [PDF 121 KB] (170)
62 QI Zhi-fu,SUN Bo
  CONSTRUCTION OF MULTI-ARCH TUNNELS WITH TWIN LARGE SPANS BY NATM
    Journal of Railway Engineering Society   2002 Vol.19 (1): 62-65 [Abstract] (2530) 1 [HTML 1 KB] [PDF 196 KB] (188)
75 ZHOU Shu-ming
  DESIGN OF PRESTRESSED ANCHOR BOLTS AND SIMULATING CALCULATION BY FINITE ELEMENT METHOD FOR ANCHOR BOLT-SPRAY SUPPORT IN BIG-SPAN TUNNEL WITH HARD ROCKS
    Journal of Railway Engineering Society   2001 Vol.18 (4): 75-79 [Abstract] (2550) 1 [HTML 1 KB] [PDF 214 KB] (89)
118 LIU Hui
  STUDY AND CONSTRUCTION OF CONCRETE PAVEMENT BY USING VACUUM DEHYDRATION TECHNOLOGY
    Journal of Railway Engineering Society   2001 Vol.18 (4): 118-122 [Abstract] (2533) 1 [HTML 1 KB] [PDF 212 KB] (209)
121 LI Tao
  LOADING TEST OF PC TIE-BAR-ARCH BRIDGE
    Journal of Railway Engineering Society   2001 Vol.18 (4): 121-123 [Abstract] (2508) 1 [HTML 1 KB] [PDF 154 KB] (119)
124 YANG Cuang-qing, JIAO Jing-qing
  STUDY ON CHOICE OF VARIED SCHEMES FOR RAILWAY CONSTRUCTION
    Journal of Railway Engineering Society   2001 Vol.18 (4): 124-127 [Abstract] (2457) 1 [HTML 1 KB] [PDF 126 KB] (147)
128 DING Rong-chang
  ANALYSIS ON LAUNCHING METHOD AND EQUIPMENT OF BOX BEAM FOR HIGH SPEED RAILWAY
    Journal of Railway Engineering Society   2001 Vol.18 (4): 128-131 [Abstract] (2514) 1 [HTML 1 KB] [PDF 164 KB] (241)
132 LI Ya-lin
  STUDY ON BLAST TECHNIQUE FOR DOUBLE-TRACKING OF ELECTRIFIED RAILWAYS
    Journal of Railway Engineering Society   2001 Vol.18 (4): 132-134 [Abstract] (2488) 1 [HTML 1 KB] [PDF 109 KB] (209)
85 WANG Wei, XIANG Yan-nian
  NON-DESTRUCTIVE TESTING AND ITS APPLICATION IN TUNNELS
    Journal of Railway Engineering Society   2001 Vol.18 (3): 85-88 [Abstract] (2476) 1 [HTML 1 KB] [PDF 168 KB] (113)
89 CUI Zhen-qun
  EXPLORATION ON OPTIMIZATION OF ADIT SCHEME FOR SIZEHE TUNNEL AND ITS CONSTRUCTION SITUATION
    Journal of Railway Engineering Society   2001 Vol.18 (3): 89-91 [Abstract] (3126) 1 [HTML 1 KB] [PDF 164 KB] (125)
116 WANG Guang-zhong, WANG Li-ping
  DEEP BORING GROUTING TECHNOLOGY APPLIED IN CONSTRUCTING TUNNELS WITH SOFT SURROUNDING ROCKS
    Journal of Railway Engineering Society   2001 Vol.18 (3): 116-119 [Abstract] (2499) 1 [HTML 1 KB] [PDF 185 KB] (108)
120 GAO Xiao-dong, SHA Ming-yuan
  ANALYSIS OF WORKING EFFICIENCY IN TUNNEL AND COSTRUCTION TECHNOLOGY OF FULL FACE TUNNEL BORING MACHINE
    Journal of Railway Engineering Society   2001 Vol.18 (3): 120-124 [Abstract] (2489) 1 [HTML 1 KB] [PDF 226 KB] (136)
125 LI Guo-qiang
  EXPERIMENTAL RESEARCH AND ANALYSIS ON BREAKING SURFACE OF REINFORCED EARTH RETAINING WALL
    Journal of Railway Engineering Society   2001 Vol.18 (3): 125-128 [Abstract] (2504) 1 [HTML 1 KB] [PDF 193 KB] (127)
47 DONG Xin-ping, DING Rui
  CONSTRUCTION TECHNIQUE IN UNSTABLE TUNNEL ACCUMULATED WITH POROUS SURROUNDING ROCK
    Journal of Railway Engineering Society   2001 Vol.18 (2): 47-50 [Abstract] (2495) 1 [HTML 1 KB] [PDF 166 KB] (103)
93 HUANG Yue-feng, GAO Sheng-neng, FU Rong-zhang
  CONTROLLED BLASTING TECHNIQUE OF SURROUNDING ROCK AT LUJIANG STATION ON NO.II LINE OF GUANGZHOU SUBWAY
    Journal of Railway Engineering Society   2001 Vol.18 (2): 93-95 [Abstract] (2480) 1 [HTML 1 KB] [PDF 155 KB] (157)
First page | Prev page | Next page | Last pagePage 15 of 17, 509 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech