1 DECISION OF EXPANDING COEFFICIENT IN RAILWAY NETWORK PLANNING
ZHENG Yi
In the railway network planning, effective information for the project decision cannot be provided because it is hard to get the expanding coefficient. This paper first assort the topography of different district with the fuzzy classification, and then the expanding coefficient is gotten by the model of linear regression, so we can get more accurate information for the network planning.
2001 Vol. 18 (3): 1-2 [Abstract] ( 2523 ) HTML (1 KB)  PDF  (109 KB)  ( 133 )
3 EXPLORATION ON CONSTRUCTION OF XICHANG-ZHAOQING RAILWAY PASSAGE CONNECTING SOUTHWEST CHINA AND SOUTH CHINA
XU Ding-cheng
Based on the specialties of the economic development and the layout of the railway networks in China a consideration about constructing the Xichang-Zhaoqing railway passage has been proposed. The basic routing of the Xichang-Zhaoqing railway passage and its role paid on the railway networks in China are introduced. It is suggested that the construction of the Xichang-Zhaoqing railway passage may be devided into three stages: (1) Construction of Liuzhou-Zhaoqing trunk line. (2) Construction of Xichang-Liupanshui trunk line. (3) Construction of Anshun-Hechi trunk line. The construction of Xichang-Zhaoqing Railway will make the structure of railway networks more reasonable, becoming an important West-Fast railway passage connecting Cheng-Kun, Gui-Kun, Qian-Gui, Chuan-Qian, Jiao-Liu, Xiang-Gui, Jing-Guang, Guang-Mao, Nei-Kun, Luo-Zhan railway trunk lines, etc. The oversea passage from Southwest China to Zhujiang River Delta will be opened. It is advantageous to develop and utilize the rich natural resources and mineral resources in Southwest region. There are very important political, economic and social meanings for developing economics in West China, to implement the great developing West China, as well as to decrease the differences between the West China and the East China.
2001 Vol. 18 (3): 3-6 [Abstract] ( 2512 ) HTML (1 KB)  PDF  (114 KB)  ( 133 )
7 COMPREHENSIVE REVIEW ON CONSTRUCTION OF RAILWAY PASSAGES CONNECTING NORTHWEST & SOUTHWEST CHINA WITH EAST & SOUTH CHINA
JIANG Hong
In order to implement national strategic plan of the great developing West China and the "two overall situation" policy, the construction of railway passages connecting closely the West China with the Middle & Fast China has become a particular problem which was explored by scholars and experts in the recent times. At first, the proposed suggestions and schemes concerned with above aspect arc introduced in detail in this paper. Then, by analysis and induction, a comprehensive tentative plan has been proposed as follows: based on the structure of railway networks of the "eight vertical and eight horizontal trunk lines”, "one horizontal, two vertical and five inclined trunk lines" should be increased to the national railway networks. Finally, it is suggested that the implementation of national 120 000 km railway plan should be divided into three stages, i. e. the year 2010, 2030 and 2050.
2001 Vol. 18 (3): 7-11 [Abstract] ( 2484 ) HTML (1 KB)  PDF  (163 KB)  ( 103 )
12 TILTING TRAINS-ADVENTAGEOUS SELECTION OF RAISING SPEED ON EXISTING RAILWAYS
LI Shi-wu
During the serious competition of passenger traffic market in recent two years, the raising speed on existing railways was the key for railways to convert the failure into success. The specialties of raising speed by using tilting trains on existing railways abroad, as well as the operation achievements by import the “New Speed" (X2000) titling trains running on the Guang-Shen Railway, are described. Finally, it is suggested that "the feasibility research of applying the tilting trains on Long-Hai and Jing-Guang Railway Lines" should be established and the operation tests by renting the tilting trains should be put forward also.
2001 Vol. 18 (3): 12-15 [Abstract] ( 2679 ) HTML (1 KB)  PDF  (152 KB)  ( 88 )
16 ELEMENTARY TALKING ABOUT RAISING SPEED ON EXISTING RAILWAYS IN MOUNTAINOUS REGIONS
SU Xiao-qin
The consideration which has been proposed in this paper for raising speed on existing railways in the mountainous regions should be divided into two stages, i. e. up to design speed, and then raising speed. The optimum selection for raising speed of railways in mountainous regions by using tilting trains is described in detail. While, the necessity to put forward the market control and regulation for rising speed of railways in mountainous regions are emphasized also in this paper.
2001 Vol. 18 (3): 16-17 [Abstract] ( 2532 ) HTML (1 KB)  PDF  (108 KB)  ( 59 )
18 THINK ABOUT QUESTIONS CONCERNED WITH ROADBED OF DING-HU HIGH SPEED RAILWAY
YOU Chang-long
The article discusses some questions concerned with the roadbed engineering, which may be occurred in construction or in transit of Jing-Hu high speed railway, such as the liquefaction of sandy soil, etc. The research and exploration of these problems will be useful to the construction of the high speed railways.
2001 Vol. 18 (3): 18-20 [Abstract] ( 2491 ) HTML (1 KB)  PDF  (158 KB)  ( 133 )
21 STUDY OF TRAIN DERAILING ON HIGH-SPEED RAILWAY BRIDGE
LIN Yu-sen, XIN Li-hua, ZHANG Yun-bo
Based on the study method about bridge structure dynamics and vehicle dynamics, this paper studies the reasons of train derailing on the high-speed railway bridge, such as the wheel-rail force, the derailment coefficient and the load decrement rate of wheel weight. By the example of the bridge on the Qin-Shen special passenger traffic railway line, the calculation has been put forward.
2001 Vol. 18 (3): 21-23 [Abstract] ( 2611 ) HTML (1 KB)  PDF  (161 KB)  ( 366 )
24 TRACK TRANSPORT IN AMERICAN CITIES
LI Hong
There are huge track systems in American cities with more than one million populations, which are classified as three kinds: commuter rail, light rail, heavy rail. Compared with other transport modes, railways have many advantages, such as: smaller energy consume, less pollution, faster speed, lower price, more safety, and without jam etc. With jams are becoming worse and worse in most cities, urban railways is developing steadily in recent years. Federal and Local Governments have noted the advantages of railways. They have set up special organizations to manage railways, established funds to support its development, and compensated some capitals to its operations each year.
2001 Vol. 18 (3): 24-26 [Abstract] ( 2535 ) HTML (1 KB)  PDF  (124 KB)  ( 151 )
27 INFLUENCES OF NO.1 LINE OF TIANJIN SUBWAY ON THE CITY'S ECOLOGIC ENVIRONMENT
ZHANG Lu, ZHAO Shu-fang, ZHENG Qi-pu, XU Jian-jun
The construction of No.1 line of Tianjin Subway will improve the current situation of city's traffic to a great extent, it exists an important meaning to promote the construction of Tianjin City and to push its economic development forward. This engineering work will produce somewhat influences on city's ecologic environment during construction and operation periods. The positive and passive influences of the subway engineering works on the city's ecologic environment arc analyzed in detail concerned with the following aspects, such as the noise, vibration, dusk raising and soil erosion during the construction period, and pushing the economic development forward, relaxing traffic on ground level, improving environmental quality during the operation period, etc.
2001 Vol. 18 (3): 27-29 [Abstract] ( 2438 ) HTML (1 KB)  PDF  (150 KB)  ( 158 )
30 DEVELOPING RAIL TRANSIT TO PROMOTE URBAN SUSTAINABLE DEVELOPMENT
TAN Jing
Nowadays, the urban rail transit in China has mainly three types: the large capacity subways, the medium capacity light-rail traffic and the suburban railways. The paper analyzes the problems existing in the national urban traffic and the developing tendency of traffic in the large cities. The advantages of urban rail transit arc expounded, and the suggestions to enhance the planning of urban rail transit are proposed, so as to promote the sustainable development of the large cities in China.
2001 Vol. 18 (3): 30-32 [Abstract] ( 2499 ) HTML (1 KB)  PDF  (136 KB)  ( 188 )
33 RAILWAY SUBGRADE GENERAL CAD SYSTEM
LIU Zhong-jie
The paper introduces the "railway subgrade general CAD system" which was an essential science-technology developing item of the Ministry of Railways in the “Ninth Five-year” period. The system may be considered as an important integrated software for the integration of the railway survey and design. The system makes the subgrade computer aided design technique carrying forward to a completely new level based on advanced software technology and quite new design theory and conception.
2001 Vol. 18 (3): 33-37 [Abstract] ( 2519 ) HTML (1 KB)  PDF  (156 KB)  ( 103 )
38 SIMULATION OF LATERAL IMPACT VIBRATION OF GUARD RAIL
REN Zun-song, ZHAI Wan-ming, MIAO Long-xiu, SUN Shou-guang
The guard rail plays an important role of ensuring the vehicle passing through the turnout zone successfully. Based on a vehicle/turnout spatial interaction model, setting the No.12 speed-raised single-way turnout as an example, a method which the flangeway clearance and the wheel-rail dynamical clearance are considered, is presented in this paper to calculate the lateral impact force acting on the guard rail, and the dynamic responses of guard rail are simulated while the vehicle passing through the turnout zone.
2001 Vol. 18 (3): 38-41 [Abstract] ( 2510 ) HTML (1 KB)  PDF  (187 KB)  ( 200 )
42 RESEARCH ON METHODS TO REDUCE INFLUENCE OF VIBRATION AND NOISE OF TRAIN
BU Jian-qing, GAO Yong-li, YUAN Xiang-rong
Based on the analyses of the vibration and noise of the trains and its propagation law, the methods for reducing the influence of them are put forward in this paper.
2001 Vol. 18 (3): 42-47 [Abstract] ( 2539 ) HTML (1 KB)  PDF  (207 KB)  ( 607 )
48 SCHEME OPTIMIZATION ON DESIGN OF 42M TIE BAR ARCH FOR HOUKOU EXTRA-LONGSPAN BRIDGE ON XI'AN-ANKANG RIALWAY AND ITS CONSTRUCTION
LIANG Xue-ming
The full view of the Huokou extra-longspan bridge on the Xi'an-Ankang Railway has been introduced in this paper. The selection situations of the 42m tie bar arch and its structural design arc introduced briefly. While the analyses of advantages and shortcomings of different construction schemes and the optimized construction scheme are introduced emphatically. The optimization analysis of the construction schemes may be used as reference for the design and construction units.
2001 Vol. 18 (3): 48-50 [Abstract] ( 2536 ) HTML (1 KB)  PDF  (128 KB)  ( 112 )
51 RESEARCH ON SIMPLY SUPPORTED BEAMS WITH EQUAL SPAN ON HIGH SPEED RAILWAYS
TIAN Jie, XU Ke-bin
The bridge's dynamic features and train's running comfort under resonant speed of simply supported beams with equal spans are analyzed. Through calculation, we know that the simply supported beams with equal spans and the trains will have one to two resonant speeds during high speed, the bridge's dynamic factors between different spans have little change, and the train's running comfort differs a little during no.1 to no.4 while, from no.5 span, it becomes stable. This means that the railway simply supported beams with equal spans arc suitable used for extra-long bridges.
2001 Vol. 18 (3): 51-55 [Abstract] ( 2520 ) HTML (1 KB)  PDF  (185 KB)  ( 69 )
56 EXPLORATION ON JACKING TECHNIQUE OF RAILWAY SKELETON FRAME BRIDGE UNDER INTENSIVE TRAFFIC INTERFERENCE AND ADVERSE GEOLOGIC CONDITIONS
LI Jian-jun
Skeleton frame bridge jacking method is a frequently adopted practice in the construction of existing railway lines. It has been extensively applied in railway engineering construction. This thesis probes into the treatment of engineering process on the Beijing-Guangzhou Railway, for which the longitudinal uplift girder is under the complicated pressure condition and with great span. The construction on the Beijing-Guangzhou Railway is under such unfavorable conditions: great interference from the intensive traffic and high speed of trains, adverse geologic conditions in terms of the high subterranean water pressure in constructions on existing river channels and the drift sand interference in pile constructions, etc. and the difficulties with intersected trackages. The thesis is supposed to provide some experiences on the engineering construction under adverse geologic conditions and complicated pressure status, and serve as a reference for safety management for the construction on existing railway lines.
2001 Vol. 18 (3): 56-59 [Abstract] ( 2452 ) HTML (1 KB)  PDF  (152 KB)  ( 79 )
60 EXPLORATION ON COMPOSITE TECHNIQUE OF RECONSTRUCTING STRUCTURAL VIADUCTS AT ORIGINAL POSITION OF EXISTING BRIAGE AND CULVERT ON RAISING SPEED MAIN RAILWAY LINES
LV Zhi-ming
The composite technique by adopting the composite structure, continuous jacking, controlled blasting, strengthening the military beams, etc. to implement the removing of existing bridges and culverts, and to reconstruct structural viaducts at their original positions, are introduced in this paper. By applying these techniques, excellent economic and social benefits have been obtained.
2001 Vol. 18 (3): 60-63 [Abstract] ( 2495 ) HTML (1 KB)  PDF  (122 KB)  ( 90 )
64 SCHEME DESIGN AND APPLICATION OF FULL SPACE SUPPORTS FOR CONSTRUCTION IN SITU OF PRESTRESSED CONCRETE CONTINUOUS BOX BEAMS
HE Ying-long, KONG Xiang-ping
The bearing system of full space supports is a multi-fulcrum bearing system. The loads arc scattered through multi-points and transmitted to the foundation. Therefore, it is required that the foundation should have sufficient bearing capacity, so as to render the settlement amount of the supports controlled within allowable scopes during the construction procedure of casting concrete in situ. At the same time, even settlement is required for all fulcrum points to prevent cracks produced on beam's body due to uneven settlements. The technical analyses and summaries concerned with the design, construction and applications of the full space supports arc put forward in this paper.
2001 Vol. 18 (3): 64-68 [Abstract] ( 2483 ) HTML (1 KB)  PDF  (207 KB)  ( 192 )
69 PROPERTY TEST AND MIXTURE RATIO DESIGN OF STEEL FIBER SHOTCRETE FOR WANJUNHUI TUNNEL
LIU Hui, SU Bo
The application of steel fiber shotcrete as permanent lining had been utilized for the first time by the Second Railway Engineering Bureau. Not only the construction speed was quickened, but also the construction cost was reduced. The anti-crack property, ductility, toughness and anti-shock properties were improved remarkably. It is a new-type composite materials used by the Bureau, having important meaning in the application scope of the new materials.
2001 Vol. 18 (3): 69-78 [Abstract] ( 2511 ) HTML (1 KB)  PDF  (271 KB)  ( 128 )
79 CONSTRUCTION TECHNOLOGY OF “UNDERGROUND EXCAVATION UNDER SHALLOW COVER” FOR AN UNDERGROUND PASSAGE TUNNEL WITH HIGH WATER-BEARING SANDY LAYER ACROSS AN URBAN STREET
DING Rui
This paper introduces the construction method of “underground excavation under shallow cover” for an underground urban street passage tunnel in sands containing a large volume of water. For the construction of the whole tunnel, the “CRD” method is used principally, of which some supplementary construction methods are employed. For example, the technology of low-pressured injection with dense pipes is employed for silly ground, and “TSS” grouting consolidation technology is employed for saturated water-beaning sands.
2001 Vol. 18 (3): 79-84 [Abstract] ( 2506 ) HTML (1 KB)  PDF  (240 KB)  ( 208 )
85 NON-DESTRUCTIVE TESTING AND ITS APPLICATION IN TUNNELS
WANG Wei, XIANG Yan-nian
There are almost 4000 railway and highway tunnels in China. Through operation for many years, a lot of tunnel defects occurred frequently. It is necessary to apply the advanced non-destructive testing for supervision and protection of the tunnels, being a tendency in recent years. In this paper, the methods of non-destructive testing in home and abroad are induced and compared, and their applying conditions in China are also introduced.
2001 Vol. 18 (3): 85-88 [Abstract] ( 2476 ) HTML (1 KB)  PDF  (168 KB)  ( 113 )
89 EXPLORATION ON OPTIMIZATION OF ADIT SCHEME FOR SIZEHE TUNNEL AND ITS CONSTRUCTION SITUATION
CUI Zhen-qun
The optimization of scheme before the construction is aimed at to avoid the losses in construction caused by design reasons. It was the necessary work which must be put forward before starting all engineering items for the Shenmu-Yan'an Railway. Before the construction of Sizehe Tunnel with the situations of short construction period,low class of surrounding rock, high quality requirement and low unit bidding cost of foreign investments,a scientific and reasonable adit scheme was optimized so as to render the very intense construction period becoming an under-controlled situation. The procedures of the optimization of the adit scheme for the Sizehe Tunnel are described in this paper, which may be provided as reference for constructing the similar engineering projects.
2001 Vol. 18 (3): 89-91 [Abstract] ( 3127 ) HTML (1 KB)  PDF  (164 KB)  ( 125 )
92 "STRUCTURE DEPTH"AND ITS RELATION WITH FISSURE WATER IN BASIC ROCK AT MOUNTAINOUS REGIONS
XU Zeng-rong
Based on the analysis and description of vertically-layered property of the fault, the conception of "structure depth" has been proposed for the first time, which may be used to describe the position in vertically-layered section for certain place of the fault. It is pointed out that the "structure depth" is also an important factor to determine the characteristics of the fault and its hydrogeological conditions, as well as the property, era, rock fades and scale of the fault.
2001 Vol. 18 (3): 92-95 [Abstract] ( 2523 ) HTML (1 KB)  PDF  (137 KB)  ( 167 )
96 GEOLOGIC ROUTE SELECTLON FOR LUSHAN TUNNEL OF XI'AN-NAN-JING RAILWAY
WANG Lian-ping
Lushan Tunnel is the controlling section for route selection in Caopingjie saddle of the Xi'an-Nanjing Railway. The terrain and geology are very complicate, while the geology controls the route selection. In the light of the working practice in geology and combined with the characteristics of engineering geology in this district, this article approaches the main problems on geology and the effect of these problems in route selection.
2001 Vol. 18 (3): 96-99 [Abstract] ( 2544 ) HTML (1 KB)  PDF  (138 KB)  ( 97 )
100 STUDY AND CURE ON CHARACTERS OF FAULTAGE IN GONGBOXIA HYDROPOWER TUNNEL
WANG Qi, LI Zhong
The text has studied the geological impresses and mechanics qualities of the faultage in Gongboxia hydropower tunnel which has arisen the collapse. It has found the reasons and symbols of the faultage, and put forward some prevention and cure steps.
2001 Vol. 18 (3): 100-103 [Abstract] ( 2506 ) HTML (1 KB)  PDF  (147 KB)  ( 96 )
104 A NEW CONSTRUCTION METHOD OF OVERHEAD CATENARY SYSTEM (OCS)
SHAAN Zhen-gang, ZHANG Yan, LI Da-gang
By analyzing the construction organization (which includes the construction arrangement, the construction form and the controlling rules for the labor, material, equipment and other resources) in small section, we introduced a new OCS construction method of continuing work in small section and circulated constant work in whole project.
2001 Vol. 18 (3): 104-105 [Abstract] ( 2553 ) HTML (1 KB)  PDF  (86 KB)  ( 102 )
106 STUDY ON SAFE CONSTRUCTION MEASURES OF CATENARY FOR PREVENTION OF ELECTROMAGNETIC INDUCTIVE INFLUENCE
LI Xue-lin
Discussion on protective measures has been put forward for safe construction of catenary through analyzing the voltage and current distribution in conduct wines influenced by electromagnetic induction, so as to ensure personnel safety of workers.
2001 Vol. 18 (3): 106-109 [Abstract] ( 2491 ) HTML (1 KB)  PDF  (134 KB)  ( 88 )
110 JWF-16A HYDRAULIC CATENARY ERECTING INSTALLATION FOR LAYING TRANSMISSION LINES AND WIRES WITH CONSTANT TENSION
YUAN Yu-sen
Several aspects concerned with the structure, design principles, main technical indexes, etc. of the JWF-16A hydraulic catenary erecting installation for laving transmission lines and wires with constant tension, which was newly developed in China by ourselves, are expounded in detail in this paper. This installation can fulfill the requirement of laving transmission lines and wires with constant tension by selecting an arbitrary value of tension within 0~5kNduring the construction of catenary.
2001 Vol. 18 (3): 110-112 [Abstract] ( 2485 ) HTML (1 KB)  PDF  (122 KB)  ( 102 )
113 SAFETY OF BLASTING EQUIPMENT UNDER THUNDER ENVIRONMENT IN PLATEAU
GU Yi-cheng, YANG Nian-hua
Safety of blasting equipment under thunder environment in the plateau should be regarded as great importance in the construction of Qinghai-Tibet railway line. Safety threat from thunder mainly refers to the direct lightning strike and electromagnetic induction and potential hazard of static electricity induction of the blasting network induced by thunder. Based on related safety rules of blasting, this paper raises measures and suggestions in terms of construction safety for the temporary storage, transport and operation of the blasting equipment under thunder environment in the plateau.
2001 Vol. 18 (3): 113-115 [Abstract] ( 2478 ) HTML (1 KB)  PDF  (142 KB)  ( 75 )
116 DEEP BORING GROUTING TECHNOLOGY APPLIED IN CONSTRUCTING TUNNELS WITH SOFT SURROUNDING ROCKS
WANG Guang-zhong, WANG Li-ping
In the construction of tunnels with soft surrounding rocks, the most difficult problem encountered is the poor stability of the rocks and the damage of the surrounding rocks by water. This paper describes the technology of enforcing the stability of the rocks and removing the potential water damage by applying deep boring grouting method to achieve the pilot consolidation of the rocks. It is well aimed at the construction of tunnels with soft surrounding rocks.
2001 Vol. 18 (3): 116-119 [Abstract] ( 2500 ) HTML (1 KB)  PDF  (185 KB)  ( 108 )
120 ANALYSIS OF WORKING EFFICIENCY IN TUNNEL AND COSTRUCTION TECHNOLOGY OF FULL FACE TUNNEL BORING MACHINE
GAO Xiao-dong, SHA Ming-yuan
The article introduces the construction situations of No.1 Tauhuapu Tunnel, the condition of geology, the main technical specifications of TB880E tunnel boring machine and the temporary supporting pans equipped for the rocks every factors which could influence the efficiency of working in broken zone in No.1 Tauhuapu Tunnel arc analyzed in detail. The article expounds also the improving production process, method of rock supporting process and the improving partial structure, disposition and adjusting construction technology of working control system in maintenance of boring machine and its notable effect in application.
2001 Vol. 18 (3): 120-124 [Abstract] ( 2490 ) HTML (1 KB)  PDF  (226 KB)  ( 136 )
125 EXPERIMENTAL RESEARCH AND ANALYSIS ON BREAKING SURFACE OF REINFORCED EARTH RETAINING WALL
LI Guo-qiang
The research and analysis of model tests have been put forward on the breaking surface of the reinforced earth retaining wall under the initiative limiting state, and the position and shape of these breaking surfaces arc obtained. It is suggested that the breaking surface on the back of the back of the reinforced earth retaining wall should be repaired.
2001 Vol. 18 (3): 125-128 [Abstract] ( 2504 ) HTML (1 KB)  PDF  (193 KB)  ( 127 )
129 TREATMENT ON EARLY SOLIDIFIED ACCIDENTS OF CONCRETE IN JINTIAN-YITIAN SECTION OF SHENZHENG SUBWAY
WANG Jun-min
The construction schemes and the early solidified accidents of concrete during construction occurred in the Jintian-Yitian Section of the Shenzhen Subway arc introduced in this paper. The successful treatment methods for these early solidified accidents are expounded also.
2001 Vol. 18 (3): 129-131 [Abstract] ( 2522 ) HTML (1 KB)  PDF  (117 KB)  ( 137 )
132 RESEARCH AND PRACTICE OF CLAMP III’S DEFORMED CONSOLIDATION
ZENG Zhao-lin
Adopting the malposition theory among the metal crystal, the deformed consolidation happening in champ III has been described in this paper. According to the analysis of strength and the past processing on producing clamp III, after being pre-pressed, the remained distortion in clamp III is reduced and the strength of clamp could be ensured. It is good to advance the quality of high speed and heavy haul railways.
2001 Vol. 18 (3): 132-134 [Abstract] ( 2567 ) HTML (1 KB)  PDF  (125 KB)  ( 149 )
135 SELECTION AND MANAGEMENT ABOUT THE CONTRACTS OF UNDERGROUND ENGINEERING
GAO Xin-cai, LIU Wei-ning
The paper introduces the properties and practicable forms about the contracts of underground engineering, and expounds in detail the principle of sharing of risks and the attitude of construction claims to make people paying more attention to them.
2001 Vol. 18 (3): 135-138 [Abstract] ( 2480 ) HTML (1 KB)  PDF  (130 KB)  ( 101 )
139 RESEARCH ON SUSTAINABLE DEVELOPMENT OF RAILWAY CONSTRUCTION ENTERPRISES
LIU Ying-hua
The essence of knowledge economy is science and the core of it is talent. The development and utilization of human resources are the basic guarantee for sustainable development of enterprises. This essay analyzes the status and reasons resulted in brain drain in the railway construction enterprises, and put forward the methods and countermeasures of how to train, use and attract talents so that the railway construction enterprises have the initiative in the talent competitions and provide reliable support for sustainable development of the enterprises.
2001 Vol. 18 (3): 139-141 [Abstract] ( 2500 ) HTML (1 KB)  PDF  (118 KB)  ( 209 )
142 EFFECT OF INTENSIVE MANAGEMENT MODEL IN MARKET COMPETITION AND ENTERPRISE DEVELOPMENT
HE Yu-hong
The paper analyzes the characteristics of the railway construction enterprises, as well as the practical experiences of pushing forward the intensive management in reform by facing on market under the conditions of the market economy. The particular measures for promoting intensive management furthermore, as well as to implement the "five major strategy" by taking intensive points into special attention, are proposed.
2001 Vol. 18 (3): 142-145 [Abstract] ( 2479 ) HTML (1 KB)  PDF  (112 KB)  ( 127 )
146 STUDY ON ESTABLISHING TECHNICAL INNOVATION SYSTEM FOR NATIONAL LARGE ENTERPRISE GROUPS
DING Rong-chang
Nowadays, the reform of our national enterprises has entered a critical stage. In order to do well with the national enterprises and extricate themselves from the predicament, it is necessary to establish a new technical innovation system and promote enterprise technical progress. But there are many problems occurred in the developing course which should be solved as soon as possible. This paper reveals the major problems and their sources in the course of enterprise technical innovation, thereby further discusses the methods about establishing and perfecting the technical innovation mechanism and mode.