Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
Other articles related with "U455":
83 SHEN Hong-shan
  Necessity of Planning and Building Intercity Railways in Hubei Province
    Journal of Railway Engineering Society   2013 Vol.30 (6): 83-87 [Abstract] (2899) 1 [HTML 1 KB] [PDF 443 KB] (160)
68 ZHENG Zong - xi,SUN Qi - qing
  Design Technology for Unequal Span Double - arch Tunnel under Shallow Biasing Condition
    Journal of Railway Engineering Society   2013 Vol.30 (4): 68-73 [Abstract] (2825) 1 [HTML 1 KB] [PDF 1585 KB] (222)
86 ZHOU Cheng1,WANG Cheng - shan2,LI Yong - jun,GUO Pu
  Underground Barriers Clean - up Technology for Subway Shield Tunnelling Based on Ground Frozen Method
    Journal of Railway Engineering Society   2013 Vol.30 (3): 86-90 [Abstract] (2743) 1 [HTML 1 KB] [PDF 834 KB] (119)
81 YAO Jie
  Analysis of Influence of New Highway Construction on Tunnel of Ganzhou-Longyan Railway
    Journal of Railway Engineering Society   2013 Vol.30 (2): 81-85 [Abstract] (2738) 1 [HTML 1 KB] [PDF 1779 KB] (312)
72 GEN Ji-min, QI Yong-qian, DAI Cui-lan
  JGMZY 10 Type Multi-functional Operation Vehicle for Tunnel
    Journal of Railway Engineering Society   2013 Vol.30 (1): 72-75,99 [Abstract] (2745) 1 [HTML 1 KB] [PDF 906 KB] (339)
21 CAO Feng
  Special Research on Water - stability Characteristics of Tertiary System Sandstone in Lanzhou Area During Tunnel Construction
    Journal of Railway Engineering Society   2012 Vol.29 (12): 21-25 [Abstract] (2733) 1 [HTML 1 KB] [PDF 466 KB] (263)
23 WANG Ya - fei
  Aided Design of Cross Section of Interactive Subgrade
    Journal of Railway Engineering Society   2012 Vol.29 (11): 23-26 [Abstract] (2618) 1 [HTML 1 KB] [PDF 588 KB] (268)
43 TU Yang - zhi
  Design of Swinged Continuous Beam of Super - large Bridge Crossing Wuhan - Guangzhou High - speed Railway
    Journal of Railway Engineering Society   2012 Vol.29 (11): 43-48 [Abstract] (2673) 1 [HTML 1 KB] [PDF 978 KB] (374)
62 ZHAO Xi-min
  Application of Drainage Decompression and Grouting Reinforcement Technologies in Construction of Tunnel in Rich Water Fault Zone
    Journal of Railway Engineering Society   2012 Vol.29 (11): 62-66 [Abstract] (2633) 1 [HTML 1 KB] [PDF 685 KB] (124)
60 ZHENG Zong - xi,SUN Qi - qing
  Research on Construction Technology for Unsymmetrical Multi-arch and Unsymmetrically Loaded Railway Tunnel
    Journal of Railway Engineering Society   2012 Vol.29 (8): 60-65 [Abstract] (2555) 1 [HTML 1 KB] [PDF 1448 KB] (196)
104 YOU Long - fei,WANG Xiao - wen,GONG Yan - feng,SUN Chun - guang,CHEN Li - bao,YE Chao
  Research on Pretreatment Approach of Foundation for Shield Under - passing Newly - built Railway Station
    Journal of Railway Engineering Society   2012 Vol.29 (6): 104-108 [Abstract] (2591) 1 [HTML 1 KB] [PDF 874 KB] (413)
45 GONG Cheng - ming1,MENG Qing - yu2,LI Wu - hong3
  Safe Construction Techniques for Tunnels Passing through Fractured Fault Zone
    Journal of Railway Engineering Society   2012 Vol.29 (5): 45-48 [Abstract] (2586) 1 [HTML 1 KB] [PDF 327 KB] (254)
83 YANG Hui - jun
  Construction Technology for Shallow Surface Excavation Large - spanned Metro Air Duct
    Journal of Railway Engineering Society   2012 Vol.29 (1): 83-87 [Abstract] (2700) 1 [HTML 1 KB] [PDF 645 KB] (234)
57 ZHUO Yi,WANG Fei
  Research on Intelligent Diagnosis Methods of A Hybrid Girder Cable - stayed Bridge Based on Artificial Neural Networks
    Journal of Railway Engineering Society   2011 Vol.28 (12): 57-63 [Abstract] (2633) 1 [HTML 1 KB] [PDF 842 KB] (426)
98 KOU Xiao - qiang,YANG Jing - fang,YE Guo - liang,CAO Yong - hua
  Study on Reinforcement Effect of Shield Tunnel Adjacent to Existing Pile Foundation with Churning Pile
    Journal of Railway Engineering Society   2011 Vol.28 (11): 98-103 [Abstract] (2545) 1 [HTML 1 KB] [PDF 1831 KB] (234)
124 HU Shuang - ping
  Structural Calculation and Analysis of Transfer Node of Three - line Transfer Station
    Journal of Railway Engineering Society   2011 Vol.28 (10): 124-128 [Abstract] (2572) 1 [HTML 1 KB] [PDF 1061 KB] (526)
63 QING San - hui,XIE Wen - qing,GU Wen - kai,HUANG Shi - wen
  Innovation of Key Construction Technology for Kiaochow Bay Submarine Tunnel with Boring and Blast Method
    Journal of Railway Engineering Society   2011 Vol.28 (9): 63-69 [Abstract] (2657) 1 [HTML 1 KB] [PDF 1195 KB] (232)
78 ZHANG Jun-bing,ZHENG Bao-cai,YU Hai-tao,KANG Kai
  Blasting Control Technology for Shallow Large Span Tunnel Under - passing Buildings and Monitoring Analysis of Blasting
    Journal of Railway Engineering Society   2011 Vol.28 (7): 78-82 [Abstract] (2821) 1 [HTML 1 KB] [PDF 799 KB] (357)
94 WANG Hui
  Control of Settlement Caused by Shield Excavation Construction Under Building and Structures
    Journal of Railway Engineering Society   2011 Vol.28 (7): 94-98 [Abstract] (3046) 1 [HTML 1 KB] [PDF 503 KB] (323)
99 ZHANG Yong - qiang
  Application of Shotcrete and Anchorage Support in Construction of Tunnel with Soft - weak Surrounding Rock
    Journal of Railway Engineering Society   2011 Vol.28 (7): 99-104 [Abstract] (2612) 1 [HTML 1 KB] [PDF 240 KB] (141)
14 WANG Fei,ZHUO Yi
  Analysis of Impact of Shield Tunneling on Displacement of Existed Bridge Foundation
    Journal of Railway Engineering Society   2011 Vol.28 (6): 14-20 [Abstract] (3028) 1 [HTML 1 KB] [PDF 1111 KB] (279)
44 HE Da,SUN Qi - qing,ZHAO Wan - qiang
  Application of MUIR WOOD Equation in Construction of Shield Tunnel
    Journal of Railway Engineering Society   2011 Vol.28 (6): 44-46 [Abstract] (2594) 1 [HTML 1 KB] [PDF 248 KB] (182)
98 XUE Li,SUN Fu - feng,SHI Yan - long,HAN Hui - hui,SUN Chao
  Research on Blasting Vibration Control of Tunnel Excavation of Qingdao Subway
    Journal of Railway Engineering Society   2011 Vol.28 (5): 98-101 [Abstract] (2553) 1 [HTML 1 KB] [PDF 531 KB] (245)
69 LIU Yang,YAO Hai - bo
  Characteristcs and Prediction of Geological Disaster of High Gas Mountain Tunnel
    Journal of Railway Engineering Society   2011 Vol.28 (3): 69-71 [Abstract] (2551) 1 [HTML 1 KB] [PDF 1252 KB] (362)
94 DING Lie - yun,LI Wei - ming,CHEN Xiao - yang
  Numerical Simulation Calculation and Field Data Monitoring Analysis for Start Section of Shield Construction of Wuhan Metro
    Journal of Railway Engineering Society   2011 Vol.28 (3): 94-99 [Abstract] (2681) 1 [HTML 1 KB] [PDF 1703 KB] (269)
47 LI Xu- dong, BAIHa i- feng, ZHOU Zhi- shun
  Study on Blasting Subsurface ExcavationMethod for Shallow TunnelUnderpassing Ground Building
    Journal of Railway Engineering Society   2011 Vol.28 (1): 47-50 [Abstract] (2574) 1 [HTML 1 KB] [PDF 464 KB] (171)
62 WANG Xu- x ing
  Technology for Disposing Continuous Collapse of Lajishan Tunnel with Soil MouldingMethod
    Journal of Railway Engineering Society   2011 Vol.28 (1): 62-65 [Abstract] (2579) 1 [HTML 1 KB] [PDF 216 KB] (106)
86 LUO Han- bin, LIWe i- m ing, ZHOU Guang- hui
  Analysis of Ground Settlement Caused by Shield Construction ofWuhan Metro with Non- equal Intervalmodel
    Journal of Railway Engineering Society   2011 Vol.28 (1): 86-91 [Abstract] (2756) 1 [HTML 1 KB] [PDF 420 KB] (215)
87 DING Lie—yun,LI Wei—ming,WU Xian—guo,LUO Han—bin
  Study on Construction Plan for Wuhan Metro in Key Area Under Complex Engineering Environment:Operational Analysis of Surrounding Light Rail Bridge
    Journal of Railway Engineering Society   2010 Vol.27 (11): 87-90 [Abstract] (3158) 1 [HTML 1 KB] [PDF 374 KB] (178)
20 LIU Hao-zheng
  Application of Compression Dispersion-type Anchor in Construction of the Xiangtang-Putian Railway
    Journal of Railway Engineering Society   2010 Vol.27 (10): 20-25 [Abstract] (2539) 1 [HTML 1 KB] [PDF 171 KB] (123)
First page | Prev page | Next page | Last pagePage 2 of 6, 177 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech