2012 Vol. 29, No. 10
Published: 2012-10-15

 
1 Study on Planning of Inter - city Railway Network in Guanzhong of Shanxi Province
YANG Ping
Research purposes:From the study on the planning of the inter - city railway network in Guanzhong of Shanxi Province,it can be seen that the Guanzhong Urban agglomeration is the core region of the Guanzhong - Tianshui Economic Region,and construction of the inter - city railway network is the major action to promote the balanced development among different regions and form an important stragetic highland for the west development. Also this railway network has the significant realistic effect and profound historic sense for giving play to its proper and leading effect,promoting the economic revitalization of the North - West China,and pushing foreward the sustainable development.After the establishment of the Guanzhong - Tianshui Economic Region,the radiating and driving play of the Guanzhong Urban Agglomeration with Xi'an City as center will be further strengthened.
Research conclusions:Based on studying the overall development plan,the space distribution,industry layout plan and passenger flow distribution of the Guanzhong Urban Agglomeration,the skeleton of network was defined.Finally,the circular radiative network structure of a " V" shape main frame was recommanded with Baoji - Xi'an - Weinan as main axis and Xi'an as the center.
2012 Vol. 29 (10): 1-6 [Abstract] ( 2840 ) HTML (1 KB)  PDF  (448 KB)  ( 349 )
7 Research on Scheme for Leading Changchun - Baicheng - Wulanhaote Rapid Railway into Baicheng Railway Region
DONG Zhi - qiang
Research purposes:In recent years,with the rapid development of the railway network,many rapid railways are led into the small railway area . The small railway region is different from the major railway terminal,so it is worth doing the research on how to lead the rapid railway into the small railway region. Taking the leading the Changchun - Baicheng - Wulanhaote rapid railway into the small railway region in Baicheng as an example,this paper researches how to lead the rapid railway into the small railway region for the purpose of accumulating the experience of researching and designing the overall layout of the terminals ( region) ,especially the small railway region.
Research conclusions:The Baicheng railway is planed as a one - station form with arrangement in a horizontal line for the passenger and freight traffic .The Baicheng Station is a passenger station and also a technical operation station to deal with the passenger and freight transport in the region. The Changchun - Baicheng - Wulanhaote rapid railway should be lead into the Baicheng station by the direction orientation,and the Baicheng Station should be arranged in a horizontal line for the passenger and freight traffic. The overall layout of the small railway region is not suitably arranged as the separate lines for passenger and freight traffic,which is adopted to the large and medium - sized railway terminal.The one - station type arrangement or cross - type junction arrangement or in - line arrangement should be adopted to the small railway region. This can set an example for research and design of the overall layout of the railway terminal(region) ,especially of the small railway region.
2012 Vol. 29 (10): 7-10 [Abstract] ( 4815 ) HTML (1 KB)  PDF  (527 KB)  ( 150 )
11 Discussion on Necessity of Building Northwest Connecting Track from Area of Hangzhou - Changsha Railway Passenger Dedicated Line Accessing into Nanchang Terminal
QIN Chao
Research purposes:Whether the connecting track for passenger traffic is built reasonably or not directlyaffects the quality of passenger travel and efficiency of transport organization. The Nanchang terminal,as one of the terminals of the Hangzhou - Changsha Railway Passenger Dedicated Line accessing into,is a complex railway terminal Its Henggang northwest connecting track crossing the Beijing - Kowloon Railway has a typical representation. On the basis of the analysis of the function of passenger stations in the terminal,passenger traffic operation volume and the program for the passenger dedicated line accessing into the termina,this paper studies the necessity of building the Henggang northwest connecting track.
Research conclusions:From analyzing a number of factors that affect building the Henggang northwest connecting track for passenger traffic one by one,it can be seen the relative passenger stations and the track capacity are good in adaptability,and on consideration of the function of railway station,being convenient for the passenger travel and improvement of the terminal layout,it is necessary to build the Henggang northwest connecting track for passenger traffic.
2012 Vol. 29 (10): 11-14 [Abstract] ( 2573 ) HTML (1 KB)  PDF  (355 KB)  ( 157 )
15 Research on Railway Alignment in Goal
LI Guo - he,LI Gui - fang
Research purposes:In order to guide the survey and railway alignment in the goaf region,the basic procedures of the railway survey and alignment are summarized,and the computing method for the safety distance in the goaf,the relative parameter and standard and the way for railway alignment are presented.
Research conclusions:The study shows the boundary angle should be used for calculating the safety distance for high -speed railway and the passenger dedicated line of ballastless track,and the rock displacement angle should be used for calculating the safety distance for normal speed railway. Moreover,combined with engineering examples,the method and way for the railway alignment in goaf are presented,including the comparison and selection of the railway alignments in the periphery of mining area,local optimization of alignment in the mining area and the railway alignment based on calculation and monitoring of the deformation of goal .
2012 Vol. 29 (10): 15-20 [Abstract] ( 4853 ) HTML (1 KB)  PDF  (849 KB)  ( 230 )
21 Experimental Research on Permeability Critical Standard for Grouting Quality of Karst Subgrade
REN Xin-Hong,GUO Yong-chun,WANG Qing-hai,SUN Jin-hui,PENG Hui
Research purposes:The permeability critical standard is important for the assessment of grouting quality of karst subgrade. The two key problems were studied thought doing the model test and making theoretical analyses. One was whether there was a critical fissure that could not bring about the underground erosion collapse or not. The other one was if there was such a critical fissure,what was the characteristic value of the permeability of the critical fissure.
Research conclusions:The study results showed that the width of the critical fissure was the key factor for the collapse of covered karst due to the subgrade erosion,the soil property,the compactness and critical hydraulic gradient of the cover,and the collapse width of the critical fissure of the covered karst subgrade was about 2 ~ 4 mm. For the dissoluble rocks subgrade with development of erosion fissure,while the fissure width was less than or equal to 3 mm,or the permeability of karst subgrade was less than or equal to 47Lu,the covered karst subgrade would not collapse under the natural condition.Therefore,it is recommended that the 47Lu should be regarded as the permeability critical standard for grouting quality of karst subgrade.
2012 Vol. 29 (10): 21-27 [Abstract] ( 2563 ) HTML (1 KB)  PDF  (1179 KB)  ( 376 )
28 Study on the Settlement Prediction of Passenger Dedicated Railway Composite Foundation
WEI Yong-xing1,XUE Xin-hua2
Research purposes:How to calculate soil foundation settlement simply as well as accurately is still an issue not well resolved in engineering design. The calculation program of foundation settlement was written by using the C + +and VB computer languages based on the hyperbolic curve tangent modulus theoretical basis. Then,a load test p-s curve of a railway composite foundation was calculated to verify its applicability.
Research conclusions:The calculated results show that,the hyperbolic tangent modulus method presented in this paper has high accuracy in predicting the settlement of passenger dedicated railway composite foundation,and it can forcast ahead of time before construction.This technique may be potential to calculate settlements of passenger dedicated railway composite foundation.
2012 Vol. 29 (10): 28-30 [Abstract] ( 2785 ) HTML (1 KB)  PDF  (299 KB)  ( 127 )
31 Analysis of Protective Mechanism of Sand Blown by the Wind in Inner Mongolia
NIE Li - Gong
Research purposes:The analysis and research were made and done on the composition mechanisms of the sand - stabilization belt system and the sand-resistant belt system,on the the conditions of sand protection with project(machinery) and plant,on the determination of the protection width,on the plant selection and arrangement principle and on the feeding and irrigation conditions.The allocation requirements of the persons for the maintenance works in later stage was given out. The measures for sand protection were presented.The trend of the sand protection with plant was introduced.
Research conclusions:(1) When the rainfall is less than 160 mm and the groundwater can not meet the irrigation requirement,the sand protection with the project ( machinery) should adopted.When the rainfall is from 160 to 280mm,the sand protection with the project should be used along with the plant and small irrigation. When the rainfall is bigger than 280mm,it is unnecessary to conduct small irrigation,but needs pouring water on the plant root. ( 2) The plant protection of trees and shrubbery belt should be arranged with intervals,and the tree spacing should be 2 m×3 m and the shrubbery spacing should be 2 m×1 m or 2 m×1.5 m.3 The corresponding specifications of grid and the topography should be adopted along with some sand - protection barriers to the sand protection with the project. The branch or earthwork grid should be 1 m × 1 m and the downsand height should be 2-3 m. In the far sight situation,one or two sand-protection barrier should be used with height of above 3m,but in no far sight situation,the two or three sand-protection barriers should be used.(4) If the included angle between the alignment of a road or railway with the wind direction is less than 30 degree,the protective width should be L* sin β according to the current code ( β is the included angle between the wind direction and the track) .(5) The film catchment,organic plant and fungi hatching cover can be used for the sand protection.(6) The sand protection should be combined with the tourism and economic development.In the early stage,the investment can increase appropriately.
2012 Vol. 29 (10): 31-36 [Abstract] ( 3195 ) HTML (1 KB)  PDF  (285 KB)  ( 137 )
37 Study on Additional Longitudinal Forces of CWR of Heavy - haul Railway Bearing 40 t Axle Load of Vehicle
YIN Ming - min,YI Nan - fu,MENG Wen - li,WANG Jian
Research purposes:Based on the load and parameters of the foreign Heavy - haul Railway,the track-bridge-pier longitudinal coupling model was established for CWR to calculate and analyze the additional longitudinal forces of CWR on bridge of the heavy - haul railway bearing 40 t axle load.of vehicle for well knowing the influence of the various design parameters on the additional longitudinal force to distinguish the continuous welded rails of the ordinary railway with the passenger dedicated line and help carry out the design of heavy-haul railway.
Research conclusions:To ensure the safety of the heavy - haul railway bearing 40 t axle load of vehicle,the large cross-section rail with high strength. should be used. When the rapid relative displacement of the beam and rail is not more than 4 mm,the span of the bridge for the heavy - haul railway bearing 40 t axle load of vehicle should not exceed 40 m,and at this time,the minimum limit value of the vertical line stiffness of the pier is more than the value in the " Design Specifications for High - speed Railway" . Therefore,the vertical line stiffness should be controlled by the pier stiffness according to the calculation to make the braking force born by the rail and bridge pier.stiffness should
2012 Vol. 29 (10): 37-41 [Abstract] ( 3439 ) HTML (1 KB)  PDF  (538 KB)  ( 133 )
42 Study on Variation Rules of Longitudinal Force of Continuous Welded Rails on Long - span Cable - stayed Bridge
LI Yan
Research purposes:The structure of cable - stayed bridge is a complicated spacial composite structure of" tower - cable - beam" . After the laying continuous welded rails,a " tower - cable - beam - track" coupling system is formed under the load effect ,with the complicated mechanical transmission mechanism of continuous welded rails.Taking the Anqing Yangtze River Bridge as an example,a " tower - cable - beam - track" spatial coupling model is established for calculating the longitudinal force of continuous welded rails on long - span cable - stayed bridge to analyze the influences of the different system temperature,the modified elastic modulus of the cable,longitudinal resistance model and the fastening with small resistance for providing the theoretical basis for the design of CWR on long -span cable - stayed bridge.
Research conclusions:The research result shows with the increase of the variation range of the system temperature of the cable - stayed bridge,the expansion - constriction force increases obviously. The modified elastic modulus of cable has less effect on the additional expansion - constriction force and braking force,but has big effect on the additional flexural force. The additional expansion - constriction force calculated by using two different longitudinal resistance models are almost the same,but there is distinct discrepancy in the calculation results of the flexural force and braking force.Application of the fastenings with small resistance can decrease the additional longitudinal force in CWR,so it should be used for the CWR on the side span of the cable - stayed bridge and on the approach bridges on consideration of the engineering cost.
2012 Vol. 29 (10): 42-46 [Abstract] ( 2606 ) HTML (1 KB)  PDF  (492 KB)  ( 142 )
47 Research on Design of Structure of Longitudinal Connected Concrete Base in Turnout Area on Junliangcheng North Station Bridge
XU Ling - yan
Research purposes:The Junliangcheng North Station of the Tianjin - Qinhuangdao Passenger Dedicated Line is located on the Tanguxi Bridge crossing the Beijing - Tianjin - Tangshan Highway. The CRTS Ⅱ slab track with longitudinal connected concrete base is applied in ordinary section and the continuous short rigid frame bridge is applied in the turnout area for laying the seamless turnout on the longitudinal connected concrete base. In order to solve the problem of the complicated loading on structures caused by the longitudinal connected base,it is necessary to build the model for analyzing the loading on the ballastless turnout,the turnout slab and the piers to direct the structure design.
Research conclusions:By the means of building the track - bridge - pier integrated model for the rail,turnout slab,concrete base,girder,pier and abutment,the load bearing characteristic of the longitudinal connected concrete base is obtained. It shows the longitudinal connected concrete base is mainly effected by the temperature force and braking force.Application of stiffness reduction theory and limit state design method for the longitudinal connected concrete base is an effective supplement of the previous study on the concrete basein turnout area on bridge. It can provide the reference to the similar works in the future.
2012 Vol. 29 (10): 47-51 [Abstract] ( 2513 ) HTML (1 KB)  PDF  (643 KB)  ( 128 )
52 Research on Several Problems in Designing the Short Tower Cable - stayed Bridge on Tianjin - Baoding Railway
WU Da - hong,SONG Shun - chen,ZHANG Lei,XU Ping - wei
Research purposes:In order to meet the needs of interchange and gain a good landscape effect,a ballasted short tower cable - stayed bridge with span arrangement of ( 84 + 56 + 32) m is adopted in the proposed Zi Yahe super major bridge on Tianjin - Baoding railway when crossing the flyover bridge in Xi Qingdao Street in the outer ring of Tianjin and the surrounding river. In order to get a reasonable design in mechanics and a good landscape effect,the paper mainly focuses on the optimization and selection of the key characters of the cable - stayed bridge such as structure system,structural dimensions,bearing layout plan,the cable anchorage system and so on.
Research conclusions: (1) The structure system of tower pier and beam consolidation was selected.The advantage of this scheme is its bigger stiffness and better overall performance.(2) By adding a connection pier,the overall stiffness of the structure increased by 20% ,and the dimensions of the cables reduced by 16% . After a comprehensive comparison,an auxiliary pier is added on the large mileage side. ( 3) When structural dimensions of the main beam were optimizaed and selected,the scheme 8 has the best performance and is recommended for this bridge.(4) After a comprehensive comparison,the transverse two - support system plan is selected.(5) The wire pipe saddle is recommended for the bridge because it has more advantages and is more suitable for the requirements of high - speed railway bridge.
2012 Vol. 29 (10): 52-56 [Abstract] ( 2741 ) HTML (1 KB)  PDF  (484 KB)  ( 131 )
57 Analysis of Stability of Long - span Continuous Rigid Frame Bridge with High Pier
WANG Fei,TIAN Shan - po,ZHUO Yi
Research purposes:The highway in western China or the remote region needs to cross over rivers and valleys and passes the regions with complex terrains due to the limitation of topographical condition . For this reason,the long-span continuous rigid frame bridge with high pier becomes more and more and the height of the bridge increases from several decameters to hundreds of meters. With increases of the pier height and the span length,the research on the stability of such kind of bridge is becoming more and more important.
Research conclusions: Taking the long - span continuous rigid frame bridge with( 90 + 168 + 90) m high pier in Shanxi province as the engineering background,the basic principle related to the structure stability is discussed and the stability of the high pier,the stability of the longest cantilever during construction and the stability in complete stage of the bridge are analyzed. From the calculation results it can be seen that for the bridge presented in this paper,the temperature effect has a little influence on the high pier stability,the wind load along the bridge axial direction has the most negative impact on the structure stability in the construction stage of the longest cantilever,and during the complete stage of the bridge,the lane load and the load of the crowded people set on the middle span has the most negative impact on the bridge stability. Furthermore,wind has a little influence and the influence of the temperature effect can be ignored in this stage.The calculation results also show this bridge has a good stability during its construction process and in the complete stage of bridge.The calculation and analysis processes presented in this paper can provide the reference to the similar works.
2012 Vol. 29 (10): 57-62 [Abstract] ( 2615 ) HTML (1 KB)  PDF  (507 KB)  ( 435 )
63 Research on Mechanical Property of Segment of Shield Tunnel During Construction with Three - dimensional Numerical Simulation
ZHANG Peng
Research purposes:The external load system and mechanical properties of segment during construction are big different from the normal use. A large number of engineering experiences have shown that the damaged probability of segment during construction is much higher than that during normal use. This paper researches the key elements of the grouting pressure,jacking force and assembling way during construction with the FEM three - dimensional model for the shield tunnel to provide the reference to the similar works.
Research conclusions: The analysis results show that the segment's mechanical properties along the vertical direction of the tunnel are big different,and the deformation features of each cirque are not the same and big different from that obtained by the conventional mean value continuous model due to the differences of the external load of the segment along the longitudinal direction of the tunnel and the non - continuity of the joint. The grouting pressure and jacking force have apparent effects on the mechanical properties of segment,and the mechanical properties of segment in staggered joint are quite different from the straight joint.Moreover,the staggered joint structure is better than straight joint in the overall stiffness.
2012 Vol. 29 (10): 63-69 [Abstract] ( 2596 ) HTML (1 KB)  PDF  (1010 KB)  ( 392 )
70 Protection Scheme for Shield Tunnel Under - passing West - East Gas Pipeline
WANG Wen - hui
Research purposes:The Shield tunnel between the Qimen North Street Station and the Jinmin East Street Station of the Line 2 of the Suzhou Rail Transit under - passes the west - east gas pipeline. The research was done to analyze the load bearing condition and deformation capacity of the west - east gas pipeline to select a reasonable protection scheme for the purpose of ensuring the safety of the west - east gas pipeline when the shield machine under -passes the pipeline.
Research conclusions: The pile and beam underpinning protection scheme and tracing grouting protection scheme were presented to overcome the problems of the deformation and settlement of the pipeline caused by shield machine under -passing the pipeline. The introduction was given to the advantages and disadvantages of these two schemes. The tracing grouting scheme was chosen. Although,with the tracking grouting scheme,the deformation of the pipeline was not controlled accurately,but the deformation was controlled to the allowable range. In addition,the tracing grouting scheme had the features of using smaller grouting device,occupation of less land,easy operation,low cost and being available for control of the pipeline settlement. Finally,the safety of the pipeline was ensured by adopting this scheme while the tunneling of the shield machine was strictly controlled with the synchronous grouting and informatization construction.The project can provide the reference to the similar works.
2012 Vol. 29 (10): 70-74 [Abstract] ( 2574 ) HTML (1 KB)  PDF  (604 KB)  ( 315 )
75 Discussion on Grade Division of Railway Tunnel Gas
ZHANG Gui - tong
Research purposes:It is very difficult to grade the gas of railway tunnel during the investigation because there are many influence factors to be involved in in the construction with the big dispute and poor operability.Therefore,it is worth doing the further study on how to grade the tunnel gas scientifically and reasonably to guarantee the construction and operation safety,save the construction cost,enhance the the construction efficiency and shorten the construction period. Combined with the construction practice of a railway gas tunnel,the analysis of the relation between the emission volume and concentration of gas and the construction safety was made and the new idea was presented on the base of using information on gas detection.
Research conclusions: At present,according to the " Technical code for Railway Gas Tunnel" ,the absolute gas emission volume of 0.5 m3/ min is regarded as the boundary standard for grading the high gas and low gas.This standard is too low so that some tunnels that could be built with the standard of the low gas are regarded as the high gas tunnel.In this way,the construction investment goes to waste by taking some unnecessary measures,such as explosion -proof and reinforcing the tunnel lining.On the premise of meeting the ventilation requirement,it is more appropriate to regard the gas concentration of 0.5% in the return air flow as the the standard for grading the high gas and low gas.
2012 Vol. 29 (10): 75-79 [Abstract] ( 3476 ) HTML (1 KB)  PDF  (497 KB)  ( 224 )
80 Measures for Lightning Protection for OCS of High - speed Railway and Proposals
SHAO Li,WANG Guo - liang,BAI Yi - feng
Research purposes:At present,the high - speed railways in China cross the different geographical zones,but there is no backup system for them. Therefore,once the permanent damage caused by lightning strike happens,the power supply will fail to work. According to the regulations,the independent lightning conductor is set up only for the overhead contact line system ( OCS) in strong lighting area. But the OCS of high - speed railway in China is often built in heavy lighting area without lightning conductor,so it is easily stroke by lightning. To guarantee the high reliability of OCS of the high - speed railway in China,it is proposed the measures for lightning protection should be taken for OCS of the high - speed railway. Based on the theoretical calculation and analysis,the study is done on the measures for lightning protection for OCS of the high - speed railway.
Research conclusions: Considering that the lightning strike to the high - speed railway happens frequently and based on the calculation and analysis of the flashover of the OCS caused by lightning,it is proposed that PW ( protection wire) should be arranged on the top of the pole and the positive feeder should be installed with compound insulator in Auto -Transformer ( AT) power supply,and at the same time,the arrester and PW should be grounded to ensure the normal work of the lightning protection devices. It is also proposed that the indexes,such as the lightning withstand level of catenary and the switch - off rate or the failure rate,should be improved.
2012 Vol. 29 (10): 80-83 [Abstract] ( 3250 ) HTML (1 KB)  PDF  (287 KB)  ( 868 )
84 Study on Application Flexible Stayed Cable in Supporting Spatial Frame Roof of Railway Station Building for Remodeling
GU Xue-dong,GAO Xi-liang,LU Zhao-hong,YAN Wei,YANG Meng-gen
Research purposes:In order to speed up the construction process,cut the construction cost,reduce the influence of remodeling the building on the social environment,reflect green environment protection and remain the style and features of the old building,sometimes it is necessary to remodel and reinforcing some parts of the substructure of the existing station building without demolishing the roof cover of the building. The research was done on the remodeling the substructure of the Chongqing North Railway Station with the support method of the flexible stayed cable according to the feature of the relatively light weight of the spatial frame roof of the building.
Research conclusions: (1) According to the light feature of the steel frame roof,by using the flexible tensile cable method,the active loading was conducted to the arc beam of the support base of the steel frame for controlling and adjusting the displacement of steel frame base of the roof and with the monitoring means and feedback design,it could control the internal force of the frame member effectively and avoid the demolishing and reconstruction works for the steel frame structure of the roof.In this way,the construction time of four months and the construction cost of 5.5 million Yuan could be saved.(2) Compared with traditional column support method,the 6. 45 million Yuan could be saved by using this method,with more concept of the green environment protection.(3) When needing to remain the historical style and features of the old building or consider the social influence,but it had no way to demolish the steel frame structure of the roof,the flexible tensile cable method could be used for remoulding and reinforcing the substructure of the frame on the premise of remaining the frame structure of the roof.
2012 Vol. 29 (10): 84-89 [Abstract] ( 2542 ) HTML (1 KB)  PDF  (908 KB)  ( 80 )
90 Interaction between Deep Foundation Pit and Arched Structure and Its Protection
YANG Meng - gen,YU Ji - tao
Research purposes:The calculation and analysis were made with the stratum structure model and load structure model to control the deformation of arched structure near the large deep foundation pit,and the rational protection measures and the support system were chosen for the deep foundation pit near the arched structure.
Research conclusions:The monitoring data showed that by control of the displacement of the inclined arched pile foundation of the terminal,the good effect achieved to make the deep foundation pit engineering in safe and stable state.It proved the rationality and stability of the design. For the nearby structure,the compressed deformation of the soil could be redeuced by reinforcing the foundation to achieve the obvious effect of controlling the deformation of the structure,and the transmission of the horizontal thrust into the support system for foundation pit could be cut by the insulation pile to get the good control effect of the deformation of the foundation pit.It was necessary to establish the comprehensive and rigorous monitoring system during construction so that the monitored data could be feedback to direct the construction.It not only guaranteed the safety and stability of the foundation pit,but also controlled the influence on the nearby environment and reduced the influence of the construction on the environment around the inclined arched foundation of the terminal.
2012 Vol. 29 (10): 90-94 [Abstract] ( 2706 ) HTML (1 KB)  PDF  (698 KB)  ( 95 )
95 Application of Support Structure of Double Row Pile in Construction of Comprehensive Traffic Hub
ZHANG Ke - yi,YU Ji - tao
Research purposes:The article aims to combine the Hub Project,for the special geological conditions of the project in which the city landfill area and project their own characteristics,to explore how to use the double pile retaining structure in the typical project.
Research conclusions:The relative parameters for design of the double - row pile was obtained by conducting the construction practice. Compared with the single - row pile,the structure of the double - row pile could effectively control the side - directional deformation of the foundation pit and reduce the bending moment of the pile to make the pile's bending moment more reasonable. The research on the computational model on consideration of the interaction between the pile and soil showed the horizontal shift of the soil in the influencing range gradually increased with increase of the excavation depth,but the influence of the excavation of the foundation pit on the horizontal shift of the soil gradually reduced with increase of the excavation depth.
2012 Vol. 29 (10): 95-100 [Abstract] ( 2568 ) HTML (1 KB)  PDF  (713 KB)  ( 88 )
101 Study on Track Design of Line 1 in Overlapping Segment of Shenzhen Metro
LI Lian - sheng
Research purposes:In the track design of urban metro,the existing structures and the underground engineering,etc. set a limit to the project design. Aiming at the unfavorable factors of crowded structures and complicated underground piles countered in the section between Luohu and Grand Theater of Line 1 of Shenzhen metro,the study was done on the more appropriate track arrangement to solve this problem and provide the experience to thesimilar works.
Research conclusions:(1) In the section between Luohu and Grand Theater of Line 1 of Shenzhen metro,it was the first time in China to use the right track and the left track with the arrangement of the up - down overlapping. (2) Compared with the traditional arrangement,such track overlapping arrangement could reduce the space occupation by 25 - 50% and enhance the freedom of the track alignment to solve the problem of the track laying in the crowded space. (3) The lateral space was occupied least by using the track overlapping arrangement and it effectively kept away from the building foundation. (4) If the three - storey side station was used,it was inconvenient for the station management and passenger travel and made the gradient in the track switching section having the " scissors difference" with the big gradient of the right and left tracks and it was unfavorable for the operation. (5) The switching section was inappropriate to be over long because of the complicated line-shape and difficult construction. Otherwise,after service,the tunnel settlement would happen because of the liquefaction of the soil between the tunnels. (6) When designing such track,the attention would be paid to the track 's buried depth,parallel and overlapping switching sections,switching section and difference in elevation between the tracks in the overlapping section,and the communication and cooperation would be conducted between the persons of the architecture and tunnel closely to achieve the economic benefits and reduce the construction risk.
2012 Vol. 29 (10): 101-105 [Abstract] ( 2654 ) HTML (1 KB)  PDF  (1131 KB)  ( 392 )
106 Geotechnical Engineering Investigation for Deep Foundation Pit of Line 3 of Kunming Rail Transit and Its Evaluation
LIU Wei,HE Jia - liang,YANG Wen - hui,DAI Wei
Research purposes:The line 3 of Kunming rail transit crosses the downtown of Kunming from east to west.The engineering geological condition,hydrogeologic condition and surrounding environment are complex. By using the comprehensive survey technologies of the engineering geological mapping,drilling,geophysical exploration,testing,in - situ tests,the engineering geological condition and the hydrogeologic condition of the deep foundation pit for the stations of the Line 3 of Kunming rail transit were investigated. The analysis and evaluation were made for the stability of the site,the structure style of the exterior - protected construction for the foundation pit,the drainage scheme,the anti -floating and anti - raising of pit base,the treatment of the base and the construction of foundation pit.
Research conclusions: (1) The Line 3 of the urban rail transit in Kunming crosses the Kunming downtown featured with the complicated and unfavorable engineering geological condition and hydrogeological condition,such as the multiple rock - soil layers,rich underground water,sandy soil liquefaction,karst,shallow natural gas,filling soil,soft soil,the special rock and soil and poor regional stability.(2) Based on the comprehensive analysis of the geological condition and surrounding environment of deep foundation pits,the open cut method was used for the foundation pit and the top-down method was used for the section where was limited locally by the transportation condition.(3) The diaphragm wall was available for the interior support and sealing up for the deep foundation pit in the basin with the support of the concrete and steel pipe. The drainage ditch and the collecting well were installed in the foundation pit along with the artificial pumping and draining. The mixing pile and filling were used for the pit base to meet the requirement of anti-float and anti-raising.(4) The the slope excavation could be conducted with the support of the soil nail wall and filling to the pit base for the foundation pit in the essentially level area because of its good engineering geological condition without development of underground water.
2012 Vol. 29 (10): 106-110 [Abstract] ( 2636 ) HTML (1 KB)  PDF  (256 KB)  ( 348 )
111 Research and Analysis of Scheme for Ventilation and Air Conditioning System for Dalian Subway
XU Chi,LIU Ying - jie
Research purposes:According to the weather characteristics of Dalian and its specific situations of the subway,the schemes for ventilation and air conditioning system were researched and analyzed.The scheme and operation mode of ventilation and air conditioning system were selected on the base of the calculation results obtained with SES software for simulation of subway environment.
Research conclusions: The mechanical ventilation system with open and close operation mode was used for the Dalian subway.The ventilation to the station and sectional tunnel and cooling temperature were achieved by making full use of natural cooling source and the air produced by piston in order to reduce the operation time of the ventilation device as much as possible and save the energy.According to the high air humidity of Dalian in summer,the air pumped into the public area of the station was dehumidified in the hottest months to make the environment more comfortable for passengers.The ventilation system for the station and ventilation system for sectional area equipments were interchangeable. And the operation modes could be switched according to the different conditions to enhance the unilization ratio of the device and reduce the .first investment and maintenance cost of the device.
2012 Vol. 29 (10): 111-114 [Abstract] ( 2544 ) HTML (1 KB)  PDF  (441 KB)  ( 212 )
115 Passenger Transfer between Urban Rail Transit and National Railway Terminal
YIN Jing
Research purposes:This paper analyzes the scheme for the passenger transfer between the Northern Xi'an Station of national railway terminal and metro station and gives some ideas on the connection plan and passenger transfer scheme between the urban rail transit and national railway terminal for providing the reference to the similar works.
Research conclusions: From the design practice of the North Xi'an Passenger Station of the comprehensive transportation terminal and the analysis of the characteristic of typical national railway terminal,it can be seen for such comprehensive transportation terminal,it is necessary to make overall planing and do the research on project interface and operation management in the stages of the design,construction and operation. Moreover,the station of the urban rail transit should be installed according to the passenger transfer convenience,the scale of stations,the layouts of the station building of the national railway,the square layout and the layout of the metro facilities.
2012 Vol. 29 (10): 115-119 [Abstract] ( 2569 ) HTML (1 KB)  PDF  (598 KB)  ( 198 )
120 The Application of AHP in the Bid Evaluation Index Weight of the Railway Construction
ZHAO Hong - xing
Research purposes:The bid evaluation system of Chinese railway construction projects has a large number of quantitative and qualitative indexes,and the weight division of the indexes is complicated.While in the daily bid evaluation project of the railway construction,there is not a scientific and rational way to divide the weight.Through this study,we intend to establish a reasonable method in the bid evaluation index weight of the Railway Construction.
Research conclusions: AHP is suitable for evaluating the target system with hierarchical staggered evaluation index,which objective is difficult to describe in quantity. It is a simple multiple criteria decision - making method which has qualitative and quantitative analysis particularity. In the railway construction project,we have solved the problem by applying the analytic hierarchy process to determining the weights of the bid evaluation,so that the index weight is more scientific and reasonable.
2012 Vol. 29 (10): 120-123 [Abstract] ( 2619 ) HTML (1 KB)  PDF  (317 KB)  ( 156 )