2000 Vol. 17, No. 1
Published: 2000-01-15
1
SIEZE OPPORTUNITY,UNITE AND STRUGGLE FOR A NEW VICTORY OF JOINED BATTLE ON RAILWAY CONSTRUCTION
CAI Qing-hua
This paper is extracted from deputy minister Mr. Cai Qing-hua s speech in the Working Meeting of National Railway Construction Systems. The paper puts forward a sys ematic and complete analysis for the situation faced on the railway construction in the later stage of the“ Nine-Five” period. The cl ear requirements of railway construction in year 2000 are proposed. They are the clear essentials and directions for the science-technology research of the railway engineering works.
2000 Vol. 17 (1): 1-3 [
Abstract
] (
2458
)
HTML
(1 KB)
PDF
(103 KB) (
92
)
4
REASONABLENESS OF ENLARGING TRAFFIC CAPACITY OF JING-HU RAILWAY BY ADOPTING WHEEL-RAIL HIGH-SPEED SYSTEM
REN Run-tang
From the viewpoints of present situation of railways in the Jng-Hu region,the regional economy, requirements of its passenger and freight traffic and the specialities of its transportation,the paper analyzes and demonstrates the necessity and urgency of construction of the Jng-Hu High-speed Railway,as well as the reasonableness of adopting the wheel-rail high-speed system for enhancing the traffic capacity of the Jng-Hu railway.
2000 Vol. 17 (1): 4-7 [
Abstract
] (
2506
)
HTML
(1 KB)
PDF
(126 KB) (
142
)
8
PRELIMINARY TALKING ABOUT MOUNTAIN AREA RAILWAY CONSTRUCTION IN
GAO Si-bin
Due to the high difficulty in engineering works and big investment of the railway constructionin the mountain area,the demonstrations in different aspects should be put forward during setting up the construction projects. The route selection schemes should be economic and reasonable,and the main technical standards should be selected properly- During the research of the route selection schemes,the strip of land between hills should be determined reasonably,and the geological route selection should be taken into attention. Through carefully design,an economic and reasonable route may be selected so as to fulfill not only the requirements of railway transportation,but also to promote the development of the local economy.
2000 Vol. 17 (1): 8-12 [
Abstract
] (
2506
)
HTML
(1 KB)
PDF
(157 KB) (
132
)
13
EXPLORATION ON DEVELOPING TARGET FOR XI '勝XIAMEN RAILWAY PASSAGE
XU Ding-cheng
According to the specialities of the national economic development and the overall arrangement of its railway networks,the author proposes his consideration on constructing the Xi an-Xiamen railw ay passage. The basic direction of this railw ay passage is introduced,as well as its general situation- It is pointed out that the construction of the Xi an-Xiamen railw ay passage will complete the overall arrangement of railw ay networks in China. This railw ay passage is not only a political and national defence line,but also is a line to help the slum district in the mountain area. The construction of Xi-Xia Railw ay will become an economic developing link between inland and Southeast coastal areas,promote development of industry and agriculture along the railway, come off poor to become rich in mountain areas, provide conditions to develop industry of large and middle cities along the railway,and promote the development of tourism along this railway. The author suggests that the Xi-Xia railw ay passage may be constructed in following three steps,i. e. Ankang-Yichang at first, Pingxiang-Yong 'an secondly,and finally Shimen-Xiangtang. The construction of Xi-Xia Railway makes the structure of railway networks reasonable. The Lanxin-Lo nghai-Xixia railw ay line will become the main artery of communication between the East China and West China for economic development,promote peace and unifying the country with Taiwan Province, and create vigorous influence on economy and trade exchange between the two coast.
2000 Vol. 17 (1): 13-15 [
Abstract
] (
2535
)
HTML
(1 KB)
PDF
(99 KB) (
67
)
16
SYSTEMATIC EXPLORATION ON SELECTION OF TARGETED SPEED FOR JING-HU HIGH-SPEED RAILWAY
HU Xu-hong
This article expounds systematically the selection of targeted speed for Beijing-Shanghai High-speed Railway which is regarded as the beginning project of Chinese high-speed railway from the viewpoints of technical feasibility,economical rationality and adaptability of transportation organization mode,as well as the long-teim development of Chinese railway technology-
2000 Vol. 17 (1): 16-20 [
Abstract
] (
2493
)
HTML
(1 KB)
PDF
(150 KB) (
132
)
21
DESIGN AND CALCULATION OF S-TYPE CURVE IN TWO FAMILIAR SIGHT
WAN G We-dong,HE Xiang-wei2
The article show the method of design and calculation of S-type curve in two familiar sight in high grade road design- Based on this,the author codes in VC+ + 5. 0 development and realizes the alternation design between man and computer in AutoCAD 14. 0.
2000 Vol. 17 (1): 21-23 [
Abstract
] (
2505
)
HTML
(1 KB)
PDF
(113 KB) (
132
)
24
FUNCTION OF REMOTE SENSING ON RAILWAY LINE SURVEYING
ZHEN Chun-xiang
The article introduces briefly several actual projects completed in recent years,concerned with the application of remote sensing on planned railway geological surveying,and illustrates the function of applying remote sensing technology. Meanwhile,it points out that in the earlier stage of railway surveying and design,it is necessary to use systematically remote sensing techno logy to investigate engineering geology conditions. Finally,it puts forward the mode of remote sensing application on geological prospecting of planned railw ay li ne.
2000 Vol. 17 (1): 24-27 [
Abstract
] (
2504
)
HTML
(1 KB)
PDF
(131 KB) (
178
)
28
PRINCIPLE FOR RAIL GRINDING AND APPLICATION
LEI Xiao-yan
Two types of rail grinding techniques which are widely employed abroad are comprehensively dealt with in this paper. Emphases are devoted to describe the principle,the scope,as well as benefits and defects of the preventive grinding approach(profile grinding). It s pointed out that the wear,fatigue and corrugation can effectively be controlled by porfile grinding so that the interaction of wheel and rail is improved and associated impact loads and noise are reduced,as well as the rail life is ex tended .
2000 Vol. 17 (1): 28-33 [
Abstract
] (
2546
)
HTML
(1 KB)
PDF
(204 KB) (
392
)
34
ANALYSIS OF BEARING CAPACITY OF PILES IN SOFT FOUNDATION
YANGXiao-li,LI Liang
This paper intends to illustrate the ultimate bearing capacity of pile in soft foundation. Under circular load,the bearing capacity of pile is obtained by stress at different positions and settlement of pile butt. According to the result of test piling,the cause of error is analyzed based on the theoretical formulas.
2000 Vol. 17 (1): 34-36 [
Abstract
] (
2576
)
HTML
(1 KB)
PDF
(106 KB) (
126
)
37
CONSTRUCTION OF STEEL GIRDER BRIDGE ON THE SHANGHAI UMT PEARL LINE FOR STRIDING HU-NING AND HU-HANG RAILWAYS
CHEN Ke-wang
The paper introduces the steel girder bridge construction for striding Hu-Ning and Hu-Hang railways on the UMT Pearl Line in Shanghai,especially introduces the difficult parts,the construction of the bored-pile adjacent to the railway and the suspension-installation of the steel girder for striding the four-lined railway in detail.
2000 Vol. 17 (1): 37-44 [
Abstract
] (
2539
)
HTML
(1 KB)
PDF
(254 KB) (
79
)
45
PROBING ON CAUSE TO THE LATERAL AMPLITUDE OF RAILWAY BRIDGE GOING BEYOND LIMIT AND METHOD TO RESTRENGTHEN BRIDGE AND REDUCE BRIDGE AMPLITUDE OF VIBRATION
BU Jian-qing,LOU Guo-chong,LUO Yong-hui
Because of raising speed of train,the lateral amplitude of vibration of the parts of railway bridge go beyond the limit. The main causes for it are discussed and the proposals to reduce this lateral amplitude of vibration are introduced as well.
2000 Vol. 17 (1): 45-48 [
Abstract
] (
2559
)
HTML
(1 KB)
PDF
(126 KB) (
137
)
49
RELIABILITY ANALYSIS ON STABILITY AGAINST SLIDING FOR RAILWAY ABUTMENT
LU Wen-liang1,XU Ke-bin1,LI Wen-hui2
In this paper,the reliability on stability against sliding of 252 railway abutments has been calcuated with improved Mont e-Carlo method. The reliability level of active standardized design has been found. By calculating, the mean value with water and without water of concrete abutment are 4. 041 and 3. 745 respectively, the variation are Q 142 and 0. 154 respectively, the mean value with water and without water of ragstone abutment are 4. 138 and 3. 883 respectively, the variation are 0. 126 and 0. 152 respectively. Through these results,the influence on reliability of main random variables has been analyzed.
2000 Vol. 17 (1): 49-54 [
Abstract
] (
2515
)
HTML
(1 KB)
PDF
(178 KB) (
146
)
55
METHOD OF IMAGES FOR DISCHARGE RATE OF THE EXTRA-LONG TUNNELS WITH SUPERTHICK OVERBURDEN
XU Ze-min,HUANG Run-qiu, YAGN Li-zhong
The thickness of overburden of extra-long tunnels often amounts to hundreds of meters,even goes beyond 1000 m. Here, an extra~long tunnel whose thickness exceeds 500 mis called extra~U)ng tunnel with superthick overburden. Their depth in aquifers is big and the initial discharge mainly comes from elastic yield. Moreover,the permeability of wall rock gets ofter poorer and poorer with depth. In view of the above aspects, the tunnels are formularized as the wells near boundaries, and the calculation model for maximum discharge rate is got by way of method of images. Having been simplified properly, the model tallies basically with part of the existing relative models.
2000 Vol. 17 (1): 55-58 [
Abstract
] (
2498
)
HTML
(1 KB)
PDF
(149 KB) (
146
)
59
STUDY ON CREVASSED ROCK MASSS NUMERICAL METHODS FOR CALCULATING AMOUNT OF WATER FLOWING INTO QINLING EXTRA-LONG TUNNEL
BI Huan- jun
Based on the analysis on the theory of numerical methods for calculating the amount of water flow ing into the tunnel, the complicated hydrology problem is dismembered and turned into some sorts of typical problem to be solved,and the computer flowsheet is drawn up. Meanwhile,according to the study on Xianrencha fault in Qinling extra~long tunnel of Xi 'an—Ankang railway, the maths model is established and the amount of water flow has been calculated. The good results are obtained compared with the real water flow volume.
2000 Vol. 17 (1): 59-62 [
Abstract
] (
2491
)
HTML
(1 KB)
PDF
(135 KB) (
199
)
63
ERROR ANALYSIS OF TUNNEL CONVERGENCE MONITORED BY INTELLIGENT TOTAL STATION
CHEN Li-wei
Based on the free stationing of the Intelligent Total Station, the formulas for computing the measurement errors of distance between arbitrary points have been established,and its analyzing software has also been developed. It has been considered that the measurement errors of distance is related not only to the oblique distance, zenith distance and horizontal vector, but also to the space position between the Total Station and measured points- The Total Station can be used to measure deformation of tunnel, but,if deformation is smaller, especially to operation tunnel,it is also available to use convergence gauge.
2000 Vol. 17 (1): 63-66 [
Abstract
] (
2554
)
HTML
(1 KB)
PDF
(133 KB) (
178
)
67
PROBLEMS OCCURRED IN CONSTRUCTION OF TUNNEL ON NAN-KUN RAILWAY (WEST-SECTION) AND THE COUNTERMEASURES
XU He-ping
By the briefly introduction of the techniques for excavation, support,transportation,lining and ventilation in construction of tunnel on Nan-Kun Railway (west-section), the author analyzes the problems occurred in application, and presents the suggestion to improve them.
2000 Vol. 17 (1): 67-71 [
Abstract
] (
2565
)
HTML
(1 KB)
PDF
(172 KB) (
88
)
72
DESIGN AND CONSTRUCTION OF TUNNELS WITH BELL-TYPED ENTRANCE ON XIAN-ANKAN G RAILWAY
ZHAO Qiu-lin,ZHANG Fenlan
The paper puts forward a summary on the design and construction of a series of tunnels with bell- typed entrance on the Xi 'an-Ankang Railway. The opinions and methods for design and construction of such kind of tunnel are proposed also in this paper.
2000 Vol. 17 (1): 72-76 [
Abstract
] (
2528
)
HTML
(1 KB)
PDF
(176 KB) (
123
)
77
TECHNIQUES FOR TREATMENT OF DISASTERS IN TIESHAN TUNNEL
LI Zhi-guo, CAO Zhen-ying
The Tieshan Tunnel of Ba-Peng highway is Situated in Dachuan city of Sichuan province with a total length of 2 099 m at 66 northwest of the Tieshan valley- Due to several influence factors, such as the coal mining subsidence, groundwater, weak surrounding rock, etc, disasters occurred in the K14C+ 527~- + 608 section. The disasters in this section included the crack, broken bench cut and rock mass falling of the secondary lining, the bending and shearing break of the reinforcement, and the cracking and leakage of side wall nearby wate channel. These disasters endangered the safety running, the communication was interrupted, and the repairing works were put forward. The repairing methods are introduced mainly in this pa per as follows after reinforcing by grouting for the surrounding rock of the tunnel and its mini ng subsidence region, the secondary lining and its inverted arch, the pavement in serious disaster sections were demolished and the reinforced concrete structures were reconstructed again; in the other hand, the reinforced concrete casing linings were reconstructed for consolidation in general disaster sections.
2000 Vol. 17 (1): 77-81 [
Abstract
] (
2547
)
HTML
(1 KB)
PDF
(163 KB) (
115
)
82
SUMMARY OF HYDROGEOLOGIC TUNNEL WORKS ON QINLING EXTRA-LONG
SHI Zhong-ping
Based on the authors personal experiences, a detailed description of hydrogeological work on Qinling extra-long tunnel from its subnnitial survey stage to the construction stage has been presented here. Meanwhile,the importance of synthetic hydrogeological work in the tunnel project has been emphasized also in the article.
2000 Vol. 17 (1): 82-86 [
Abstract
] (
2485
)
HTML
(1 KB)
PDF
(149 KB) (
111
)
87
PRELIMINARY TALKING ABOUT GEOLOGIC ADVANCE FORECAST ON F5 FAULT IN CHANGLIANGSHAN TUNNEL
BAI Heng-heng,XIN Min-gao
The Changliangshan Tunnel is a double-lined tunnel whose length is in the second order in China. Its geologic conditions are very complex with high difficulty in construction works- The F5 Fault is one of the biggest faults in this tunnel. The paper introduces the geologic advance forecast works on the F5 Fault by using synthetic methods, providing scientific base for its construction,and better effects are also obtained.
2000 Vol. 17 (1): 87-90 [
Abstract
] (
2561
)
HTML
(1 KB)
PDF
(128 KB) (
96
)
91
ENGINEERING GEOLOGICAL ROUTE SELECTION OF XIAN-NANJING RAILWAY IN HOUZHI TOWN
SUN Bo,DU Shi-hui
Xi an-Nanjing railway goes through the fossil diluvial fan of Houzhi town as well as the north foot of Qinling Mountain. The geological situation is very complex in this district. The more engineering geological question is deeply cognized,the more railway-lines scheme is perfect- This pa per sums up the geological question here and analyses the selecting scheme of railway-line as well as the knowledgeable degree about the geological questions,and suitable result of selecting scheme has been obtained.
2000 Vol. 17 (1): 91-94 [
Abstract
] (
2524
)
HTML
(1 KB)
PDF
(137 KB) (
103
)
95
DEVELOPMENT OF TSS-TYPE GROUTING TUBE AND ITS APPLICATION IN SATURATED AQUIFER OF SAND STRATUM
DINGRui
In order to solve the short comings of grouting section by section in the saturated aquifer of sand stratum, such as the difficulty on formation of boied-hole, larger volume of the boring machine, easy deformation of PV C plastic grouting tube under pressure,higher cost, etc, by developing the TSS-type grouting tube with its application in the saturated aquifer of sand stratum, the technology of one-directional valve-typed small—iiameter grouting tube had been established- This technology quickened the rate of engineering progress and reduced the construction cost greatly. This pa per introduces mainly the design and the experiment of the non-return valve and the one-directional stop-grouting system of the TSS grouting tube, as well as the construction technology on the application of TSS grouting tube in the saturated aquifer of sand stratum.
2000 Vol. 17 (1): 95-101 [
Abstract
] (
2471
)
HTML
(1 KB)
PDF
(220 KB) (
80
)
102
RESEARCH ON CONSTRUCTION TECHNIQUE FOR DEEP BORDE PILES
WU Hong-tao
Taking the construction experiences of 75. 5 m deep bored piles for the Mansion of Liao Chuang- Xi ng Financial Centre in Shanghai City as example,a special research problem on deep bored piles had been put forward- The main construction technique and methods for constructing these deep bored piles are introduced in this paper. The adopted measures for applying the stabiliced liquid method and for preventing inclined borehole and the landslide in borehole are also proposed, so as to guarantee the safety operation, rapid, high quality and to complete the project on time.
2000 Vol. 17 (1): 102-106 [
Abstract
] (
2577
)
HTML
(1 KB)
PDF
(149 KB) (
88
)
107
PRELIMINARY DESCRIPTION OF AN INTELLIGENT BUILDING
ZHANG Min
Along with the development of computer technique,network technique and other high science- technologies,architectural discipline facing on a new revolution,the fraditional design and construction methods cannot fulfill the development of modern industries. In order to give a certain understanding on the intelligent buildings,the newly-built traffic control command center in the Ministry of Railw ays is introduced in this paper.
2000 Vol. 17 (1): 107-110 [
Abstract
] (
2461
)
HTML
(1 KB)
PDF
(120 KB) (
245
)
111
PRELIMINARY TALKING ABOUT SEVERAL UNDERSTANDIN GS ON MANAGEMENT OF CONSTRUCTION PROJECTS
LI Bing-tai
Nowadays,in order to seize the opportunity,doing well the railway construction and promoting the national economic development,a special management organization had been established in the Ministry of Railways- This organization is responsible for the large and middle engineering projects of the newly-built railways- 1n viewpoint of the management of construction projects,an overall procedure of supervisory control for design,construction and supervision had been established,so as to struggle for the creation of high quality engineering works. The paper analyzes the existing problems concerned with the construction management in present times,and the corresponding suggestions for improvement are proposed.
2000 Vol. 17 (1): 111-113 [
Abstract
] (
2465
)
HTML
(1 KB)
PDF
(135 KB) (
172
)
114
PRELIMINARY DISCUSSION ON CALLING FOR TENDERS AND TENDERS FOR RAILWAY CAPITAL CONSTRUCTION
XU Jian-hong
The paper puts forward a brief analysis on the present situation of the calling for tenders and the tenders for the railway capital constructions,with which how to match it with the national law of calling for tenders and the tenders for railw ay capital constructions has been also proposed,as well as the problems concerned with the development and the perfection of its market.
2000 Vol. 17 (1): 114-117 [
Abstract
] (
2544
)
HTML
(1 KB)
PDF
(122 KB) (
89
)
118
PRELIMINARY TALKING ABOUT SEVERAL UNDERSTANDIN GS ON MANAGEMENT OF CONSTRUCTION PROJECTS
LI Bing-tai
Nowadays,in order to seize the opportunity,doing well the railw ay construction and promoting the national economic development,a special management organization had been established in the Ministry of Railways- This organization is responsible for the large and middle engineering projects of the newly-built railw ays- In viewpoint of the management of construction projects,an overall procedure of supervisory control for design,construction and supervision had been established,so as to struggle for the creation of high quality engineering works. The paper analyzes the existing problems concerned with the construction management in present times,and the corresponding suggestions for improvement are proposed.
2000 Vol. 17 (1): 118-121 [
Abstract
] (
2563
)
HTML
(1 KB)
PDF
(121 KB) (
214
)
122
ESTABLISHING RAILWAY VISIBLE CONSTRUCTION MARKET TO GIVE SERVICE FOR THE MAIN BODY OF RAILWAY CONSTRUCTION MARKET
WU Bi- zhong
The establishment of railway visible construction market provides a new thinking and researching space for the investment and management of railw ay construction hereafter. It laies the foundations for the scientific and complete development of railway construction, and for the implementation of technical advance to raise the level of railway construction more rapidly. In this paper,the author introduees the manage layers of the railway visible construction market and its duties,the exchange scope of the Engineering ftoject Exchange Center of MOR and its exchange regulations,etc. They should be taken into attention widely by railway technicians and manage staffs.
2000 Vol. 17 (1): 122-126 [
Abstract
] (
2546
)
HTML
(1 KB)
PDF
(191 KB) (
132
)
127
DISCUSSION ON THE IMPLEMENTATION OF BOT INVESTMENT APPROACH IN URBAN RAIL SYSTEMS
WU Xiao-qiang1,LI Peng1,XU Pei-ming2
In the progress of urban modernization in China,the urban rail systems are playing a more and more important role in the transiting passengers. This paper analyzes the process of the implementation of BOT method in the construction of urban rail systems. Some useful strategy and advice has been put forward according to the existing problems-
2000 Vol. 17 (1): 127-130 [
Abstract
] (
2572
)
HTML
(1 KB)
PDF
(129 KB) (
120
)
131
STRATAGEMS AND ARTS OF WORKING OUT CONSTRUCTION ORGANIZATION DESIGN FOR A BIDDING
lI Ming-hua
During bidding of project a reasonable quoted price was to be decided according to the construction organization design. Therefore,the construction organization design is the center of the bidding work. In this paper,the characteristics of design are analysed. The contents,methods and stratagems are pointed out.
2000 Vol. 17 (1): 131-133 [
Abstract
] (
2519
)
HTML
(1 KB)
PDF
(127 KB) (
324
)