Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U455":
58 LI Hao,WANG Tao,XU Ri-qing
  Numerical Analysis of the Influence of Tunneling on Ground Movement and Adjacent Frame Structure
    Journal of Railway Engineering Society   2008 Vol.25 (9): 58-61 [Abstract] (2617) 1 [HTML 1 KB] [PDF 440 KB] (257)
66 WANG Shu-guo,ZHANG Min-qing,HUANG Hong-jian,CHEN Wei-yuan,YIN Huai-lian
  Construction Technology of the High Pressure and Enriched Water Fault F1 in Bieyancao Tunnel on Yichang-Wanzhou Railway
    Journal of Railway Engineering Society   2008 Vol.25 (9): 66-70 [Abstract] (2557) 1 [HTML 1 KB] [PDF 438 KB] (192)
10 CAO Yuan-Pig
  Research on the Permafrost Structure of Protection Measures along Qinghai-Tilbet Railway
    Journal of Railway Engineering Society   2008 Vol.25 (8): 10-14 [Abstract] (2518) 1 [HTML 1 KB] [PDF 480 KB] (152)
50 NING Mao-quan, XIAO Ming-qing
  Design and Analysis of Key Technology about Channel Immersed Tunnel
    Journal of Railway Engineering Society   2008 Vol.25 (8): 50-53 [Abstract] (2520) 1 [HTML 1 KB] [PDF 437 KB] (121)
66 ZHANG Jian-bin
  Discussion on the Construction Scheme of Jiaozhou Bay Tunnel Crossing Seabed Fault Zone
    Journal of Railway Engineering Society   2008 Vol.25 (5): 66-71 [Abstract] (2525) 1 [HTML 1 KB] [PDF 553 KB] (223)
76 WU Bo
  Research on the Construction Technology for Excavation of Metro Tunnel Crossing Bridge and River
    Journal of Railway Engineering Society   2008 Vol.25 (5): 76-79 [Abstract] (2537) 1 [HTML 1 KB] [PDF 391 KB] (179)
50 SUN Qi-qing, ZHAO Wan-qiang, GAO Feng, YU Yu, KUANG Liang
  Counter-analysis of Displacement of Support Structures in the F4 Fault of Wushaoling Tunnel
    Journal of Railway Engineering Society   2008 Vol.25 (2): 50-53 [Abstract] (4784) 1 [HTML 1 KB] [PDF 371 KB] (189)
72 ZHOU Shu-wing, RFN Zheng-lu
  Start Tunnelling Method of Tunnel with Big Cross Section Cutting Face
    Journal of Railway Engineering Society   2008 Vol.25 (1): 72-75 [Abstract] (2518) 1 [HTML 1 KB] [PDF 415 KB] (178)
81 HUANG He
  Construction Program of Catenary Suspension in Low Headroom Tunnel in Integrated Ballastless Track Experimental Section of Suining-Chongqing Railway
    Journal of Railway Engineering Society   2008 Vol.25 (1): 81-84 [Abstract] (2473) 1 [HTML 1 KB] [PDF 406 KB] (95)
58 LI Hong-xia
  Research on the Construction Scheme of Horizontally Approaching Excavation Shield Tunnel
    Journal of Railway Engineering Society   2007 Vol.24 (10): 58-61 [Abstract] (2540) 1 [HTML 1 KB] [PDF 384 KB] (177)
46 CHEN Fu-quan,LI Da-yong,WANG Hui
  Research on Impact of Shield Tunnelling on Surrounding Environment of Tunnel
    Journal of Railway Engineering Society   2007 Vol.24 (9): 46-50 [Abstract] (2508) 1 [HTML 1 KB] [PDF 452 KB] (119)
67 GUO Shan-yan
  Progresses and Developments of Tunnel Construction Technology with Bored Blast Method
    Journal of Railway Engineering Society   2007 Vol.24 (9): 67-74 [Abstract] (2604) 1 [HTML 1 KB] [PDF 1087 KB] (260)
52 LI Guo-cheng, LI We-min
  Study on the Influence on Surrounding Buildings by Construction of Yangtze River Tunnel
    Journal of Railway Engineering Society   2007 Vol.24 (7): 52-55 [Abstract] (2547) 1 [HTML 1 KB] [PDF 353 KB] (59)
56 YANG Yu-sang, WU Hao, XU Jian-fei,YANG Xiao-qiang
  Construction of Shield Tunnel in Karst Strata
    Journal of Railway Engineering Society   2007 Vol.24 (7): 56-60 [Abstract] (3032) 1 [HTML 1 KB] [PDF 443 KB] (159)
71 WEI Jia-jun
  Construction Technology for Tunnel Unerpassed Underground River
    Journal of Railway Engineering Society   2007 Vol.24 (7): 71-75 [Abstract] (4831) 1 [HTML 1 KB] [PDF 434 KB] (171)
82 YUAN Ming,CAO Xiao-lin,LIU Wei
  Research on Comprehensive Construction Technique for Shallow Tunnel with Soft Foundation Under Existing Highway
    Journal of Railway Engineering Society   2007 Vol.24 (5): 82-85 [Abstract] (2551) 1 [HTML 1 KB] [PDF 371 KB] (108)
70 ZHANG Shuang-ya,CHEN Kui
  Shield Machine Type Selection for Beijing Rail Underground Transit Line
    Journal of Railway Engineering Society   2007 Vol.24 (3): 70-73 [Abstract] (2721) 1 [HTML 1 KB] [PDF 267 KB] (171)
80 ZHENG Jun-jie, BAO De-yong, GONG Yan-feng, ZI Yi
  Research on Construction Control Technology for Railway Tunnel underneath Passing Existing Expressway Tunnel
    Journal of Railway Engineering Society   2006 Vol.23 (8): 80-84 [Abstract] (2538) 1 [HTML 1 KB] [PDF 253 KB] (443)
59 GAO Xiao-dong
  The Measures and Construction Methods about the Open Full-face Tunnel Boring Machine Going through the Bad Geology Area
    Journal of Railway Engineering Society   2006 Vol.23 (6): 59-63 [Abstract] (2588) 1 [HTML 1 KB] [PDF 420 KB] (182)
67 TANG Jian, CHEN Kui
  Dispatch and Control System of Carrier Vehicle Used for Construction of Extreme-long Tunnel
    Journal of Railway Engineering Society   2006 Vol.23 (6): 67-70 [Abstract] (2467) 1 [HTML 1 KB] [PDF 348 KB] (120)
43 AI Hua-an
  Design and Treatment Measure for Wuzhaoguan Tunnel Passing Through Underground River
    Journal of Railway Engineering Society   2006 Vol.23 (4): 43-46 [Abstract] (2513) 1 [HTML 1 KB] [PDF 310 KB] (95)
40 TANG Jian
  Research and Design on the Programmable Logic Controller System in Shield Machine
    Journal of Railway Engineering Society   2006 Vol.23 (3): 40-43 [Abstract] (2511) 1 [HTML 1 KB] [PDF 449 KB] (177)
47 WU Zhi-sheng
  DEMONSTRATION AND ENFORCEMENT OF DESIGN AND CONSTRUCTION SCHEMES FOR LONG TUNNEL IN KARST ZONE
    Journal of Railway Engineering Society   2006 Vol.23 (2): 47-51 [Abstract] (2684) 1 [HTML 1 KB] [PDF 169 KB] (205)
64 LIN Mu-guo, LI Ming-hua
  APPLICATION OF THAT REPAIR THE DISSOLUTION CAVES WITH THE PILE OF HIGH PRESSURE AND REUNITE FOUNDATION
    Journal of Railway Engineering Society   2006 Vol.23 (2): 64-66 [Abstract] (2495) 1 [HTML 1 KB] [PDF 319 KB] (108)
66 SONG Ke-zhi,YUAN Da-jun, WANG Meng-shu
  STUDY REVIEW ON THE INTERACTION BETWEEN DISK CUTTER AND ROCK
    Journal of Railway Engineering Society   2005 Vol.22 (6): 66-69 [Abstract] (3096) 1 [HTML 1 KB] [PDF 806 KB] (427)
51 LIAO Da-ken
  CONSTRUCTION TECHNIQUE FOR SINGLE TRACK RAILWAY TUNNEL IN SATURATED LOESS AREA
    Journal of Railway Engineering Society   2005 Vol.22 (4): 51-54 [Abstract] (4731) 1 [HTML 1 KB] [PDF 0 KB] (170)
61 FAN Heng-xiu, HAO Xiao-su
  COMMENTS ON RAPID CONSTRUCTION OF SUBMARINE TUNNEL FOR XIAMEN EAST CORRIDOR
    Journal of Railway Engineering Society   2005 Vol.22 (3): 61-64 [Abstract] (2548) 1 [HTML 1 KB] [PDF 344 KB] (70)
65 LUO Qiong
  THE CONSTRUCTION TECHNOLOGY OF KARST TUNNEL
    Journal of Railway Engineering Society   2005 Vol.22 (3): 65-71 [Abstract] (2562) 1 [HTML 1 KB] [PDF 563 KB] (192)
38 LIU Hui
  APPLIED ANALYSIS OF CONSTRUCTION OF UNDERGROUND ENGINEERING BY SHALLOW BURYING SUBSURFACE EXCAVATION METHOD
    Journal of Railway Engineering Society   2005 Vol.22 (2): 38-40 [Abstract] (2526) 1 [HTML 1 KB] [PDF 349 KB] (193)
45 LIU Dong-liang
  SOIL PRESSURE CONTROL FOR EPB SHIELD EXCAVATION
    Journal of Railway Engineering Society   2005 Vol.22 (2): 45-50 [Abstract] (2537) 1 [HTML 1 KB] [PDF 457 KB] (241)
First page | Prev page | Next page | Last pagePage 4 of 6, 177 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech