Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "U455":
58
LI Hao,WANG Tao,XU Ri-qing
Numerical Analysis of the Influence of Tunneling on Ground Movement and Adjacent Frame Structure
Journal of Railway Engineering Society 2008 Vol.25 (9): 58-61 [
Abstract
] (
2617
) 1 [
HTML
1 KB] [
PDF
440 KB] (
257
)
66
WANG Shu-guo,ZHANG Min-qing,HUANG Hong-jian,CHEN Wei-yuan,YIN Huai-lian
Construction Technology of the High Pressure and Enriched Water Fault F1 in Bieyancao Tunnel on Yichang-Wanzhou Railway
Journal of Railway Engineering Society 2008 Vol.25 (9): 66-70 [
Abstract
] (
2557
) 1 [
HTML
1 KB] [
PDF
438 KB] (
192
)
10
CAO Yuan-Pig
Research on the Permafrost Structure of Protection Measures along Qinghai-Tilbet Railway
Journal of Railway Engineering Society 2008 Vol.25 (8): 10-14 [
Abstract
] (
2518
) 1 [
HTML
1 KB] [
PDF
480 KB] (
152
)
50
NING Mao-quan, XIAO Ming-qing
Design and Analysis of Key Technology about Channel Immersed Tunnel
Journal of Railway Engineering Society 2008 Vol.25 (8): 50-53 [
Abstract
] (
2520
) 1 [
HTML
1 KB] [
PDF
437 KB] (
121
)
66
ZHANG Jian-bin
Discussion on the Construction Scheme of Jiaozhou Bay Tunnel Crossing Seabed Fault Zone
Journal of Railway Engineering Society 2008 Vol.25 (5): 66-71 [
Abstract
] (
2525
) 1 [
HTML
1 KB] [
PDF
553 KB] (
223
)
76
WU Bo
Research on the Construction Technology for Excavation of Metro Tunnel Crossing Bridge and River
Journal of Railway Engineering Society 2008 Vol.25 (5): 76-79 [
Abstract
] (
2537
) 1 [
HTML
1 KB] [
PDF
391 KB] (
179
)
50
SUN Qi-qing, ZHAO Wan-qiang, GAO Feng, YU Yu, KUANG Liang
Counter-analysis of Displacement of Support Structures in the F4 Fault of Wushaoling Tunnel
Journal of Railway Engineering Society 2008 Vol.25 (2): 50-53 [
Abstract
] (
4784
) 1 [
HTML
1 KB] [
PDF
371 KB] (
189
)
72
ZHOU Shu-wing, RFN Zheng-lu
Start Tunnelling Method of Tunnel with Big Cross Section Cutting Face
Journal of Railway Engineering Society 2008 Vol.25 (1): 72-75 [
Abstract
] (
2518
) 1 [
HTML
1 KB] [
PDF
415 KB] (
178
)
81
HUANG He
Construction Program of Catenary Suspension in Low Headroom Tunnel in Integrated Ballastless Track Experimental Section of Suining-Chongqing Railway
Journal of Railway Engineering Society 2008 Vol.25 (1): 81-84 [
Abstract
] (
2473
) 1 [
HTML
1 KB] [
PDF
406 KB] (
95
)
58
LI Hong-xia
Research on the Construction Scheme of Horizontally Approaching Excavation Shield Tunnel
Journal of Railway Engineering Society 2007 Vol.24 (10): 58-61 [
Abstract
] (
2540
) 1 [
HTML
1 KB] [
PDF
384 KB] (
177
)
46
CHEN Fu-quan,LI Da-yong,WANG Hui
Research on Impact of Shield Tunnelling on Surrounding Environment of Tunnel
Journal of Railway Engineering Society 2007 Vol.24 (9): 46-50 [
Abstract
] (
2508
) 1 [
HTML
1 KB] [
PDF
452 KB] (
119
)
67
GUO Shan-yan
Progresses and Developments of Tunnel Construction Technology with Bored Blast Method
Journal of Railway Engineering Society 2007 Vol.24 (9): 67-74 [
Abstract
] (
2604
) 1 [
HTML
1 KB] [
PDF
1087 KB] (
260
)
52
LI Guo-cheng, LI We-min
Study on the Influence on Surrounding Buildings by Construction of Yangtze River Tunnel
Journal of Railway Engineering Society 2007 Vol.24 (7): 52-55 [
Abstract
] (
2547
) 1 [
HTML
1 KB] [
PDF
353 KB] (
59
)
56
YANG Yu-sang, WU Hao, XU Jian-fei,YANG Xiao-qiang
Construction of Shield Tunnel in Karst Strata
Journal of Railway Engineering Society 2007 Vol.24 (7): 56-60 [
Abstract
] (
3032
) 1 [
HTML
1 KB] [
PDF
443 KB] (
159
)
71
WEI Jia-jun
Construction Technology for Tunnel Unerpassed Underground River
Journal of Railway Engineering Society 2007 Vol.24 (7): 71-75 [
Abstract
] (
4831
) 1 [
HTML
1 KB] [
PDF
434 KB] (
171
)
82
YUAN Ming,CAO Xiao-lin,LIU Wei
Research on Comprehensive Construction Technique for Shallow Tunnel with Soft Foundation Under Existing Highway
Journal of Railway Engineering Society 2007 Vol.24 (5): 82-85 [
Abstract
] (
2551
) 1 [
HTML
1 KB] [
PDF
371 KB] (
108
)
70
ZHANG Shuang-ya,CHEN Kui
Shield Machine Type Selection for Beijing Rail Underground Transit Line
Journal of Railway Engineering Society 2007 Vol.24 (3): 70-73 [
Abstract
] (
2721
) 1 [
HTML
1 KB] [
PDF
267 KB] (
171
)
80
ZHENG Jun-jie, BAO De-yong, GONG Yan-feng, ZI Yi
Research on Construction Control Technology for Railway Tunnel underneath Passing Existing Expressway Tunnel
Journal of Railway Engineering Society 2006 Vol.23 (8): 80-84 [
Abstract
] (
2538
) 1 [
HTML
1 KB] [
PDF
253 KB] (
443
)
59
GAO Xiao-dong
The Measures and Construction Methods about the Open Full-face Tunnel Boring Machine Going through the Bad Geology Area
Journal of Railway Engineering Society 2006 Vol.23 (6): 59-63 [
Abstract
] (
2588
) 1 [
HTML
1 KB] [
PDF
420 KB] (
182
)
67
TANG Jian, CHEN Kui
Dispatch and Control System of Carrier Vehicle Used for Construction of Extreme-long Tunnel
Journal of Railway Engineering Society 2006 Vol.23 (6): 67-70 [
Abstract
] (
2467
) 1 [
HTML
1 KB] [
PDF
348 KB] (
120
)
43
AI Hua-an
Design and Treatment Measure for Wuzhaoguan Tunnel Passing Through Underground River
Journal of Railway Engineering Society 2006 Vol.23 (4): 43-46 [
Abstract
] (
2513
) 1 [
HTML
1 KB] [
PDF
310 KB] (
95
)
40
TANG Jian
Research and Design on the Programmable Logic Controller System in Shield Machine
Journal of Railway Engineering Society 2006 Vol.23 (3): 40-43 [
Abstract
] (
2511
) 1 [
HTML
1 KB] [
PDF
449 KB] (
177
)
47
WU Zhi-sheng
DEMONSTRATION AND ENFORCEMENT OF DESIGN AND CONSTRUCTION SCHEMES FOR LONG TUNNEL IN KARST ZONE
Journal of Railway Engineering Society 2006 Vol.23 (2): 47-51 [
Abstract
] (
2684
) 1 [
HTML
1 KB] [
PDF
169 KB] (
205
)
64
LIN Mu-guo, LI Ming-hua
APPLICATION OF THAT REPAIR THE DISSOLUTION CAVES WITH THE PILE OF HIGH PRESSURE AND REUNITE FOUNDATION
Journal of Railway Engineering Society 2006 Vol.23 (2): 64-66 [
Abstract
] (
2495
) 1 [
HTML
1 KB] [
PDF
319 KB] (
108
)
66
SONG Ke-zhi,YUAN Da-jun, WANG Meng-shu
STUDY REVIEW ON THE INTERACTION BETWEEN DISK CUTTER AND ROCK
Journal of Railway Engineering Society 2005 Vol.22 (6): 66-69 [
Abstract
] (
3096
) 1 [
HTML
1 KB] [
PDF
806 KB] (
427
)
51
LIAO Da-ken
CONSTRUCTION TECHNIQUE FOR SINGLE TRACK RAILWAY TUNNEL IN SATURATED LOESS AREA
Journal of Railway Engineering Society 2005 Vol.22 (4): 51-54 [
Abstract
] (
4731
) 1 [
HTML
1 KB] [
PDF
0 KB] (
170
)
61
FAN Heng-xiu, HAO Xiao-su
COMMENTS ON RAPID CONSTRUCTION OF SUBMARINE TUNNEL FOR XIAMEN EAST CORRIDOR
Journal of Railway Engineering Society 2005 Vol.22 (3): 61-64 [
Abstract
] (
2548
) 1 [
HTML
1 KB] [
PDF
344 KB] (
70
)
65
LUO Qiong
THE CONSTRUCTION TECHNOLOGY OF KARST TUNNEL
Journal of Railway Engineering Society 2005 Vol.22 (3): 65-71 [
Abstract
] (
2562
) 1 [
HTML
1 KB] [
PDF
563 KB] (
192
)
38
LIU Hui
APPLIED ANALYSIS OF CONSTRUCTION OF UNDERGROUND ENGINEERING BY SHALLOW BURYING SUBSURFACE EXCAVATION METHOD
Journal of Railway Engineering Society 2005 Vol.22 (2): 38-40 [
Abstract
] (
2526
) 1 [
HTML
1 KB] [
PDF
349 KB] (
193
)
45
LIU Dong-liang
SOIL PRESSURE CONTROL FOR EPB SHIELD EXCAVATION
Journal of Railway Engineering Society 2005 Vol.22 (2): 45-50 [
Abstract
] (
2537
) 1 [
HTML
1 KB] [
PDF
457 KB] (
241
)
First page
|
Prev page
|
Next page
|
Last page
Page 4 of 6, 177 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech