Office Online
  Journal Online
   Forthcoming Articles
   Current Issue
   Adv Search
   Archive
   Read Articles
   Download Articles
   Email Alert
   
 
  Member Service
2001 Vol. 18, No. 4
Published: 2001-04-15

 
1 MEET DIFFICULTIES DEAD-ON AND CARRY ON A TENACIOUS STRUGGLE TO IMPLEMENT FIRMLY A HARD-FOUGHT BATTLE FOR CONSTRUCTION OF QING-ZANG RAILWAY
SUN Yong-fu
This paper is on extract from the speech of the deputy minster Mr. Sun Yong-fu issued at the Qing-Zang Railway Construction Conference. The paper summarizes the obtained achievements since the construction of Qing-Zang Railway going into operation. The situations faced on are analyzed, the assignments on construction of Qing-Zang Railway for next year are disposed, and the corresponding countermeasures are proposed. It will possess with important guiding meanings for all working units including design, engineering construction, science research, supervision, etc. on the construction of Qing-Zang Railway, concerned with how to implement the key battles in the next year by upholding the essential nature of staff & workers and advanced science & technology, so as to strive for new victories in the construction of Qing-Zang Railway.
2001 Vol. 18 (4): 1-5 [Abstract] ( 2551 ) HTML (1 KB)  PDF  (121 KB)  ( 87 )
6 PRELIMINARY ANALYSIS ON SITUATION AND ROLE OF CONSTRUCTING RAILWAY ALONG YANGTZE RIVER IN DEVELOPMENT OF WEST CHINA
HU Zi-ping
The current situation of railway passage along the Yangtze River and the economic and traffic structures of the regions along Yangtze River arc expounded in this paper. Based on analysis of the position and role of this passage in the economic development of the Yangtze River Basin and the great developing West China, the suggestion for constructing a railway trunk line along Yangtze River has been proposed.
2001 Vol. 18 (4): 6-11 [Abstract] ( 2515 ) HTML (1 KB)  PDF  (151 KB)  ( 116 )
12 SPECIALITIES OF HIGH SPEED RAILWAY NETWORKS IN CHINA AND THE SELECTION OF THEIR TECHNICAL SCHEMES
LI Hong, Yu Qian-feng
Being different from Europe and Japan, the high speed railway network in China consists of the dedicated passenger traffic railway lines after the separation of passenger traffic from freight traffic in the busy trunk railway lines. Due to its smaller operation area, a rapid railway with combined running of passenger and freight trains is required. The operation models of the high speed railway in China are the mixing running of high-speed and medium-speed trains, passenger and freight trains running in the same railway line, and the high-speed trains using the same stations with the common trains. As if the maglev technology will be used for the Jing-Hu high speed railway, the vast resources of existing railway cannot be utilized. Not only the investment will increase, but also will give passengers extremely inconvenience.
2001 Vol. 18 (4): 12-15 [Abstract] ( 2543 ) HTML (1 KB)  PDF  (157 KB)  ( 197 )
16 PRELIMINARY EXPLORATION ON APPLICATION PROSPECTS OF TILTING TRAINS IN CHINA
ZHOU Li-xin, DENG Yi, DU Lei
Based on the brief introduction on developing situation of the tilting trains and the conditions which should be provided for running the tilting trains, the paper proposes that the feasibility analysis should be put forward from economic viewpoint for running the tilting trains. Its investment and production essentials and influence factors arc pointed out. The paper explores the prospects of running the tilting trains in China and several problems which should be taken into attention for import technology of the tilting trains.
2001 Vol. 18 (4): 16-19 [Abstract] ( 2475 ) HTML (1 KB)  PDF  (132 KB)  ( 92 )
20 STUDY ON NON-DESTRUCTIVE TEST ON QUALIT OF RETAINING WALL OF ROADBED
LIU Cheng-jun
This paper puts forward a method of fast, handy, no-destructive and effective testing which can be used to test the strength and geometrical dimension of subgrade abamurus using the method of earthquake wave velocity and GPR (ground penetrating radar).This method can be used to definite the dimension and strength of abamurus by determining some physical parameters (such as elastic wave velocity and electromagnetic wave velocity etc.) and by the correlation of these physical parameters with mortar flag stones. The main contents of this paper arc as follows: the research of principle of testing the strength of abamurus using earthquake wave velocity, the research of principle of testing the geometrical dimension of abamurus using GPR method, the research of laboratory test of the correlation of the strength of abamurus with wave velocity and the field test and estimation. The research of this paper has effectively solve the trouble that perforating and slotting on the abamurus for sampling and validating is destructive, and can fleetly and accurately find the hidden danger of subgrade abamurus, so play an important role for ensuring safe driving. There are remarkable economic and social benefits.
2001 Vol. 18 (4): 20-23 [Abstract] ( 2500 ) HTML (1 KB)  PDF  (186 KB)  ( 166 )
24 RECONSTRUCTION OF STATION AND YARD DURING CONSTRUCTING No.2 LINE FOR BAO-CHENG RAILWAY
YANG Shi-wu
Based on the specialties of different-type stations on double-tracked railway line and the construction practices on reconstruction of station and yard, the construction scheme for reconstructing station and yard by stopping the up train operation and the down train operation respectively has been proposed, which is convenient for construction, having high efficiency and may guarantee quality more easy. It is a model with valuable reference for reconstruction of station and yard on double-tracked railway lines.
2001 Vol. 18 (4): 24-26 [Abstract] ( 2493 ) HTML (1 KB)  PDF  (139 KB)  ( 115 )
27 FUNCTION OF TRACK EVENNESS AND STRAIGHTNESS ON CWR'S SAFETY CONTROL
ZHAO Zhi-jun, CHEN Xiu-fang
This paper analyses the influence of track alignment irregularity on the CWR's stability, expatiates the important significance to insure the CWR's safety by avoiding reversed curve irregularity, reinforcing the scout to irregularity of track more than 5 m, and improving the evenness and straightness of welded track during maintenance work.
2001 Vol. 18 (4): 27-30 [Abstract] ( 2738 ) HTML (1 KB)  PDF  (188 KB)  ( 110 )
31 AN INITIAL STUDY ON QING-ZANG RAILWAY TRACK STRUCTURE
DUAN Gu-min
Qing-Zang Railway is a gigantic project in new century. This engineering has maximally complex and arduous nature. In accordance with a special geography condition of the plateau and the frozen soil area, this paper made the analysis and comparison to the possible railway track type paved on Qing-Zang line, advances some problems necessarily solved for improving technical function of the track parts.
2001 Vol. 18 (4): 31-33 [Abstract] ( 2525 ) HTML (1 KB)  PDF  (113 KB)  ( 94 )
34 STRONG COMPACTION TREATMENT ON THE BASE OF LOESS EMBANKMENT WITH WET SUBSIDENCE IN THE SANMENXIA-LINGBAO EXPRESSWAY
NIU Xi-shun, JIANG Yong-jun
Combined with the engineering practices in the Sanmenxia-Lingbao Expressway, the experiment, design and quality control for treating the silt ground with loess appearance and low liquid-limit by the strong compaction method are introduced more comprehensively in this paper.
2001 Vol. 18 (4): 34-37 [Abstract] ( 2486 ) HTML (1 KB)  PDF  (143 KB)  ( 139 )
38 NOISE & VIBRATION CAUSED BY URBAN RAIL TRANSIT AND MEASURES TAKEN TO CONTROL THEM
PENG Hua, YANG Guang-qing
As an important vehicle of big cities, the Urban Rail Transit has the merit of convenience, shortcut, on time, vast capacity, etc. In order to deal with traffic jam of big cities, the first choice is to build Urban Rail Transit. However, it also causes the environment pollution of noise and vibration for inhabitants and buildings along the railroad. Based on the analysis of the cause of noise and vibration, this paper suggests some measures to control them.
2001 Vol. 18 (4): 38-39 [Abstract] ( 2485 ) HTML (1 KB)  PDF  (168 KB)  ( 201 )
40 DISCUSSION ON PREDICTION OF THE LOSS OF SOIL AND WATER ALONG RAILWAY IN EVALUATION OF INFLUENCES ON ECOLOGICAL ENVIRONMENT DUE TO RAILWAY CONSTRUCTION
WANG Mei-zhi, YANG Cheng-yong, XU Zhao-yi
At present, the USLE was usually used to predict the loss of soil and water along railway in the evaluation of the influences on the ecological environment due to railway construction, and there had been several regional prediction equations in our country. In the paper, by comparison and analyzing, it was found that using LISLE directly to predict loss of soil and water along railway can lead to much error. In the end of the paper, several suggestions about predicting loss of soil and water along railway were proposed.
2001 Vol. 18 (4): 40-43 [Abstract] ( 2496 ) HTML (1 KB)  PDF  (199 KB)  ( 184 )
44 EXPLORATION ON PROBLEMS CONCERNED WITH EXPRIENCES FOR DESIGN OF SUBWAYS
ZHANG Pei-zhu
Several aspects which should be taken into attention in the design of rail line and stations for subways and the partial basic experiences are described briefly in this paper. Some problems concerned with the design of subway projects are explored, and several suggestions are proposed.
2001 Vol. 18 (4): 44-46 [Abstract] ( 2547 ) HTML (1 KB)  PDF  (150 KB)  ( 356 )
47 DISCUSSION ON TECHNOLOGY FOR CONNECTING NEWLY BUILT STRUCTURE TO PRISTINE STRUCTURE IN REBUILDING OF TIANJIN SUBWAY
GAO Shu-feng
This paper introduces a special method to make waterproof retaining at the joint, the setting of construction joint connecting the newly built structure to the pristine structure, the waterproof design and construction technology, the method to prevent from settlement of the newly built structure and the pristine structure, etc. Hope that some references may be obtained for the congeneric engineering.
2001 Vol. 18 (4): 47-49 [Abstract] ( 2548 ) HTML (1 KB)  PDF  (142 KB)  ( 170 )
50 APPLICATION OF FABRIC CONCRETE FOR SELF-WATERPROOF OF STRUCTURE IN CONSTRUCTION OF SUBWAY STATIONS
DIAO Tian-xiang, FANG Jun-bo
The DULA fabric is a new-type material added into the concrete which may be used for self-water-proof of the structures. Based on its mechanism analysis, construction in situ and experimental tests, the paper proposes an effective construction method as treatment for preventing the crack and seepage of concrete in the structures.
2001 Vol. 18 (4): 50-53 [Abstract] ( 2480 ) HTML (1 KB)  PDF  (160 KB)  ( 98 )
54 ANALYSIS ON CONTROL OF ENGINEERING COST FOR SUBWAYS
WANG Li-gang
The current situation of subway engineering cost and the general principles for controlling the engineering cost arc analyzed. The controls of sectional engineering costs according to the constructing procedure of the project are discussed emphatically. Combined with the technical, economic and other methods, the reasonable determination and control of engineering cost for urban rapid rail transit are analyzed synthetically also in this paper.
2001 Vol. 18 (4): 54-58 [Abstract] ( 2476 ) HTML (1 KB)  PDF  (143 KB)  ( 516 )
59 EXPLORATION ON ORGANIZATION OF TRAIN OPERATION FOR URBAN RAIL TRANSIT
WANG Yin-fu, LEI Zhi-hou
The organization works of passenger train operation for large-scale urban rail transit during the earlier stage of construction should be designed according to the organization of running the express trains and the slow trains. This method may create an excellent "hardware” environment for operation departments to raise their service level. The division of running the express trains and the slow trains is aimed at running slow trains to satisfy the requirement of passengers along the rail lines up and down the trains, while running express trains to satisfy the requirement of the "long-legs" passengers up and down the trains between the surrounding cities and the surrounding cities with the central city. The basic service purpose of urban rail transit is aimed at to satisfy the requirement of different travelling distances and to shorten the travelling times.
2001 Vol. 18 (4): 59-63 [Abstract] ( 2549 ) HTML (1 KB)  PDF  (204 KB)  ( 535 )
64 URBAN LIGHT-RAIL TRANSIT AND NEW TRAFFIC SYSTEM IN EURAPE URBAN LIGHT-RAIL TRANSIT AND NEW TRAFFIC SYSTEM IN EUROPE
NI Feng-chun
In recent years, the development of urban light-rail transit and a new tendency advanced to the standardization of light-rail vehicles in Europe arc expounded. At the same time, a bi-system traffic system suitable for the urban construction has been introduced in this paper. For the light-rail vehicles in this system, the rubber wheel tires were used for train running, and they may be used running on the special railway line also. These vehicles possess the advantages of low cost, reducing the transfer for passengers and being both usable on highways and railways. It may be used as reference for urban planning and construction of light-rail transit hereafter.
2001 Vol. 18 (4): 64-66 [Abstract] ( 2509 ) HTML (1 KB)  PDF  (194 KB)  ( 226 )
67 DESIGN AND CONSTRUCTION TECHNIQUES OF VERTICAL TURNING OF STEEL TUBE ARCH FOR GULIIANG RIVER NO.3 BRIDGE
ZHANG Fan-qi
The following aspects arc introduced in this paper, such as the design of tower structure for vertical turning of steel tube arches and its drawing and turning system, the construction check and calculations and the construction monitoring, the construction technology of vertical turning, etc.
2001 Vol. 18 (4): 67-70 [Abstract] ( 2490 ) HTML (1 KB)  PDF  (142 KB)  ( 99 )
71 ANALYSIS ON DEFECTS OF BRIDGE STRUCTURE IN ENGINEERING PRACTICES
LU Lan-ping, ZHANG You-zhi
The inner wall of bridge abutment creates partial defects during drilling holes. It is a macroscopic crack problem having clear geometric boundary. Based on the analyses of stress, strain and displacement along the whole boundary and at the front of cracks, the extension of cracks and the safety of structure are forecasted. During analyses, the internal defects distributed in materials are evolved and developed into macroscopic cracks having determinate geometric dimensions, and the statics properties under different applied loads before and after drilling holes in bridge abutment are researched. By using finite clement method, the elasticity analysis has been put forward on plane stress for abutment wall after drilling holes. The partial defects along the boundary of holes are analyzed also according to the scattered crack model. Through the discussions on the developed length and width of the cracks, the safety of bridge abutment after technical reform may be determined.
2001 Vol. 18 (4): 71-74 [Abstract] ( 2514 ) HTML (1 KB)  PDF  (174 KB)  ( 91 )
75 DESIGN OF PRESTRESSED ANCHOR BOLTS AND SIMULATING CALCULATION BY FINITE ELEMENT METHOD FOR ANCHOR BOLT-SPRAY SUPPORT IN BIG-SPAN TUNNEL WITH HARD ROCKS
ZHOU Shu-ming
The active mechanism, designing and construction method of the prestressed anchor bolts by the finite element method, simulating to calculate a skating rink which is 20.9 m width arc explored in this paper. It provides the designing and constructing experiences for the similar engineering projects in future.
2001 Vol. 18 (4): 75-79 [Abstract] ( 2550 ) HTML (1 KB)  PDF  (214 KB)  ( 89 )
80 CONSTRUCTION TECHNOLOGY OF MASS PILES AND HIGH PIE BRIDGE WITH LONG SPAN AND RIGID FRAME-CONTINUOUS COMPOSITE BEAM
LIU Jin-liang
The article gives a minute description of the comprehensive construction technology of Lizhigou Bridge in Nei-Kun Railway Line. The main introduction includes the quick construction technology for deep foundation mass piles, the temperature control and preventing breaking technology for mass concrete, the prepare, manufacture and construction technology of rectangular variable cross section hydraulic lifting platform climbing frame, the line model control technology for high pier, the quick construction and joining technology for rigid frame-high piers, the technology of mechanization of comprehensive and complete sets, etc. It has achieved famous technologic, economic and social benefit, and provided successful experience for the future similar projects. It was worth to spread and apply widely.
2001 Vol. 18 (4): 80-84 [Abstract] ( 2512 ) HTML (1 KB)  PDF  (219 KB)  ( 123 )
85 SURVEYING DISTRIBUTION OF GPS CONTROL NETWORK FOR EXTRA-LONG TUNNEL AND ITS ACCURACY
ZHANG Xiang-duo
Taking the Qinling Tunnel engineering project as example and the survey and design as presupposition, the paper expounds the surveying distribution method by using the GPS control network for the extra-long tunnel, including the design of working scheme, outdoor reconnaissance and the resolving calculation and evaluation of traverse's vectors, the lateral error of control network and its accuracy and reliability, etc. At the same time, the relative existing problems in surveying distribution and the matters for which attention should be paid are also introduced briefly in this paper.
2001 Vol. 18 (4): 85-88 [Abstract] ( 2549 ) HTML (1 KB)  PDF  (171 KB)  ( 117 )
89 APPLICATION OF TILTMETER SYSTEM IN STABILITY MONITORING OF DAYAOSHAN TUNNEL
ZHANG Yu, SONG Ye
In this paper, a case history of the application of tiltmeter system to monitor the stability of tunnel is introduced. In Dayaoshan Tunnel, the tilting deformation measurement of side wall is carried out by tiltmeter system at No.9 fault section during the construction of parallel water tunnel in order to understand to which extent the stability of existing main tunnel shall be influenced by the excavation of adjacent water tunnel. It proves that the tiltmeter system is an easy and promising measurement measure, which can measure the peripheral tilting deformation of tunnel and accurately monitor the influence due to the excavation of adjacent tunnel.
2001 Vol. 18 (4): 89-92 [Abstract] ( 2557 ) HTML (1 KB)  PDF  (162 KB)  ( 194 )
93 APPLYING TECHNIQUE OF CONTINUOUS ELASTIC FOUNDATION GROUND BEAM IN CONSTRUCTION OF TUNNEL
QI Feng-wu, WANG Jian
By applying the technique of continuous elastic foundation ground beam, the problem concerned with the bearing capacity of foundation ground may be solved. Under the prerequisite to satisfy structural design, engineering quality and construction safety, unnecessary large area excavation may be reduced, accident occurred against construction safety and the waste of manpower and material resources may be avoided, so as to raise the working efficiency and to reduce the time limit for the project.
2001 Vol. 18 (4): 93-95 [Abstract] ( 2534 ) HTML (1 KB)  PDF  (113 KB)  ( 113 )
96 COMPREHENSIVE CONSTRUCTION TECHNIQUE OF TUNNEL IN SOFT SOIL
ZHANG Huan-cheng, YANG Shao-hong
Combined with engineering example, the construction practice of tunneling is introduced for the tunnel whose entrance stands at harmful geologic conditions of shallow-cover and groove with soft soil. In the course of construction, the techniques were adopted interactively, such as the pre-anchor pile, entrance gate joined with anchor pile, steel tube pile, anchor-tube injected with slurry, continuous underground wall of vertical spraying pile super fore-canula injected with slurry, tubular shed arranged closely, timbering with steel annularity arch, hanging meshwork and anchor bolt spraying, with temporary ob-arch, foresetting ob-arch, built by concrete following closely, floor spraying pile in tunnel done in time and so on. It triumphantly resolved the thorny problems about the entrance of tunnel full floating on soft soil to start digging, excavate, support, build with concrete, etc. For heavy rain tempestuous crack of the temporary shoring, the tracking measure and the construction treatment arc introduced. It can be used for reference to design and construct tunnel under harmful geologic conditions.
2001 Vol. 18 (4): 96-99 [Abstract] ( 2548 ) HTML (1 KB)  PDF  (134 KB)  ( 148 )
100 TREATMENT ON LARGE-SCALE LANDSLIDE FOR LONG-SPAN HIGHWAY TUNNEL
ZHANG Chong-dong
The schemes for treating the large-scale landslide in the long-span tunnel lay on the treatment of subsided pit at first. The side slopes of subsided pit are stabilized by grouting concrete reinforced with meshwork. Then, by deep-hole grouting several times, the funnel-typed porous soil during subsidence may be strengthened and stabilized. During construction inside of the tunnel, the advance auxiliary tunneling method with small ducts was used through the twin-side headings for excavation. The primary supports should be put forward after excavation immediately, and constructing the secondary lining immediately behind the primary supports. The practices show that the above schemes are scientific.
2001 Vol. 18 (4): 100-103 [Abstract] ( 2547 ) HTML (1 KB)  PDF  (177 KB)  ( 218 )
104 STABILITY DETECTION OF RAISING-SPEED SUBGRADE BY USING INSTANTANEOUS RAYLEIGH WAVE METHOD
HE Zhen-qi, LI Hai, GUO You-jing
The instantaneous Rayleigh wave method is a new and developing geotechnical in-situ test method, in which the quality of subgrade may be detected by utilizing its frequency scatter specialty and propagating speed and their relationship with the physics-mechanics properties of the subgrade soil. The principle, method and evaluation standards for detecting raising-speed subgrade by using the instantaneous Rayleigh wave method are introduced briefly in this paper. A practical engineering example is introduced briefly also.
2001 Vol. 18 (4): 104-106 [Abstract] ( 2487 ) HTML (1 KB)  PDF  (153 KB)  ( 115 )
107 EXPLORATION ON ADOPTING GROUNDWATER AS THE WATER CONTENT OF UNDERGROUND ENGINEERING WORKS
MENG Shu-hui
Combined with the construction of the limestone sections of Dayaoshan Tunnel, the meteorological and hydrologic data were collected; the examination and test were put forward and compared with the water content of the practical engineering works. The feasibility of adopting the groundwater as the water content of underground engineering works arc proposed. The examined water amount may be in accordance with the practical engineering works, and it provides the reference for the similar engineering works hereafter.
2001 Vol. 18 (4): 107-111 [Abstract] ( 2503 ) HTML (1 KB)  PDF  (131 KB)  ( 145 )
112 RAILWAY ENGINEERING GEOLOGY ROUTE SELECTION IN MULTIYEAR FROZEN EARTH REGION
ZHOU Hu-li
Based on the analysis of geologic characteristics and unfavorable geology in the multiyear frozen region, combined with the disaster in the zone with multiyear frozen earth along the Qing-Zang Railway and Qing-Zang Highway, the paper discusses the railway engineering geology route selection and the engineering measures in multiyear frozen earth region.
2001 Vol. 18 (4): 112-115 [Abstract] ( 2475 ) HTML (1 KB)  PDF  (160 KB)  ( 130 )
118 STUDY AND CONSTRUCTION OF CONCRETE PAVEMENT BY USING VACUUM DEHYDRATION TECHNOLOGY
LIU Hui
Based on the specialties of concrete for pavement which require objectively the compatibility high anti-crack and earlier solidification, and in addition, the mechanism of vacuum dehydration technology which may render the concrete compact are earlier solidified, therefore, combined with the construction practices, the vacuum dehydration treating technology was adopted in construction of concrete pavement plate for the Ertan Power Station, The earlier solidification mechanism on concrete by using vacuum dehydration technology in based mainly on: (1)the principle of solidification by compaction, (2)the change regularity on transmission of the degree of vacuum. The main construction procedures of vacuum treated concrete arc: (1) the selection of mixture ratio, (2) the implementation of vacuum dehydration technology, (3) the prevention of initial cracks. Although the vacuum treated concrete has the earlier solidification compatibility, high anti-crack and wear resisting properties but due to the uneven of vacuum transmission, the final utilization effect of the concrete should be resolved through further researches.
2001 Vol. 18 (4): 118-122 [Abstract] ( 2533 ) HTML (1 KB)  PDF  (212 KB)  ( 209 )
121 LOADING TEST OF PC TIE-BAR-ARCH BRIDGE
LI Tao
The Lanzhou Xincheng Yellow River Bridge is the first PC tic-bar-arch structure in China. It has opened to traffic 40 years and over. This paper introduces the static and dynamic load test and the theory analysis of this bridge. The conclusions of the bearing capacity and the safety evaluation of the bridge are also presented.
2001 Vol. 18 (4): 121-123 [Abstract] ( 2508 ) HTML (1 KB)  PDF  (154 KB)  ( 119 )
124 STUDY ON CHOICE OF VARIED SCHEMES FOR RAILWAY CONSTRUCTION
YANG Cuang-qing, JIAO Jing-qing
According to the situation of disjunction among the construction scheme, construction progress and construction cost in drafting the new item for railway construction enterprise, the theory of "the mate of overall position”, based on the choice of varied schemes for trinity and the analysis of profit and loss for construction schemes has been proposed. The software of choice of varied schemes for railway construction is exploited. The theory is good fit for the construction based on the application.
2001 Vol. 18 (4): 124-127 [Abstract] ( 2457 ) HTML (1 KB)  PDF  (126 KB)  ( 147 )
128 ANALYSIS ON LAUNCHING METHOD AND EQUIPMENT OF BOX BEAM FOR HIGH SPEED RAILWAY
DING Rong-chang
The launching box beam task of the Qin-Shen high speed railway construction is a dominant engineering. In the base of analyzing launching methods and equipments for high speed railway in our China, this paper introduced in detail the function, characteristics, technical specification and working conditions of JQ600 launching equipment, so as to provide useful reference for design and construction hereafter.
2001 Vol. 18 (4): 128-131 [Abstract] ( 2514 ) HTML (1 KB)  PDF  (164 KB)  ( 241 )
132 STUDY ON BLAST TECHNIQUE FOR DOUBLE-TRACKING OF ELECTRIFIED RAILWAYS
LI Ya-lin
The construction works of controlled blasting at near sides of existing electrified railways are summarized, the controlled blasting schemes under different rock situations arc analyzed, and the particular measures to guarantee the safety operation on the existing railway line arc proposed. Reference has been provided for the similar construction works hereafter.
2001 Vol. 18 (4): 132-134 [Abstract] ( 2488 ) HTML (1 KB)  PDF  (109 KB)  ( 209 )
135 CALCULATING TECHNIQUE ON DIFFERENCE OF COST OF MATERIALS IN BUDGETARY ESTIMATE OF DESIGN FOR XI’AN-ANKANG RAILWAY
FENG Yun-ping, HUANG Jin-chang
In the budgetary estimate of design for the Xi'an-Ankang Railway, when the contradictory appeared during the implementation of the relative policy stipulations, the adopted technique and its consideration for calculating the difference of the cost of the materials are introduced in this paper. Furthermore, the thinking and conception induced by the questions are proposed. It is emphasized that we should combine with practical situations and control & apply flexibly the relative methods and stipulations.
2001 Vol. 18 (4): 135-136 [Abstract] ( 2497 ) HTML (1 KB)  PDF  (98 KB)  ( 97 )
137 STUDY ON APPLICATION OF BOT INVESTMENT MODE FOR RAILWAY CONSTRUCTION IN CHINA
LI Bo
The BOT investment mode is an investment means for the construction of basic installations which is popular international in present times. The studies are put forward concerned with the following aspects of the BOT investment mode, such as its superiorities, risks, participants, implementation conditions, etc. The feasibilities of applying the BOT investment mode for problems are proposed, and clear conclusion has been railway construction in China are analyzed, the existing obtained.
2001 Vol. 18 (4): 137-140 [Abstract] ( 2556 ) HTML (1 KB)  PDF  (132 KB)  ( 129 )
141 ELEMENTARY INTRODUCTION ON QUALITY CONTROL IN CONSTRUCTION STAGE FOR ENGINEERING PROJECTS
PENG Jing-shu
The procedure and particular methods of engineering quality control in construction stage of engineering projects adopted by supervising engineers are introduced in this paper. And it can be used for reference by supervising engineers in quality control processes.
2001 Vol. 18 (4): 141-144 [Abstract] ( 2551 ) HTML (1 KB)  PDF  (129 KB)  ( 216 )
145 EXPLORATION ON OPTIMIZED REORGANIZATION FOR ASSETS OF ARCHITECTURAL ENTERPRISE GROUPS
ZHANG Lan-xue
Based on analysis of the reasons of the bad operation situation on the assets of architectural enterprise groups, the principle and target of the optimized assets reorganization are worked out, and the implementation schemes of optimized assets reorganization for architectural enterprise groups are proposed.
2001 Vol. 18 (4): 145-147 [Abstract] ( 2487 ) HTML (1 KB)  PDF  (98 KB)  ( 107 )
148 EXPLORATION ON STRENGTHENING MANAGEMENT OF MATERIAL SUPPLY TO REDUCE THE ENGINEERING COST
DONG Zhan-guo
The cost of materials was usually equated to the 60%~65% of the engineering cost. Therefore, to strengthen the management of material supply is an important means to reduce the engineering cost for the construction enterprises. The paper expounds in detail concerned with the following aspects, such as strengthening the management of the purchase of materials, strengthening the management of the expenditure of materials, as well as developing material cost accounting to raise the management level, etc.
2001 Vol. 18 (4): 148-151 [Abstract] ( 2475 ) HTML (1 KB)  PDF  (138 KB)  ( 274 )
152 WORKING OUT ORGANIZATION DESIGN FOR CONSTRUCTING AN ENGINEERING PROJECT
LI Xin-rong
The essential document required to be worked out for general architectural engineering project is the organization design of the unit engineering project. Taking this document as key point, the following aspects are expounded in detail, such as the principles and the bases for working out this document, the general situation of the engineering project and its main contents, the construction deployment, preparation and procedure planning, as well as the construction methods for main project items, etc.
2001 Vol. 18 (4): 152-154 [Abstract] ( 2539 ) HTML (1 KB)  PDF  (119 KB)  ( 923 )
155 STUDY ON SEVERAL PROBLEMS CONCERNED WITH THE ESTABLISHMENT OF JOINT FUND
TAN Jing
The paper describes the definition, specialties and the history and developing tendency of the joint fund. The risks and profits of the joint fund are analyzed. The practical meanings for establishing the joint fund are proposed. Finally, the paper proposes that the railway investment funds should be established as soon as possible.
2001 Vol. 18 (4): 155-157 [Abstract] ( 2528 ) HTML (1 KB)  PDF  (110 KB)  ( 96 )
Copyright © Editorial Board of Journal of Railway Engineering Society
Supported by:Beijing Magtech