Home
About Us
Science Information
Article
Subscribe
Contact
Editorial
Message
中文
The mobile platform
Office Online
Journal Online
Forthcoming Articles
Current Issue
Adv Search
Archive
Read Articles
Download Articles
Email Alert
Member Service
Other articles related with "U455":
83
SHEN Hong-shan
Necessity of Planning and Building Intercity Railways in Hubei Province
Journal of Railway Engineering Society 2013 Vol.30 (6): 83-87 [
Abstract
] (
2899
) 1 [
HTML
1 KB] [
PDF
443 KB] (
160
)
68
ZHENG Zong - xi,SUN Qi - qing
Design Technology for Unequal Span Double - arch Tunnel under Shallow Biasing Condition
Journal of Railway Engineering Society 2013 Vol.30 (4): 68-73 [
Abstract
] (
2825
) 1 [
HTML
1 KB] [
PDF
1585 KB] (
222
)
86
ZHOU Cheng1,WANG Cheng - shan2,LI Yong - jun,GUO Pu
Underground Barriers Clean - up Technology for Subway Shield Tunnelling Based on Ground Frozen Method
Journal of Railway Engineering Society 2013 Vol.30 (3): 86-90 [
Abstract
] (
2743
) 1 [
HTML
1 KB] [
PDF
834 KB] (
119
)
81
YAO Jie
Analysis of Influence of New Highway Construction on Tunnel of Ganzhou-Longyan Railway
Journal of Railway Engineering Society 2013 Vol.30 (2): 81-85 [
Abstract
] (
2738
) 1 [
HTML
1 KB] [
PDF
1779 KB] (
312
)
72
GEN Ji-min, QI Yong-qian, DAI Cui-lan
JGMZY 10 Type Multi-functional Operation Vehicle for Tunnel
Journal of Railway Engineering Society 2013 Vol.30 (1): 72-75,99 [
Abstract
] (
2745
) 1 [
HTML
1 KB] [
PDF
906 KB] (
339
)
21
CAO Feng
Special Research on Water - stability Characteristics of Tertiary System Sandstone in Lanzhou Area During Tunnel Construction
Journal of Railway Engineering Society 2012 Vol.29 (12): 21-25 [
Abstract
] (
2733
) 1 [
HTML
1 KB] [
PDF
466 KB] (
263
)
23
WANG Ya - fei
Aided Design of Cross Section of Interactive Subgrade
Journal of Railway Engineering Society 2012 Vol.29 (11): 23-26 [
Abstract
] (
2618
) 1 [
HTML
1 KB] [
PDF
588 KB] (
268
)
43
TU Yang - zhi
Design of Swinged Continuous Beam of Super - large Bridge Crossing Wuhan - Guangzhou High - speed Railway
Journal of Railway Engineering Society 2012 Vol.29 (11): 43-48 [
Abstract
] (
2673
) 1 [
HTML
1 KB] [
PDF
978 KB] (
374
)
62
ZHAO Xi-min
Application of Drainage Decompression and Grouting Reinforcement Technologies in Construction of Tunnel in Rich Water Fault Zone
Journal of Railway Engineering Society 2012 Vol.29 (11): 62-66 [
Abstract
] (
2633
) 1 [
HTML
1 KB] [
PDF
685 KB] (
124
)
60
ZHENG Zong - xi,SUN Qi - qing
Research on Construction Technology for Unsymmetrical Multi-arch and Unsymmetrically Loaded Railway Tunnel
Journal of Railway Engineering Society 2012 Vol.29 (8): 60-65 [
Abstract
] (
2555
) 1 [
HTML
1 KB] [
PDF
1448 KB] (
196
)
104
YOU Long - fei,WANG Xiao - wen,GONG Yan - feng,SUN Chun - guang,CHEN Li - bao,YE Chao
Research on Pretreatment Approach of Foundation for Shield Under - passing Newly - built Railway Station
Journal of Railway Engineering Society 2012 Vol.29 (6): 104-108 [
Abstract
] (
2591
) 1 [
HTML
1 KB] [
PDF
874 KB] (
413
)
45
GONG Cheng - ming1,MENG Qing - yu2,LI Wu - hong3
Safe Construction Techniques for Tunnels Passing through Fractured Fault Zone
Journal of Railway Engineering Society 2012 Vol.29 (5): 45-48 [
Abstract
] (
2586
) 1 [
HTML
1 KB] [
PDF
327 KB] (
254
)
83
YANG Hui - jun
Construction Technology for Shallow Surface Excavation Large - spanned Metro Air Duct
Journal of Railway Engineering Society 2012 Vol.29 (1): 83-87 [
Abstract
] (
2700
) 1 [
HTML
1 KB] [
PDF
645 KB] (
234
)
57
ZHUO Yi,WANG Fei
Research on Intelligent Diagnosis Methods of A Hybrid Girder Cable - stayed Bridge Based on Artificial Neural Networks
Journal of Railway Engineering Society 2011 Vol.28 (12): 57-63 [
Abstract
] (
2633
) 1 [
HTML
1 KB] [
PDF
842 KB] (
426
)
98
KOU Xiao - qiang,YANG Jing - fang,YE Guo - liang,CAO Yong - hua
Study on Reinforcement Effect of Shield Tunnel Adjacent to Existing Pile Foundation with Churning Pile
Journal of Railway Engineering Society 2011 Vol.28 (11): 98-103 [
Abstract
] (
2545
) 1 [
HTML
1 KB] [
PDF
1831 KB] (
234
)
124
HU Shuang - ping
Structural Calculation and Analysis of Transfer Node of Three - line Transfer Station
Journal of Railway Engineering Society 2011 Vol.28 (10): 124-128 [
Abstract
] (
2572
) 1 [
HTML
1 KB] [
PDF
1061 KB] (
526
)
63
QING San - hui,XIE Wen - qing,GU Wen - kai,HUANG Shi - wen
Innovation of Key Construction Technology for Kiaochow Bay Submarine Tunnel with Boring and Blast Method
Journal of Railway Engineering Society 2011 Vol.28 (9): 63-69 [
Abstract
] (
2657
) 1 [
HTML
1 KB] [
PDF
1195 KB] (
232
)
78
ZHANG Jun-bing,ZHENG Bao-cai,YU Hai-tao,KANG Kai
Blasting Control Technology for Shallow Large Span Tunnel Under - passing Buildings and Monitoring Analysis of Blasting
Journal of Railway Engineering Society 2011 Vol.28 (7): 78-82 [
Abstract
] (
2821
) 1 [
HTML
1 KB] [
PDF
799 KB] (
357
)
94
WANG Hui
Control of Settlement Caused by Shield Excavation Construction Under Building and Structures
Journal of Railway Engineering Society 2011 Vol.28 (7): 94-98 [
Abstract
] (
3046
) 1 [
HTML
1 KB] [
PDF
503 KB] (
323
)
99
ZHANG Yong - qiang
Application of Shotcrete and Anchorage Support in Construction of Tunnel with Soft - weak Surrounding Rock
Journal of Railway Engineering Society 2011 Vol.28 (7): 99-104 [
Abstract
] (
2612
) 1 [
HTML
1 KB] [
PDF
240 KB] (
141
)
14
WANG Fei,ZHUO Yi
Analysis of Impact of Shield Tunneling on Displacement of Existed Bridge Foundation
Journal of Railway Engineering Society 2011 Vol.28 (6): 14-20 [
Abstract
] (
3028
) 1 [
HTML
1 KB] [
PDF
1111 KB] (
279
)
44
HE Da,SUN Qi - qing,ZHAO Wan - qiang
Application of MUIR WOOD Equation in Construction of Shield Tunnel
Journal of Railway Engineering Society 2011 Vol.28 (6): 44-46 [
Abstract
] (
2594
) 1 [
HTML
1 KB] [
PDF
248 KB] (
182
)
98
XUE Li,SUN Fu - feng,SHI Yan - long,HAN Hui - hui,SUN Chao
Research on Blasting Vibration Control of Tunnel Excavation of Qingdao Subway
Journal of Railway Engineering Society 2011 Vol.28 (5): 98-101 [
Abstract
] (
2553
) 1 [
HTML
1 KB] [
PDF
531 KB] (
245
)
69
LIU Yang,YAO Hai - bo
Characteristcs and Prediction of Geological Disaster of High Gas Mountain Tunnel
Journal of Railway Engineering Society 2011 Vol.28 (3): 69-71 [
Abstract
] (
2551
) 1 [
HTML
1 KB] [
PDF
1252 KB] (
362
)
94
DING Lie - yun,LI Wei - ming,CHEN Xiao - yang
Numerical Simulation Calculation and Field Data Monitoring Analysis for Start Section of Shield Construction of Wuhan Metro
Journal of Railway Engineering Society 2011 Vol.28 (3): 94-99 [
Abstract
] (
2681
) 1 [
HTML
1 KB] [
PDF
1703 KB] (
269
)
47
LI Xu- dong, BAIHa i- feng, ZHOU Zhi- shun
Study on Blasting Subsurface ExcavationMethod for Shallow TunnelUnderpassing Ground Building
Journal of Railway Engineering Society 2011 Vol.28 (1): 47-50 [
Abstract
] (
2574
) 1 [
HTML
1 KB] [
PDF
464 KB] (
171
)
62
WANG Xu- x ing
Technology for Disposing Continuous Collapse of Lajishan Tunnel with Soil MouldingMethod
Journal of Railway Engineering Society 2011 Vol.28 (1): 62-65 [
Abstract
] (
2579
) 1 [
HTML
1 KB] [
PDF
216 KB] (
106
)
86
LUO Han- bin, LIWe i- m ing, ZHOU Guang- hui
Analysis of Ground Settlement Caused by Shield Construction ofWuhan Metro with Non- equal Intervalmodel
Journal of Railway Engineering Society 2011 Vol.28 (1): 86-91 [
Abstract
] (
2756
) 1 [
HTML
1 KB] [
PDF
420 KB] (
215
)
87
DING Lie—yun,LI Wei—ming,WU Xian—guo,LUO Han—bin
Study on Construction Plan for Wuhan Metro in Key Area Under Complex Engineering Environment:Operational Analysis of Surrounding Light Rail Bridge
Journal of Railway Engineering Society 2010 Vol.27 (11): 87-90 [
Abstract
] (
3158
) 1 [
HTML
1 KB] [
PDF
374 KB] (
178
)
20
LIU Hao-zheng
Application of Compression Dispersion-type Anchor in Construction of the Xiangtang-Putian Railway
Journal of Railway Engineering Society 2010 Vol.27 (10): 20-25 [
Abstract
] (
2539
) 1 [
HTML
1 KB] [
PDF
171 KB] (
123
)
First page
|
Prev page
|
Next page
|
Last page
Page 2 of 6, 177 records
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:
Beijing Magtech